TxDOT contract A00141245 bid tabulation

Surfacing/Roadway Restoration, FM 646 (FM 517 to FM 646). Let by Texas DOT on January 7, 2025, Galveston, Houston District. 3 bids received; low bid $7,395,778 by Durwood Greene Construction Co., -30% against the engineer's estimate of $10,505,594.

Owner
Texas DOT
Letting
07 JAN 2025
Pay items
94
Data through
19 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Durwood Greene Construction Co.$7,395,778Low-30%
2Texas Materials Group, Inc.$7,512,129+2.0%-28%
3Ragle Construction, Inc.$11,540,592+56%+10%
TxDOT contract A00141245: bids by rank

Engineer's estimate: $10,505,594.

Bid tabulation

LinePay itemUnitQuantityEstimate1. Durwood Greene Construction Co.2. Texas Materials Group, Inc.3. Ragle Construction, Inc.
1Remove (7"-11") TRT/untrt base & asphalt pavement (105-7007)SY8,743$15.00$25.00$25.00$19.00
2Backfill (type A or B) (134-7004)STA204$570.00$200.00$225.00$2,500.00
3D-GR HMA type D PG70-22 (level-UP) (341-7051)TON6,093$200.00$145.00$155.00$250.00
4D-GR HMA type D sac-A PG76-22 (341-7057)TON6,018$175.00$160.00$220.00$250.00
5Tack coat (341-7082)GAL4,320.47$6.50$3.50$4.00$6.00
6Flexible pavement structure repair(16") (351-7015)SY12,811$250.00$92.00$100.00$126.00
7Planing asphalt concrete pavement(3") (354-7052)SY72,008$6.00$2.75$6.50$5.00
8Concrete pavement(transition slab) (13") (360-7036)SY603$150.00$175.00$175.00$208.00
9Concrete pavement (CRCP)(hes) (13") (360-7052)SY8,140$150.00$180.00$137.50$198.00
10Drilled shaft (36 in) (416-7006)LF133$300.00$400.00$365.00$340.00
11Drilled shaft (48 in) (416-7008)LF22$467.13$600.00$600.00$560.00
12Mobilization (500-7001)LS1$639,600$500,000$325,000$1,100,000
13Barricades, signs and traffic handling (502-7001)MO11$11,400$8,000.00$1,600.00$100,000
14Portable changeable message sign (503-7001)DAY330$189.00$200.00$43.00$106.00
15TMA (stationary) (505-7001)DAY155$511.00$250.00$355.00$343.00
16TMA (mobile operation) (505-7003)DAY10$390.00$250.00$700.00$678.00
17Biodegradable erosion control logs (install) (12") (506-7044)LF33,010$9.00$3.25$4.40$4.00
18Biodegradable erosion control logs (remove) (506-7046)LF33,010$2.00$0.50$0.40$1.00
19Concrete curb (slotted) (529-7013)LF860$37.50$20.00$25.00$15.00
20Intersections (ACP) (530-7002)SY4,163$69.00$60.00$50.00$65.00
21Driveways (ACP) (530-7010)SY4,778$82.50$60.00$60.50$86.00
22Mailbox install-M (TWG-post) type 1 (560-7001)EACH58$600.00$640.00$650.00$600.00
23Mailbox install-S (TWG-post) type 2 (560-7002)EACH128$368.00$320.00$415.00$350.00
24Mailbox install-D (TWG-post) type 2 (560-7003)EACH6$390.00$340.00$600.00$335.00
25Conduit (PVC) (schedule 80) (2") (618-7054)LF370$9.50$14.00$13.00$12.00
26Conduit (PVC) (schedule 80) (2") (bore) (618-7055)LF285$16.72$18.00$17.00$16.00
27Conduit (PVC) (schedule 80) (3") (618-7060)LF115$25.00$30.00$30.00$28.00
28Conduit (PVC) (schedule 80) (3") (bore) (618-7061)LF155$38.41$40.00$37.00$35.00
29Conduit (PVC) (schedule 80) (4") (618-7064)LF45$36.68$65.00$65.00$60.00
