Hudson Construction Company: TDOT bid record
Hudson Construction Company submitted 14 bids on Tennessee DOT contracts in the data, from 09 FEB 2018 to 23 SEP 2022, and was the low bidder on 13 of them (93%).
- Owner
- Tennessee DOT
- Low bid volume
- $8,122,937
- Latest bid
- 23 SEP 2022
- Data through
- 02 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2018 | 11 | 10 | 91% |
| 2020 | 1 | 1 | 100% |
| 2022 | 2 | 2 | 100% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| Mcminn | 1 | 1 | 100% |
| Cheatham | 1 | 1 | 100% |
| Robertson | 1 | 1 | 100% |
| Bledsoe | 1 | 1 | 100% |
| Bledsoe And Van Buren | 1 | 0 | 0% |
| Cumberland | 1 | 1 | 100% |
| Cumberland And Rhea | 1 | 1 | 100% |
| Dekalb | 1 | 1 | 100% |
| Grundy | 1 | 1 | 100% |
| Loudon And Monroe | 1 | 1 | 100% |
| Putnam | 1 | 1 | 100% |
| Scott | 1 | 1 | 100% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Signs (construction) | 712-06 | SF | 5 | 5 (100%) | $6.00 | $8.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Tinsley Asphalt, LLC | 4 | 1 of 4 |
| Rogers Group, Inc. | 2 | 0 of 2 |
| American Pavements, Inc. | 1 | 0 of 1 |
| Preston Brothers Construction | 1 | 0 of 1 |
| Trinity Builders, Inc. | 1 | 0 of 1 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 23 SEP 2022 | CNW310 | Cheatham | The sealing on i-40 from the williamson county line (l.m. 0.00) to the davidson county line (l.m. 7.15) | 1 of 2 | $244,601 | Low, 31% under the second |
| 23 SEP 2022 | CNW350 | Robertson | The sealing on i-65 from the sumner county line (l.m. 0.00) to the bridge over honey run creek (l.m. 7.47) | 1 of 2 | $236,690 | Low, 30% under the second |
| 26 JUN 2020 | CNU242 | Mcminn | The resurfacing (microsurfacing) on s.r. 310 from near u.s. 411 (s.r. 30) (l.m. 0.10) to s.r. 39 (l.m. 6.38), including bridge repair | 1 of 2 | $754,442 | Low, 14% under the second |
| 23 MAR 2018 | CNS164 | Cannon | The construction of a t.d.o.t. maintenance building on old mcminnville road in woodbury | 1 of 3 | $278,719 | Low, 47% under the second |
| 23 MAR 2018 | CNS098 | Fentress | 297(12),25007-3207-94,hsip-52(85),25003-3228-94 the resurfacing (microsurfacing) on s.r. 52, s.r. 154 and s.r. 297 | 1 of 1 | $2,031,508 | Low |
| 09 FEB 2018 | CNS016 | Bledsoe | The resurfacing (microsurface or thin mix overlay) on s.r. 30 from the van buren county line (l.m. 0.00) to east of bob sapp road (l.m. 5.58 | 1 of 3 | $324,862 | Low, 12% under the second |
| 09 FEB 2018 | CNS017 | Bledsoe And Van Buren | 94,88028-8205-14,stp/hsip-284(14),04030-3209-94,04030-8209-14 the resurfacing (either microsurface or thin mix overlay) on s.r. 284 from eas | 2 of 3 | $1,047,902 | +15% |
| 09 FEB 2018 | CNS018 | Cumberland | The resurfacing (microsurfacing) on u.s. 127 (s.r. 28) from plateau road to the bridge over clear creek and on s.r. 298 from north of redmon | 1 of 1 | $770,256 | Low |
| 09 FEB 2018 | CNS019 | Cumberland And Rhea | The resurfacing (microsurfacing) on s.r. 68 from west of wiley ford road in cumberland county to north of possum trot road in rhea county | 1 of 1 | $591,842 | Low |
| 09 FEB 2018 | CNS024 | Dekalb | The resurfacing (microsurfacing) on s.r. 83 from s.r. 146 (l.m. 0.00) to s.r. 56 (l.m. 7.83) | 1 of 1 | $408,308 | Low |
| 09 FEB 2018 | CNS079 | Grundy | The resurfacing (microsurfacing) on s.r. 56 from north of collins river bridge (l.m. 28.96) to the warren county line (l.m. 33.88) | 1 of 1 | $280,038 | Low |
| 09 FEB 2018 | CNS065 | Loudon And Monroe | Hsip-323(22),53080-3205-94 the resurfacing (microsurfacing) on s.r. 323 in loudon county and s.r. 39 and s.r. 322 in monroe county | 1 of 1 | $1,027,396 | Low |
| 09 FEB 2018 | CNS022 | Putnam | The resurfacing (microsurfacing) on u.s. 70n (s.r. 24) from the smith county line (l.m. 0.00) to east of byers road (l.m. 11.00) | 1 of 1 | $526,498 | Low |
| 09 FEB 2018 | CNS064 | Scott | The resurfacing (microsurfacing) on u.s. 27 (s.r. 29) from near sand cut road (l.m. 20.90) to the tennessee/kentucky state line (l.m. 27.00) | 1 of 1 | $647,779 | Low |
How this record was read
TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.
- Every bid counted here matched its published total to within one dollar; TDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.