SCDOT contract 5562110 bid tabulation
Big Dam Swamp Intersection Improvement. Let by South Carolina DOT on November 12, 2025, Georgetown, Williamsburg, District 5. 4 bids received; low bid $999,829 by Coastal Asphalt, LLC.
- Owner
- South Carolina DOT
- Letting
- 12 NOV 2025
- Pay items
- 75
- Data through
- 13 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Coastal Asphalt, LLC | $999,829 | Low |
| 2 | L & L Contractors, Inc. | $1,235,044 | +24% |
| 3 | Palmetto Corp. of Conway | $1,614,465 | +61% |
| 4 | Psi of Conway, LLC | $1,653,801 | +65% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Coastal Asphalt, LLC | 2. L & L Contractors, Inc. | 3. Palmetto Corp. of Conway | 4. Psi of Conway, LLC |
|---|---|---|---|---|---|---|---|
| 0010 | Mobilization (1031000) | LS | 1 | $49,000 | $61,000 | $80,000 | $172,606 |
| 0020 | Bonds and insurance (1032010) | LS | 1 | $7,200.00 | $24,000 | $30,000 | $24,200 |
| 0030 | Construction stakes, lines & grades (1050800) | EACH | 1 | $9,800.00 | $35,000 | $30,000 | $19,000 |
| 0040 | CPM progress schedule (1080300) | LS | 1 | $3,600.00 | $15,000 | $5,000.00 | $15,000 |
| 0050 | Clearing & grubbing within right of way (2011000) | LS | 1 | $22,000 | $92,305 | $232,500 | $42,587 |
| 0060 | Removal & disposal of existing asphalt pavement (2025000) | SY | 2,106 | $5.10 | $12.00 | $16.15 | $25.07 |
| 0070 | Unclassified excavation (2031000) | CY | 2,551 | $27.90 | $30.00 | $43.40 | $15.80 |
| 0080 | Borrow excavation (2033000) | CY | 818 | $27.00 | $33.00 | $56.85 | $101.55 |
| 0090 | Fine grading (2081001) | SY | 4,949 | $3.05 | $5.00 | $5.30 | $6.00 |
| 0100 | Maintenance stone (3059900) | TON | 50 | $44.00 | $65.00 | $170.00 | $170.86 |
| 0110 | Liquid asphalt binder PG64-22 (4011004) | TON | 159 | $685.00 | $685.00 | $605.00 | $660.00 |
| 0120 | Full depth asph. pav. patching 6" unif. (4012060) | SY | 25 | $205.00 | $205.00 | $314.85 | $855.00 |
| 0130 | Milling existing asphalt pavement (variable) (4013990) | SY | 100 | $115.00 | $115.00 | $37.95 | $78.00 |
| 0140 | Asphalt base course - type A (4020310) | TON | 1,418 | $120.00 | $120.00 | $147.10 | $117.50 |
| 0150 | Asphalt intermediate course type B (4030320) | TON | 1,024 | $120.00 | $120.00 | $149.10 | $130.00 |
| 0160 | Asphalt surface course type B (4040320) | TON | 686 | $125.00 | $125.00 | $143.60 | $135.00 |
| 0170 | Traffic control (6011000) | LS | 1 | $41,500 | $76,000 | $150,000 | $100,000 |
| 0190 | Permanent construction signs (ground mounted) (6051120) | SF | 228 | $7.50 | $7.50 | $6.95 | $15.65 |
| 0191 | Temporary yellow pavement markers mono-dir.- 4"X4" (6092150) | EACH | 60 | $8.50 | $8.50 | $8.50 | $100.00 |
| 0192 | 4" white broken lines -(gaps excluded)-fast dry paint (6240005) | LF | 100 | $0.10 | $0.10 | $0.10 | $0.25 |
| 0200 | 4" white solid lines (PVT. edge lines)-fast dry paint (6240010) | LF | 3,163 | $0.10 | $0.10 | $0.10 | $0.25 |
| 0205 | 6" white solid lines (PVT. edge lines)-fast dry paint (6240012) | LF | 1,000 | $0.15 | $0.15 | $0.15 | $0.50 |