30Electrical conductor (no.8) bare (620-7007)LF930$1.68$3.50$3.00$3.20
31Electrical conductor (no.4) insulated (620-7012)LF295$2.50$5.50$5.00$5.00
32Tray cable (4 conductor) (12 AWG) (621-7006)LF1,415$2.80$4.00$4.00$3.80
33Ground box type D (162922)W/apron (624-7008)EACH11$1,260.00$1,100.00$1,100.00$1,005.00
34Elc SRV type D 120/240 060(NS)SS(E)SP(O) (628-7148)EACH3$6,937.56$10,500$10,500$9,800.00
35Aluminum signs (type A) (636-7001)SF1,469$42.00$25.00$26.00$29.00
36Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001)EACH110$780.00$625.00$515.00$700.00
37Install small roadside sign support and assembly type 10BWG(1)SA(T) (644-7004)EACH3$930.00$750.00$555.00$700.00
38Remove SM RD SN sup&AM (644-7073)EACH112$164.00$90.00$160.00$125.00
39Work zone pavement marking non-removing (W)6"(solid) (662-7008)LF80,202$1.75$0.28$0.30$0.26
40Work zone pavement marking non-removing (W)8"(solid) (662-7012)LF1,568$1.25$0.55$0.50$0.44
41Work zone pavement marking non-removing (W)24"(solid) (662-7017)LF370$5.50$2.50$2.00$1.98
42Work zone pavement marking non-removing (W)(arrow) (662-7018)EACH20$146.00$120.00$120.00$115.00
43Work zone pavement marking non-removing (W)(double arrow) (662-7019)EACH2$250.00$145.00$145.00$135.00
44Work zone pavement marking non-removing(W)(word) (662-7030)EACH12$213.00$120.00$120.00$110.00
45Work zone pavement marking non-removing (Y)6"(broken) (662-7036)LF7,820$1.25$0.34$0.35$0.32
46Work zone pavement marking non-removing (Y)6"(solid) (662-7038)LF27,994$1.25$0.28$0.30$0.26
47Work zone pavement marking removing (reflectorized) type I-C (662-7049)EACH82$3.25$5.50$5.50$4.98
48Work zone pavement marking removing (reflectorized) type II-A-A (662-7051)EACH1,804$3.50$5.50$5.50$4.98
49Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024)LF734$1.50$1.40$1.50$1.35
50Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036)LF56$6.00$10.00$7.50$6.98
51Reflectorized pavement marking type I (W)(arrow)(100MIL) (666-7042)EACH9$265.00$245.00$250.00$235.00
52Reflectorized pavement marking type I (W)(word)(100MIL) (666-7066)EACH5$460.00$245.00$250.00$235.00
53Reflectorized pavement marking type III (W)(6")(solid) (666-7236)LF3,468$1.90$1.30$1.50$1.25
54Reflectorized pavement marking type III (W)(24")(solid) (666-7244)LF129$12.50$7.50$8.00$7.25
55Reflectorized pavement marking type III (Y)(6")(solid) (666-7248)LF1,727$1.90$1.30$1.50$1.25
56Reflectorized pavement marking type III (Y)(6")(broken) (666-7249)LF260$4.00$1.30$1.50$1.25
57Reflectorized pavement marking type III (Y)(8")(solid) (666-7251)LF100$3.10$2.30$2.50$2.25
58Reflectorized pavement marking type III (W)(arrow) (666-7254)EACH1$293.00$350.00$360.00$335.00
59Reflectorized pavement marking type III (W)(double arrow) (666-7255)EACH1$500.00$400.00$400.00$380.00
60Reflectorized pavement marking type III (W)(word) (666-7257)EACH1$508.00$350.00$350.00$335.00
61Reflectorized profile pavement marking type I(W)6"(solid)(100MIL) (666-7266)LF36,633$1.10$0.82$0.85$0.77
