SCDOT contract 5770780 bid tabulation

2025 Non-FA Secondary Pavement Improvement Program. Let by South Carolina DOT on January 14, 2025, Aiken, Allendale, Barnwell, District 7. 2 bids received; low bid $7,334,125 by Satterfield Construction Company, Inc..

Owner
South Carolina DOT
Letting
14 JAN 2025
Pay items
42
Data through
13 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Satterfield Construction Company, Inc.$7,334,125Low
2Blythe Construction, Inc.$8,541,764+16%
SCDOT contract 5770780: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Satterfield Construction Company, Inc.2. Blythe Construction, Inc.
0010Mobilization (1031000)LS1$315,000$426,900
0020Bonds and insurance (1032010)LS1$145,000$31,000
0030Removal of exist. guardrail (2027801)LF950$1.10$1.00
0040Borrow excavation (2033000)CY3,512$49.00$79.17
0050Excavation for shoulder paving (2036000)STA1,528.03$45.00$75.00
0060Hauling of excavated shoulder material (2072000)STA1,528.03$92.00$50.00
0070Maintenance stone (3059900)TON99.50$34.00$65.00
0080HMA shoulder widening course (3104000)TON7,308.11$89.50$119.40
0090Liquid asphalt binder PG64-22 (4011004)TON1,993.13$708.00$870.00
0100Aramid fiber (4011500)LB5,570$60.00$64.00
0110Full depth asph. pav. patching 4" unif. (4012040)SY3,270$42.00$55.00
0120Full depth asph. pav. patching 6" unif. (4012060)SY6,030$47.75$72.00
0130Full depth asph. pav. patching 8" unif (4012080)SY650$69.00$100.00
0140Milling existing asphalt pavement 1.75" (4013117)SY8,600$2.95$3.50
0150Milling existing asphalt pavement (variable) (4013990)SY8,300$8.15$7.50
0160Asphalt surface course type C (4040340)TON22,984.63$89.00$110.59
0170Asphalt surface course type D (4040350)TON2,042.60$110.00$146.06
0180Driveway paving-surface type D (4047230)TON721.88$189.00$248.93
0190Traffic control (6011000)LS1$580,000$353,141
0200Permanent construction signs (ground mounted) (6051120)SF1,460$5.75$5.25
02104" white broken lines -(gaps excluded)-fast dry paint (6240005)LF1,400$0.12$0.13
02204" white solid lines (PVT. edge lines)-fast dry paint (6240010)LF363,060$0.12$0.12
023024" white solid lines (stop/diagonal lines)-fast dry paint (6240025)LF1,420$1.10$1.00
0240White single arrow (left, straight, right)-fast dry paint (6240030)EACH2$27.50$30.00
02504" yellow broken lines(gaps exc) - fast dry paint (6240105)LF21,960$0.12$0.13
02604"yellow solid line(PVT.edge&no passing zone)-fast dry paint (6240110)LF255,980$0.12$0.12
02704" white broken lines(gaps excl.)perm.PVMT.marking (6251005)LF700$0.85$0.48
02804" white solid lines (PVT. edge lines) perm.PVMT.marking (6251010)LF181,530$0.55$0.46
029024" white solid lines (stop/diag lines)- perm.PVMT.marking (6251025)LF710$11.00$10.00
0300White single arrows (LT, STRGHT, RT) perm.PVMT.marking (6251030)EACH1$165.00$100.00
03104" yellow broken lines(gaps exc)perm.PVMT.marking (6251064)LF10,980$0.55$0.48
03204" yellow solid lines(PVT.edge lines) perm.PVMT.marking (6251074)LF127,990$0.55$0.46
0330Permanent yellow pavement markers BI-dir.- 4"X4" (6301100)EACH1,203$8.25$6.00
0340Milled-in rumble strip (6321000)MI39.06$852.50$1,009.51
0350Surface applied detectable warning (7209100)SF30$69.00$100.00
0360MT3 leading end treatment TL3 (8051151)EACH8$4,136.00$3,760.00
0370MGS3 GR standard shoulder (8052100)LF900$34.10$31.00
0380MGS3LS16 guardrail long span 16FT clear (8052125)LF100$38.50$35.00
0390Premash thrie strong post guardrail (8053050)LF650$49.50$45.00
0400Premash thriebeam bridge conn TBBC3 (8053250)EACH12$2,420.00$2,200.00
0410Premash type T TL3 leading 50' (8057100)EACH12$3,957.80$3,598.00
0420Permanent grassing for non-permitted resurfacing projects (8100102)ACRE17.56$2,585.00$2,750.00
SCDOT contract 5770780: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from SCDOT's tabulation for this contract. SCDOT Tabulation of Bids PDFs, one per contract, from its public bid tabulation library, January 2022 to October 2026, with bidder names from each contract's vendor ranking. Bids that did not match their published total are left out.

Every contract let that day: SCDOT letting of January 14, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy