TxDOT contract A00183321 bid tabulation
Bicycle And Pedestrian Improvements, DELANY RD (SH 6 from 2nd St to east of 6th St to Delany from SH 6 to north of Palmetto). Let by Texas DOT on December 2, 2025, Galveston, Houston District. 4 bids received; low bid $2,641,747 by Scout 5 Construction LLC, -19% against the engineer's estimate of $3,275,240.
- Owner
- Texas DOT
- Letting
- 02 DEC 2025
- Pay items
- 108
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Scout 5 Construction LLC | $2,641,747 | Low | -19% |
| 2 | Environmental Allies, Inc. | $2,827,418 | +7.0% | -14% |
| 3 | MC2 Civil, LLC | $2,991,126 | +13% | -9.0% |
| 4 | Roman Emperors Road, LLC | $3,594,518 | +36% | +10% |
Engineer's estimate: $3,275,240.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Scout 5 Construction LLC | 2. Environmental Allies, Inc. | 3. MC2 Civil, LLC | 4. Roman Emperors Road, LLC |
|---|---|---|---|---|---|---|---|---|
| 1 | Preparing row (100-7002) | STA | 44 | $4,300.00 | $4,700.00 | $3,750.00 | $6,000.00 | $5,200.00 |
| 2 | Preparation row (tree remove) (12"-24" diameter) (100-7004) | EACH | 6 | $600.00 | $900.00 | $2,000.00 | $2,500.00 | $1,000.00 |
| 3 | Removing concrete (riprap) (104-7006) | SY | 4 | $25.00 | $18.00 | $150.00 | $600.00 | $100.00 |
| 4 | Remove (24") TRT/untrt base & asphalt pavement (105-7044) | SY | 398 | $10.00 | $17.20 | $28.00 | $20.00 | $20.00 |
| 5 | Remove (2"-8") TRT/untrt base & asphalt pavement (105-7053) | SY | 1,836 | $3.50 | $7.45 | $9.00 | $15.00 | $20.00 |
| 6 | Excavation (roadway) (110-7001) | CY | 397 | $10.00 | $14.00 | $30.00 | $40.00 | $30.00 |
| 7 | Embankment (final)(OC)(type A) (132-7001) | CY | 629 | $25.00 | $32.50 | $40.00 | $30.00 | $30.00 |
| 8 | Block sodding (162-7002) | SY | 6,819 | $8.00 | $5.00 | $6.00 | $5.00 | $5.00 |
| 9 | Fertilizer (166-7001) | ACRE | 1.39 | $1,400.00 | $728.20 | $1,000.00 | $600.00 | $1,200.00 |
| 10 | Vegetative watering (168-7001) | TGL | 153 | $40.00 | $86.35 | $30.00 | $68.00 | $80.00 |
| 11 | Cem TRT(PLNT MX)(CL N)(type E)(GR 4)(6") (276-7343) | SY | 2,090 | $20.70 | $10.00 | $37.00 | $70.00 | $40.00 |
| 12 | Flexible pavement structure repair(22") (351-7021) | SY | 300 | $120.00 | $150.00 | $280.00 | $225.00 | $220.00 |
| 13 | Plane concrete pavement(0" to 2") (354-7066) | SY | 50 | $8.00 | $237.00 | $25.00 | $150.00 | $100.00 |
| 14 | Struct excavation (400-7001) | CY | 199 | $30.00 | $28.00 | $24.00 | $50.00 | $32.00 |
| 15 | Struct excavation (box) (400-7002) | CY | 1,109 | $50.00 | $5.00 | $22.00 | $30.00 | $32.00 |
| 16 | Struct excavation (pipe) (400-7003) | CY | 820 | $35.00 | $6.00 | $20.00 | $30.00 | $32.00 |
| 17 | Cem stabil BKFL (400-7010) | CY | 1,448 | $200.00 | $176.80 | $65.00 | $60.00 | $170.00 |
| 18 | Cement stab backfill (inlet or MH) (400-7011) | CY | 155 | $57.00 | $176.80 | $65.00 | $60.00 | $140.00 |
| 19 | Trench excavation protection (402-7001) | LF | 2,396 | $8.00 | $6.00 | $1.00 | $1.00 | $10.00 |
| 20 | Drilled shaft (traffic signal pole) (36 in) (416-7044) | LF | 106 | $433.00 | $507.00 | $600.00 | $340.00 | $420.00 |
| 21 | Concrete box culvert (3 FT X 2 FT) (462-7001) | LF | 1,137 | $400.00 | $547.30 | $410.00 | $330.00 | $490.00 |
| 22 | RC pipe (CL III)(18 in) (464-7003) | LF | 156 | $120.00 | $93.60 | $125.00 | $140.00 | $120.00 |
| 23 | RC pipe (CL III)(24 in) (464-7005) | LF | 1,115 | $150.00 | $118.30 | $140.00 | $185.00 | $200.00 |
| 24 | Junction box(complete)(PJB)(5FTX5FT) (465-7009) | EACH | 1 | $10,000 | $4,998.50 | $7,500.00 | $8,000.00 | $10,000 |
| 25 | Inlet (complete)(pazd)(SL)(5FTX5FT) (465-7151) | EACH | 3 | $10,000 | $5,180.50 | $9,000.00 | $10,000 | $8,000.00 |
| 26 | Inlet (complete)(type A)(hou) (465-7313) | EACH | 16 | $7,500.00 | $3,848.00 | $6,000.00 | $6,000.00 | $6,000.00 |
| 27 | Inlet (complete)(type aad)(hou) (465-7315) | EACH | 1 | $5,500.00 | $8,365.50 | $8,000.00 | $11,000 | $9,000.00 |
| 28 | Inlet (complete)(type A)(mod) (465-7396) | EACH | 3 | $8,500.00 | $4,147.00 | $7,500.00 | $9,000.00 | $7,000.00 |
| 29 | Inlet (complete)(type aad)(mod) (465-7397) | EACH | 1 | $8,900.00 | $8,365.50 | $8,000.00 | $12,000 | $11,000 |
| 30 | Inlet (complete)(type AZ)(mod) (465-7398) | EACH | 1 | $6,200.00 | $4,738.50 | $13,000 | $7,000.00 | $6,000.00 |
| 31 | Set (type II) (24 in) (RCP) (6: 1) (P) (467-7328) | EACH | 6 | $2,500.00 | $2,657.20 | $2,750.00 | $5,000.00 | $3,000.00 |
| 32 | Adjusting manholes (479-7001) | EACH | 1 | $900.00 | $2,200.00 | $400.00 | $2,000.00 | $2,000.00 |
| 33 | Pipe (PVC) (schedule 40) (6 in) (481-7013) | LF | 98 | $85.00 | $4.32 | $75.00 | $50.00 | $120.00 |
| 34 | Removing structure (inlet) (496-7002) | EACH | 27 | $1,000.00 | $1,200.00 | $900.00 | $900.00 | $1,000.00 |
| 35 | Removing structure (headwall) (496-7006) | EACH | 1 | $1,185.00 | $1,700.00 | $2,500.00 | $1,500.00 | $2,000.00 |
| 36 | Removing structure (pipe) (496-7007) | LF | 2,156 | $55.00 | $20.00 | $30.00 | $20.00 | $30.00 |
| 37 | Mobilization (500-7001) | LS | 1 | $298,000 | $75,000 | $100,000 | $290,000 | $280,000 |
| 38 | Barricades, signs and traffic handling (502-7001) | MO | 7 | $10,000 | $5,390.92 | $11,500 | $7,000.00 | $8,000.00 |
| 39 | Portable changeable message sign (503-7002) | EACH | 3 | $9,000.00 | $15,080 | $13,000 | $10,000 | $12,000 |
| 40 | TMA (stationary) (505-7001) | DAY | 150 | $200.00 | $0.01 | $250.00 | $150.00 | $250.00 |
| 41 | Rock filter dams (install) (type 1) (506-7001) | LF | 47 | $50.00 | $85.72 | $45.00 | $45.00 | $80.00 |
| 42 | Rock filter dams (remove) (506-7011) | LF | 47 | $20.00 | $28.24 | $15.00 | $25.00 | $30.00 |
| 43 | Temporary sediment control fence (install) (506-7039) | LF | 2,172 | $4.50 | $5.19 | $3.50 | $7.00 | $5.00 |
| 44 | Temporary sediment control fence (remove) (506-7041) | LF | 2,172 | $1.00 | $1.55 | $1.50 | $1.00 | $2.00 |
| 45 | Biodegradable erosion control logs (install) (8") (506-7043) | LF | 1,242 | $2.00 | $10.75 | $8.00 | $6.00 | $10.00 |
| 46 | Biodegradable erosion control logs (remove) (506-7046) | LF | 1,242 | $1.50 | $1.94 | $3.00 | $2.00 | $2.00 |
| 47 | Portable concrete traffic barrier (furnish and install)(low prof)(type 1) (512-7009) | LF | 20 | $29.00 | $82.58 | $95.00 | $150.00 | $250.00 |
| 48 | Portable concrete traffic barrier (furnish and install)(low prof)(type 2) (512-7010) | LF | 40 | $32.00 | $82.58 | $90.00 | $100.00 | $200.00 |
| 49 | Portable concrete traffic barrier (move)(low prof)(type 1) (512-7033) | LF | 60 | $12.00 | $12.00 | $20.00 | $35.00 | $50.00 |
| 50 | Portable concrete traffic barrier (move)(low prof)(type 2) (512-7034) | LF | 120 | $13.00 | $12.00 | $20.00 | $18.00 | $50.00 |
| 51 | Portable concrete traffic barrier (remove)(low prof)(type 1) (512-7057) | LF | 20 | $12.50 | $10.00 | $30.00 | $85.00 | $100.00 |
| 52 | Portable concrete traffic barrier (remove)(low prof)(type 2) (512-7058) | LF | 40 | $13.00 | $18.00 | $30.00 | $62.00 | $100.00 |
| 53 | Driveways (ACP) (530-7010) | SY | 1,538 | $55.00 | $60.00 | $65.00 | $70.00 | $120.00 |
| 54 | Concrete sidewalks (5") (531-7002) | SY | 1,499 | $110.00 | $30.25 | $82.00 | $88.00 | $120.00 |
| 55 | Concrete sidewalks (6") (531-7003) | SY | 1,742 | $120.00 | $36.06 | $115.00 | $76.00 | $130.00 |
| 56 | Curb ramps (type 1) (531-7005) | EACH | 8 | $3,200.00 | $2,500.00 | $2,000.00 | $2,500.00 | $2,000.00 |
| 57 | Curb ramps (type 5) (mod) (531-7031) | EACH | 1 | $5,100.00 | $3,000.00 | $5,500.00 | $2,650.00 | $5,000.00 |
| 58 | Chain link fence (install) (6') (550-7001) | LF | 359 | $20.00 | $31.62 | $50.00 | $35.00 | $50.00 |
| 59 | Chain link fence (remove) (550-7007) | LF | 337 | $3.00 | $7.00 | $10.00 | $5.00 | $15.00 |
| 60 | Gate (install)(6'X10') (550-7014) | EACH | 3 | $50.00 | $404.57 | $2,200.00 | $1,250.00 | $2,000.00 |
| 61 | Gate (remove) (550-7016) | EACH | 2 | $300.00 | $1,425.00 | $315.00 | $250.00 | $800.00 |
| 62 | Conduit (PVC) (schedule 80) (2") (618-7054) | LF | 190 | $14.50 | $20.00 | $18.00 | $16.00 | $20.00 |
| 63 | Conduit (PVC) (schedule 80) (2") (bore) (618-7055) | LF | 270 | $18.50 | $21.00 | $24.00 | $16.00 | $30.00 |
| 64 | Conduit (PVC) (schedule 80) (3") (618-7060) | LF | 245 | $16.00 | $40.00 | $30.00 | $23.00 | $30.00 |