62Reflectorized profile pavement marking type I(Y)6"(solid)(100MIL) (666-7270)LF11,670$1.10$0.82$0.85$0.77
63Reflectorized profile pavement marking type I(Y)6"(broken)(100MIL) (666-7274)LF3,510$1.50$0.82$0.85$0.77
64Type I high perf PM (Y)6"(broken)(100MIL) (666-7302)LF140$2.50$1.40$1.50$1.35
65Type I high perf PM (Y)6"(solid)(100MIL) (666-7305)LF600$2.50$1.40$1.50$1.35
66Pavement sler 6" (666-7347)LF5,455$0.17$0.20$0.25$0.18
67Pavement sler 8" (666-7348)LF50$0.23$0.30$0.30$0.28
68Pavement sler 24" (666-7352)LF129$0.80$1.30$1.50$1.25
69Pavement sler (arrow) (666-7353)EACH1$20.50$105.00$100.00$100.00
70Pavement sler (word) (666-7354)EACH1$25.00$105.00$100.00$100.00
71Pavement sler (double arrow) (666-7356)EACH1$27.40$120.00$100.00$115.00
72Reflectorized pavement marker type I-C (672-7002)EACH41$6.75$7.35$8.00$7.25
73Reflectorized pavement marker type II-A-A (672-7004)EACH902$7.50$7.30$8.00$7.15
74Eliminating existing PM & markers (6") (677-7002)LF530$0.50$0.58$0.50$0.55
75Pavement surface preparation for marking (6") (678-7002)LF4,925$0.08$0.22$0.25$0.20
76Pavement surface preparation for marking (8") (678-7004)LF50$1.00$0.42$0.50$0.40
77Pavement surface preparation for marking (24") (678-7008)LF129$2.00$1.20$1.00$1.10
78Pavement surface preparation for marking (arrow) (678-7009)EACH1$12.00$55.00$50.00$50.00
79Pavement surface preparation for marking (double arrow) (678-7010)EACH1$14.25$70.00$70.00$65.00
80Pavement surface preparation for marking (word) (678-7016)EACH1$13.50$70.00$70.00$65.00
81Pavement surface preparation for marking (RPM) (678-7033)EACH72$0.85$1.25$1.50$1.20
82Install highway traffic signal (flash beacon) (680-7001)EACH3$7,687.50$35,000$35,000$32,700
83Vehicle signal section (12")LED(yel) (682-7003)EACH4$255.00$350.00$325.00$300.00
84Vehicle signal section (12")LED(red) (682-7005)EACH20$255.00$350.00$325.00$300.00
85Backplate W/reflectorized border (1SEC) (682-7048)EACH24$161.50$250.00$250.00$220.00
86Traffic signal CBL (type A)(12 AWG)(7 conductor) (684-7012)LF2,345$3.00$3.40$3.50$3.00
87Ins traffic signal PL AM (S)1 arm(28') (686-7029)EACH2$11,480$12,300$12,000$11,300
88Ins traffic signal PL AM(S)1 arm(28')lum (686-7031)EACH3$11,990$13,700$14,000$12,680
89Ins traffic signal PL AM(S)1 arm(32')lum (686-7035)EACH4$17,649$14,400$14,500$13,200
90Ins traffic signal PL AM(S)1 arm(36')lum (686-7039)EACH1$14,130$14,700$14,500$13,500
91Ins traffic signal PL AM(S)2 arm(50-28')lum (686-7179)EACH1$46,378$38,500$38,000$35,300
92Storm sewer clean (box culvert) (>96 SF) (764-7020)LF65$25.00$125.00$80.00$1,500.00
93Underseal course (3006-7001)GAL15,847.71$7.25$9.85$5.50$5.50
94Bbu system (external battery cabinet) (6007-7001)EACH3$8,000.00$9,300.00$9,000.00$8,400.00
TxDOT contract A00141245: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

Every contract let that day: TxDOT letting of January 7, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy