TxDOT contract A00041603 bid tabulation
State Park Improvements, Various (WITHIN BLACK GAP WMA to .). Let by Texas DOT on May 1, 2025, Brewster, El Paso District. 4 bids received; low bid $894,200 by Digg Commercial, LLC, -19% against the engineer's estimate of $1,109,483.
- Owner
- Texas DOT
- Letting
- 01 MAY 2025
- Pay items
- 22
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Digg Commercial, LLC | $894,200 | Low | -19% |
| 2 | Relmco, Inc. | $966,053 | +8.0% | -13% |
| 3 | STX Civil | $1,422,870 | +59% | +28% |
| 4 | Dan Williams Company | $1,673,502 | +87% | +51% |
Engineer's estimate: $1,109,483.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Digg Commercial, LLC | 2. Relmco, Inc. | 3. STX Civil | 4. Dan Williams Company |
|---|---|---|---|---|---|---|---|---|
| 1 | Excavation (channel) (110-7002) | CY | 102 | $25.00 | $100.00 | $400.00 | $50.00 | $130.00 |
| 2 | Excavation (special) (110-7003) | CY | 24,047 | $15.00 | $17.50 | $1.65 | $30.00 | $31.75 |
| 3 | Embankment (final)(OC)(type D) (132-7011) | CY | 70 | $25.00 | $100.00 | $400.00 | $220.00 | $85.00 |
| 4 | Road grader work (ord comp) (152-7001) | STA | 5.50 | $6,000.00 | $500.00 | $3,500.00 | $500.00 | $7,500.00 |
| 5 | Struct excavation (pipe) (400-7003) | CY | 216 | $34.00 | $50.00 | $400.00 | $30.00 | $1.00 |
| 6 | Riprap (concrete)(5 in) (432-7002) | CY | 17 | $950.00 | $1,000.00 | $3,500.00 | $1,000.00 | $2,450.00 |
| 7 | Riprap (concrete)(6 in) (432-7003) | CY | 5 | $1,200.00 | $2,000.00 | $3,500.00 | $1,300.00 | $2,450.00 |
| 8 | Riprap (stone protection)(24 in) (432-7045) | CY | 307 | $450.00 | $300.00 | $350.00 | $350.00 | $350.00 |
| 9 | CMP (gal steel 24 in) (460-7005) | LF | 56 | $156.00 | $130.00 | $575.00 | $200.00 | $200.00 |
| 10 | CMP (gal steel 30 in) (460-7007) | LF | 214 | $455.00 | $150.00 | $575.00 | $215.00 | $200.00 |
| 11 | CMP (gal steel 36 in) (460-7009) | LF | 84 | $572.00 | $200.00 | $575.00 | $230.00 | $200.00 |
| 12 | CMP (gal steel 48 in) (460-7011) | LF | 54 | $286.00 | $240.00 | $575.00 | $380.00 | $300.00 |
| 13 | Removing structure (headwall) (496-7006) | EACH | 12 | $5,412.00 | $1,851.00 | $1,500.00 | $1,000.00 | $1,500.00 |
| 14 | Removing structure (pipe) (496-7007) | LF | 170 | $63.00 | $29.00 | $30.00 | $50.00 | $65.00 |
| 15 | Mobilization (500-7001) | LS | 1 | $99,226 | $100,000 | $85,000 | $130,000 | $155,000 |
| 16 | Barricades, signs and traffic handling (502-7001) | MO | 7 | $2,500.00 | $5,000.00 | $5,500.00 | $2,500.00 | $35,000 |
| 17 | Rock filter dams (install) (type 3) (506-7003) | LF | 187 | $93.00 | $91.00 | $80.00 | $220.00 | $195.00 |
| 18 | Rock filter dams (remove) (506-7011) | LF | 187 | $22.00 | $14.00 | $40.00 | $50.00 | $45.00 |
| 19 | Temporary sediment control fence (install) (506-7039) | LF | 580 | $5.10 | $25.00 | $25.00 | $6.00 | $5.00 |
| 20 | Temporary sediment control fence (remove) (506-7041) | LF | 580 | $2.85 | $2.00 | $12.00 | $2.00 | $2.80 |
| 21 | Install object marker assembly (OM-2Y)(WC)GND(BI) (658-7057) | EACH | 24 | $125.00 | $100.00 | $250.00 | $100.00 | $105.00 |
| 22 | Headwall (stone masonry) (5044-7001) | SF | 1,091 | $140.00 | $50.00 | $125.00 | $200.00 | $110.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of May 1, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.