| 65 | Conduit (PVC) (schedule 80) (4") (618-7064) | LF | 60 | $33.00 | $65.00 | $27.00 | $26.00 | $50.00 |
| 66 | Conduit (PVC) (schedule 80) (4") (bore) (618-7065) | LF | 355 | $36.00 | $44.20 | $34.00 | $26.00 | $50.00 |
| 67 | Electrical conductor (no.8) bare (620-7007) | LF | 1,185 | $2.00 | $4.00 | $2.00 | $2.00 | $4.00 |
| 68 | Electrical conductor (no.4) insulated (620-7012) | LF | 585 | $4.00 | $5.50 | $3.50 | $4.00 | $4.00 |
| 69 | Tray cable (4 conductor) (12 AWG) (621-7006) | LF | 555 | $3.50 | $5.50 | $4.00 | $4.00 | $4.00 |
| 70 | Ground box type D (162922)W/apron (624-7008) | EACH | 9 | $1,400.00 | $1,430.00 | $1,500.00 | $1,450.00 | $1,500.00 |
| 71 | Elc SRV type D 120/240 060(NS)SS(E)SP(O) (628-7148) | EACH | 2 | $8,650.00 | $11,570 | $8,500.00 | $6,800.00 | $10,000 |
| 72 | Install small roadside sign support and assembly type 10BWG(1)SA(T) (644-7004) | EACH | 4 | $800.00 | $1,079.00 | $950.00 | $800.00 | $850.00 |
| 73 | Remove SM RD SN sup&AM (644-7073) | EACH | 4 | $115.00 | $136.50 | $150.00 | $155.00 | $120.00 |
| 74 | Reflectorized pavement marking type I (W)6"(lane drop)(100MIL) (666-7012) | LF | 42 | $1.60 | $3.90 | $4.00 | $5.00 | $3.00 |
| 75 | Reflectorized pavement marking type I (W)8"(broken)(100MIL) (666-7015) | LF | 9 | $1.05 | $5.20 | $5.00 | $10.00 | $5.00 |
| 76 | Reflectorized pavement marking type I (W)12"(solid)(100MIL) (666-7030) | LF | 95 | $3.50 | $7.80 | $7.00 | $12.50 | $8.00 |
| 77 | Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036) | LF | 150 | $8.00 | $16.90 | $14.00 | $25.00 | $13.00 |
| 78 | Reflectorized pavement marking type I (Y)8"(solid)(100MIL) (666-7114) | LF | 9 | $1.75 | $19.50 | $16.00 | $10.00 | $15.00 |
| 79 | Pavement surface preparation for marking (6") (678-7002) | LF | 42 | $0.10 | $1.30 | $2.00 | $1.00 | $4.00 |
| 80 | Pavement surface preparation for marking (8") (678-7004) | LF | 18 | $0.20 | $1.30 | $2.00 | $2.00 | $4.00 |
| 81 | Pavement surface preparation for marking (12") (678-7006) | LF | 95 | $0.50 | $2.60 | $3.00 | $4.00 | $4.00 |
| 82 | Pavement surface preparation for marking (24") (678-7008) | LF | 150 | $0.45 | $3.90 | $4.00 | $8.00 | $5.00 |
| 83 | Install highway traffic signal (system) (680-7003) | EACH | 2 | $45,000 | $49,400 | $38,000 | $36,000 | $42,000 |
| 84 | Removing traffic signals (680-7004) | EACH | 2 | $10,000 | $4,680.00 | $5,150.00 | $5,500.00 | $5,000.00 |
| 85 | Vehicle signal section (12")LED(green) (682-7001) | EACH | 16 | $305.00 | $390.00 | $275.00 | $300.00 | $300.00 |
| 86 | Vehicle signal section (12")LED(green arrow) (682-7002) | EACH | 2 | $305.00 | $390.00 | $275.00 | $300.00 | $300.00 |
| 87 | Vehicle signal section (12")LED(yel) (682-7003) | EACH | 16 | $305.00 | $390.00 | $275.00 | $300.00 | $300.00 |
| 88 | Vehicle signal section (12")LED(yel arrow) (682-7004) | EACH | 2 | $305.00 | $390.00 | $275.00 | $300.00 | $300.00 |
| 89 | Vehicle signal section (12")LED(red) (682-7005) | EACH | 16 | $305.00 | $390.00 | $275.00 | $300.00 | $300.00 |
| 90 | Vehicle signal section (12")LED(red arrow) (682-7006) | EACH | 4 | $305.00 | $390.00 | $275.00 | $300.00 | $300.00 |
| 91 | Pedestrian signal section (LED)(countdown) (682-7018) | EACH | 8 | $550.00 | $1,092.00 | $800.00 | $750.00 | $1,000.00 |
| 92 | Backplate W/reflectorized border(4 sec) (682-7037) | EACH | 2 | $220.00 | $338.00 | $265.00 | $300.00 | $300.00 |
| 93 | Backplate W/reflectorized border(3 sec) (682-7054) | EACH | 16 | $200.00 | $312.00 | $180.00 | $155.00 | $300.00 |
| 94 | Traffic signal CBL (type A)(12 AWG)(2 conductor) (684-7007) | LF | 975 | $2.20 | $3.12 | $2.50 | $3.00 | $4.00 |
| 95 | Traffic signal CBL (type A)(12 AWG)(4 conductor) (684-7009) | LF | 1,030 | $2.70 | $3.64 | $3.30 | $3.00 | $4.00 |
| 96 | Traffic signal CBL (type A)(12 AWG)(7 conductor) (684-7012) | LF | 1,810 | $3.20 | $4.16 | $4.30 | $5.00 | $4.00 |
| 97 | Ins traffic signal PL AM (S)1 arm(28') (686-7029) | EACH | 1 | $12,300 | $13,260 | $10,000 | $9,900.00 | $13,000 |
| 98 | Ins traffic signal PL AM(S)1 arm(36') (686-7037) | EACH | 2 | $14,500 | $15,080 | $12,500 | $11,400 | $13,000 |
| 99 | Ins traffic signal PL AM(S)1 arm(44')lum (686-7047) | EACH | 3 | $18,000 | $22,360 | $17,250 | $16,700 | $18,000 |
| 100 | Ins traffic signal PL AM(S)2 arm(40-24')lum (686-7135) | EACH | 1 | $33,000 | $30,420 | $24,000 | $21,000 | $25,000 |
| 101 | Pedestrian pole assembly (687-7001) | EACH | 4 | $3,000.00 | $3,705.00 | $5,500.00 | $3,800.00 | $3,000.00 |
| 102 | Pedestrian detect push button (APS) (688-7001) | EACH | 8 | $1,000.00 | $1,170.00 | $950.00 | $880.00 | $1,000.00 |
| 103 | Pedestrian detector controller unit (688-7003) | EACH | 2 | $3,500.00 | $4,160.00 | $3,750.00 | $3,800.00 | $3,500.00 |
| 104 | Remove and replace landscape fence (5071-7001) | LF | 59 | $110.00 | $100.00 | $33.00 | $150.00 | $80.00 |
| 105 | Bbu system (external battery cabinet) (6007-7001) | EACH | 2 | $10,000 | $11,570 | $11,250 | $8,400.00 | $9,000.00 |
| 106 | RVDS (presence detection only) (6008-7001) | EACH | 6 | $9,300.00 | $845.00 | $7,500.00 | $6,600.00 | $6,000.00 |
| 107 | RVDS (advance detection only) (6008-7002) | EACH | 4 | $9,300.00 | $884.00 | $7,750.00 | $6,600.00 | $6,000.00 |
| 108 | Ground box (adjust) (6013-7007) | EACH | 2 | $900.00 | $325.00 | $900.00 | $1,100.00 | $1,000.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of December 2, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.