W.M. Roebuck, Incorporated: SCDOT bid record
W.M. Roebuck, Incorporated submitted 39 bids on South Carolina DOT contracts in the data, from 12 APR 2022 to 09 SEP 2026, and was the low bidder on 24 of them (62%). When it was not low, its total sat a median +27% above the low bid.
- Owner
- South Carolina DOT
- Low bid volume
- $26,149,664
- Latest bid
- 09 SEP 2026
- Data through
- 13 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2022 | 6 | 1 | 17% |
| 2023 | 7 | 5 | 71% |
| 2024 | 8 | 7 | 88% |
| 2025 | 10 | 6 | 60% |
| 2026 | 8 | 5 | 63% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| District 2 | 6 | 5 | 83% |
| District 7 | 6 | 2 | 33% |
| District 3 | 5 | 4 | 80% |
| Statewide | 5 | 2 | 40% |
| District 4 | 4 | 2 | 50% |
| District 6 | 4 | 2 | 50% |
| District 1 | 4 | 3 | 75% |
| District 5 | 2 | 2 | 100% |
| Statewide (Multiple Counties) | 1 | 1 | 100% |
| District 1, District 5 | 1 | 1 | 100% |
| District 1, District 4 | 1 | 0 | 0% |
Pay items where it is most often lowest
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Walker Brothers, Inc. | 19 | 9 of 19 |
| Little Mountain Contracting, LLC | 6 | 4 of 6 |
| Iron City Its Services, LLC | 5 | 1 of 5 |
| Premier Constructors, Inc. | 4 | 0 of 4 |
| Lumin8 Transportation Technologies, LLC | 4 | 2 of 4 |
| Grant Electrical Contracting, LLC | 3 | 3 of 3 |
| Haynes Electric Utility, A Division of MB | 3 | 2 of 3 |
| Als of North Carolina, LLC | 2 | 1 of 2 |
| Reynolds Fence & Guardrail, Inc. | 2 | 1 of 2 |
| Red Electrical Designs, LLC | 1 | 0 of 1 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 09 SEP 2026 | 5476870 | District 2 | District 4 FYA Signal Upgrades | 1 of 2 | $157,678 | Low, 21% under the second |
| 09 SEP 2026 | 5776880 | District 2 | District 7 FYA Signal Upgrades | 1 of 2 | $107,558 | Low, 16% under the second |
| 11 AUG 2026 | 1077530 | District 6 | Type II Signal Rebuilds Dist. 6 | 2 of 2 | $1,499,079 | +29% |
| 14 APR 2026 | 0260470 | District 7 | Type II Traffic Signal Upgrades in District 7 | 1 of 4 | $688,854 | Low, 22% under the second |
| 10 FEB 2026 | 3260750 | District 1 | Type II Traffic Signal Rebuilds in District 1 | 1 of 3 | $704,038 | Low, 39% under the second |
| 10 FEB 2026 | 8876270 | Statewide | 2026 Overhead Sign Replacment | 1 of 3 | $1,494,500 | Low, 8.0% under the second |
| 13 JAN 2026 | 8873290 | District 1, District 4 | I-77 Safety Improvements MM 0 - MM 30 | 3 of 3 | $3,911,940 | +138% |
| 13 JAN 2026 | 8875980 | Statewide | 2026 Lower State On-Call Signing | 2 of 3 | $1,930,349 | +1.0% |
| 09 DEC 2025 | 8875890 | Statewide | 2026 Upper State On-call Signing | 2 of 2 | $2,084,179 | +6.0% |
| 12 NOV 2025 | 2056600 | District 4 | Traffic Signal Upgrade - US 21 at SC 34 | 3 of 3 | $399,300 | +66% |
| 09 SEP 2025 | 0972890 | District 7 | Traffic Signal Upgrade in St. Matthews, SC | 1 of 1 | $699,366 | Low |
| 09 SEP 2025 | 5473240 | District 4 | Traffic Signal Upgrades in District 4 | 1 of 2 | $1,880,348 | Low, 11% under the second |
| 12 AUG 2025 | 4058481 | District 1 | Signal Rebuilds - District 1 | 1 of 3 | $217,068 | Low, 4.0% under the second |
| 10 JUN 2025 | 5771710 | District 7 | Traffic Signal Upgrade for District 7 | 2 of 2 | $823,378 | +4.0% |
| 13 MAY 2025 | 5761880 | District 7 | Type II Traffic Signal Upgrade District 7 | 2 of 2 | $648,798 | +9.0% |
| 08 APR 2025 | 2361472 | District 3 | Signal Upgrades - City of Greenville | 1 of 1 | $1,678,762 | Low |
| 11 MAR 2025 | 4357120 | District 1 | Signal Upgrades - District 1 | 1 of 1 | $795,447 | Low |
| 11 MAR 2025 | 5361690 | District 3 | Type II Traffic Signal Rebuild District 3 RY23 | 1 of 2 | $788,092 | Low, 7.0% under the second |
| 13 NOV 2024 | 2360480 | District 3 | Type II Traffic Signal Upgrades on SC 291 in Greenville | 1 of 1 | $1,240,226 | Low |
| 10 SEP 2024 | 5457171 | District 4 | Type II Signal Rebuilds D4 | 1 of 1 | $1,034,840 | Low |
| 10 SEP 2024 | 8870240 | District 1, District 5 | I-95 Resigning | 1 of 2 | $1,215,399 | Low, 8.0% under the second |
| 13 AUG 2024 | 0768641 | District 6 | Type II Traffic Signal Upgrades City of Beaufort FY24 | 1 of 1 | $1,217,913 | Low |
| 09 JUL 2024 | 5769540 | District 7 | Type II Traffic Signal Installation at SC 19 and S-816 D7 | 2 of 2 | $384,736 | +58% |
| 09 APR 2024 | 5260330 | District 2 | Traffic Signal Rebuilds in District 2 | 1 of 2 | $2,908,656 | Low, 43% under the second |
| 12 MAR 2024 | 5360951 | District 3 | Type II Traffic Signal Rebuilds in District 3 FY2022 | 1 of 2 | $1,979,972 | Low, 0.0% under the second |
How this record was read
SCDOT Tabulation of Bids PDFs, one per contract, from its public bid tabulation library, January 2022 to October 2026, with bidder names from each contract's vendor ranking. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; SCDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.