| 0210 | 24" white solid lines (stop/diagonal lines)-fast dry paint (6240025) | LF | 90 | $0.25 | $0.25 | $0.25 | $3.00 |
| 0220 | 4"yellow solid line(PVT.edge&no passing zone)-fast dry paint (6240110) | LF | 2,660 | $0.10 | $0.10 | $0.10 | $0.25 |
| 0221 | 6"yellow solid line(PVT.edge&no passing zone)-fast dry paint (6240111) | LF | 1,000 | $0.15 | $0.15 | $0.15 | $0.50 |
| 0222 | 4" white broken lines(gaps excl.)thermoplastic- 90 mil. (6271005) | LF | 100 | $0.60 | $0.60 | $0.60 | $1.00 |
| 0230 | 4" white solid lines (PVT. edge lines) thermo.- 90 mil. (6271010) | LF | 3,163 | $0.60 | $0.60 | $0.60 | $1.00 |
| 0231 | 6" white solid lines (PVT. edge lines) thermo.- 90 mil. (6271012) | LF | 1,000 | $0.90 | $0.90 | $0.90 | $1.50 |
| 0235 | 6" yellow solid lines(PVT.edge lines) thermo- 90 mil. (6271076) | LF | 1,000 | $0.90 | $0.90 | $0.90 | $1.50 |
| 0240 | 24" white solid lines (stop/diag lines)-thermo.-125 mil (6271025) | LF | 90 | $8.50 | $8.50 | $8.50 | $35.00 |
| 0250 | 4" yellow solid lines(PVT.edge lines) thermo- 90 mil. (6271074) | LF | 2,660 | $0.60 | $0.60 | $0.60 | $1.00 |
| 0260 | Permanent yellow pavement markers mono-dir.- 4"X 4" perm. yel. (6301005) | EACH | 60 | $8.50 | $8.50 | $8.50 | $25.00 |
| 0270 | Removal of pavement markings (6319505) | LF | 122 | $1.50 | $1.50 | $1.50 | $100.00 |
| 0275 | Milled-in rumble strip (6321000) | MI | 0.44 | $1.00 | $1,000.00 | $500.00 | $500.00 |
| 0280 | Flat sheet, type III, fixed SZ. & MSG. sign (6510105) | SF | 96 | $13.00 | $25.00 | $26.50 | $42.67 |
| 0281 | Flat sheet, type III, size determined by MSG (6510106) | SF | 40 | $13.00 | $13.00 | $26.50 | $42.67 |
| 0290 | U-section post for sign supports - 3P (6531210) | LF | 210 | $8.50 | $8.50 | $8.85 | $22.86 |
| 0291 | Reflective sign post panels (6531500) | LF | 18 | $13.00 | $10.00 | $8.95 | $6.17 |
| 0292 | Barricade - permanent with type III sheeting (6584690) | LF | 72 | $25.00 | $25.00 | $25.00 | $50.00 |
| 0310 | 18" smooth wall pipe (7143618) | LF | 522 | $96.00 | $150.00 | $150.00 | $319.26 |
| 0320 | Cleaning existing pipe (7149999) | LF | 600 | $36.00 | $12.50 | $18.00 | $101.81 |
| 0330 | Drop inlet (24" X 36") (7192020) | EACH | 2 | $3,600.00 | $7,100.00 | $4,825.00 | $10,643 |
| 0331 | Manhole (7192105) | EACH | 1 | $1,800.00 | $7,100.00 | $3,290.00 | $11,085 |
| 0340 | Concrete collar for UP to 24" pipe (7197052) | EACH | 1 | $4,000.00 | $3,500.00 | $5,600.00 | $7,502.49 |
| 0341 | Manhole-convert catch basin (7198495) | EACH | 2 | $2,500.00 | $2,500.00 | $3,075.00 | $11,333 |
| 0342 | Beveling of pipe end (7199100) | EACH | 4 | $210.00 | $650.00 | $850.00 | $2,175.61 |
| 0360 | Rip-rap (class B) (8041020) | TON | 242 | $125.00 | $150.00 | $218.00 | $343.03 |
| 0370 | Geotextile for erosion control under riprap(class 2)type D (8048215) | SY | 305 | $4.50 | $5.00 | $9.50 | $3.14 |
| 0375 | Temporary barrier fence (orange) (8068301) | LF | 800 | $3.25 | $5.00 | $4.00 | $3.25 |
| 0376 | Reset fence (8071000) | LF | 373 | $26.00 | $25.00 | $20.00 | $20.00 |
| 0377 | Moving item no. 02 (8081000) | LS | 1 | $1,000.00 | $1,650.00 | $1,500.00 | $1,500.00 |
| 0378 | Moving item no. 04 (8081000) | LS | 1 | $4,500.00 | $2,750.00 | $2,500.00 | $2,500.00 |
| 0380 | Right of way marker(rebar and cap) (8091010) | EACH | 28 | $89.29 | $150.00 | $65.00 | $89.29 |
| 0390 | Right of way plat (8091050) | LS | 1 | $1,500.00 | $4,500.00 | $7,500.00 | $1,500.00 |
| 0400 | Permanent cover (8100100) | ACRE | 3.30 | $1,481.74 | $1,500.00 | $1,481.74 | $1,481.74 |
| 0410 | Temporary cover (8100200) | ACRE | 1.65 | $935.40 | $936.00 | $935.40 | $935.40 |
| 0420 | Fertilizer (nitrogen) (8104005) | LB | 330 | $1.94 | $2.00 | $1.94 | $1.94 |
| 0430 | Fertilizer (phosphoric acid) (8104010) | LB | 330 | $1.94 | $2.00 | $1.94 | $1.94 |
| 0440 | Fertilizer (potash) (8104015) | LB | 330 | $1.94 | $2.00 | $1.94 | $1.94 |
| 0450 | Agricultural granular lime (8105005) | LB | 6,600 | $0.96 | $1.00 | $0.96 | $0.96 |
| 0460 | Selective watering (8109050) | GAL | 54,300 | $0.10 | $0.10 | $0.10 | $0.10 |
| 0470 | Mowing (8109901) | ACRE | 9.90 | $435.00 | $500.00 | $435.00 | $435.00 |
| 0471 | Temporary erosion control blanket (ecb) (8151110) | MSY | 0.93 | $2,485.00 | $2,500.00 | $2,485.00 | $2,485.00 |
| 0472 | Hydraulic erosion control product (hecp) - type 1 (8151201) | ACRE | 3.80 | $1,493.00 | $1,500.00 | $1,493.00 | $1,750.00 |
| 0473 | Hydraulic erosion control product (hecp) - type 3 (8151203) | ACRE | 0.95 | $3,613.00 | $3,650.00 | $3,613.00 | $3,613.00 |
| 0474 | Hydr.eros.contrl.prod. (hecp) - type 1 as tracer under TRM (8151209) | ACRE | 0.20 | $1,093.40 | $1,100.00 | $1,093.40 | $1,093.00 |
| 0480 | Sediment tubes for ditch checks (8152007) | LF | 222 | $11.00 | $11.00 | $11.00 | $11.00 |
| 0490 | Silt fence (8153000) | LF | 2,000 | $3.44 | $3.50 | $3.44 | $3.44 |
| 0500 | Replace/repair silt fence (8153090) | LF | 200 | $3.85 | $5.00 | $3.85 | $3.85 |
| 0510 | Cleaning silt basins (8154010) | CY | 200 | $30.00 | $10.00 | $27.00 | $100.00 |
| 0520 | Removal of silt retained by silt fence (8154050) | LF | 500 | $2.64 | $5.00 | $2.64 | $2.64 |
| 0521 | Inlet filter cleaning (8154155) | EACH | 7 | $180.00 | $200.00 | $180.00 | $180.00 |
| 0522 | Inlet structure filter - type A (8156219) | LF | 7 | $11.00 | $50.00 | $350.00 | $11.00 |
| 0530 | Aggregate no.5 for erosion control (6" uniform) (8156405) | SY | 5 | $300.00 | $150.00 | $300.00 | $108.76 |
| 0540 | Stabilized construction entrance (8156490) | SY | 550 | $46.00 | $30.00 | $38.20 | $28.33 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from SCDOT's tabulation for this contract. SCDOT Tabulation of Bids PDFs, one per contract, from its public bid tabulation library, January 2022 to October 2026, with bidder names from each contract's vendor ranking. Bids that did not match their published total are left out.
Every contract let that day: SCDOT letting of November 12, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.