TxDOT contract A00186954 bid tabulation

Rehabilitate Existing Roadway, SH 350 (HOWARD COUNTY to SCURRY COUNTY). Let by Texas DOT on June 5, 2025, Mitchell, Abilene District. 6 bids received; low bid $5,996,861 by RK Hall, LLC, -20% against the engineer's estimate of $7,472,607.

Owner
Texas DOT
Letting
05 JUN 2025
Pay items
45
Data through
19 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1RK Hall, LLC$5,996,861Low-20%
2CK Newberry, LLC$6,997,697+17%-6.0%
3A. L. Helmcamp, Inc.$7,209,800+20%-4.0%
4Zack Burkett Co.$7,277,032+21%-3.0%
5Reece Albert, Inc.$7,889,155+32%+6.0%
6Nobles Road Construction, Inc.$8,185,544+36%+10%
TxDOT contract A00186954: bids by rank

Engineer's estimate: $7,472,607.

Bid tabulation

LinePay itemUnitQuantityEstimate1. RK Hall, LLC2. CK Newberry, LLC3. A. L. Helmcamp, Inc.4. Zack Burkett Co.5. Reece Albert, Inc.6. Nobles Road Construction, Inc.
1Backfill (type B) (134-7002)STA345$200.00$176.98$250.00$200.00$150.00$408.05$300.00
2Blading (150-7001)STA345$250.00$68.08$80.00$115.00$50.00$37.44$222.00
3Cement (275-7001)TON2,887$300.00$271.70$265.00$250.00$329.40$312.17$325.00
4Cement TRT (existing material)(8") (275-7003)SY171,792$4.00$3.22$2.50$3.00$6.47$5.07$5.65
5Prime coat (MC-30) (310-7004)GAL34,359$5.00$5.45$5.00$6.00$4.56$5.22$6.10
6SP mixes SP-C sac-B PG70-22 (344-7021)TON28,154$140.00$115.75$145.00$150.00$128.00$153.18$147.50
7Tack coat (344-7077)GAL266$5.00$71.08$4.00$6.00$6.00$5.76$6.10
8Planing asphalt concrete pavement(0" to 2") (354-7032)SY2,251$7.00$9.61$4.00$1.50$3.00$12.08$7.70
9Planing asphalt concrete pavement(2") (354-7051)SY856$7.00$11.83$9.00$1.50$3.00$15.88$12.50
10Cleaning and sealing existing joints (CL3) (438-7004)LF368$70.00$44.10$40.00$40.00$42.70$35.00$63.50
11Retrofit rail (type T631) (451-7020)LF350$100.00$136.50$140.00$137.00$158.60$130.00$260.00
12Mobilization (500-7001)LS1$660,000$300,388$675,000$600,000$650,000$656,022$798,000
13Barricades, signs and traffic handling (502-7001)MO6$30,000$20,704$15,000$30,000$5,307.00$10,271$25,000
14Portable changeable message sign (503-7002)EACH2$12,000$13,412$10,000$20,000$7,500.00$12,182$16,500
15TMA (stationary) (505-7001)DAY23$400.00$247.43$350.00$400.00$305.00$459.87$550.00
16TMA (mobile operation) (505-7003)DAY36$600.00$343.05$750.00$750.00$0.01$829.82$550.00
17Rock filter dams (install) (type 2) (506-7002)LF160$50.00$57.09$65.00$57.75$50.00$84.93$66.00
18Rock filter dams (remove) (506-7011)LF160$15.00$37.80$20.00$15.75$10.00$26.77$22.00
19Temporary sediment control fence (install) (506-7039)LF2,660$10.00$6.42$6.00$6.30$6.10$5.36$6.60
20Temporary sediment control fence (remove) (506-7041)LF2,660$1.50$1.15$2.00$2.10$2.44$0.82$2.20
21Biodegradable erosion control logs (install) (12") (506-7044)LF960$8.00$6.62$7.00$8.40$12.20$9.00$8.80
22Biodegradable erosion control logs (remove) (506-7046)LF960$1.00$1.38$2.00$1.05$2.44$1.74$2.20
23One-way traffic control (port traffic signal) (510-7003)MO5$10,000$8,168.27$15,000$15,000$8,296.00$37,442$19,750
24Driveways (base) (530-7015)SY247$30.00$70.44$50.00$70.00$35.00$138.47$55.00
25Mill rumble strips (asphalt) (shoulder) (533-7001)LF68,456$0.20$0.21$0.30$0.15$0.32$0.14$0.28
26Mill rumble strips (asphalt) (centerline) (533-7002)LF34,043$0.25$0.25$0.30$0.15$0.29$0.14$0.28
27Metal W-beam guard fence (timber post) (540-7001)LF400$30.00$31.50$35.00$31.50$36.60$30.00$33.00
28Remove metal beam guard fence (542-7001)LF400$5.00$5.25$5.00$5.25$6.10$5.00$5.50
29Remove terminal anchor section (542-7002)EACH4$300.00$525.00$550.00$525.00$610.00$500.00$550.00
30Guardrail end treatment (install) (544-7001)EACH4$3,600.00$6,874.23$4,500.00$4,200.00$4,880.00$4,000.00$4,400.00
31Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001)EACH32$700.00$960.75$1,000.00$960.75$1,098.00$900.00$1,000.00
32Install small roadside sign support and assembly type 10BWG(1)SA(T) (644-7004)EACH12$1,000.00$997.50$1,000.00$997.50$1,220.00$1,000.00$1,100.00
33Install small roadside sign support and assembly type 10BWG(1)SA(U) (644-7007)EACH4$1,100.00$997.50$1,000.00$997.50$1,342.00$1,100.00$1,250.00
34Remove SM RD SN sup&AM (644-7073)EACH48$130.00$105.00$110.00$105.00$122.00$176.69$110.00
35Install delineator assembly (D-SW)SZ 1(BRF)GF2(BI) (658-7019)EACH10$45.00$52.50$50.00$52.50$61.00$50.00$55.00
36Work zone pavement marking removing (reflectorized) type II-A-A (662-7051)EACH2,238$8.00$4.46$5.00$5.71$5.19$4.50$7.70
37Work zone pavement marking removing (W)6"(solid) (662-7068)LF99,840$1.50$0.76$0.30$0.30$0.88$0.24$0.30
38Work zone pavement marking removing (Y)6"(solid) (662-7100)LF89,280$1.50$0.76$0.30$0.30$0.88$0.24$0.30
39Work zone pavement marking SHT terminal (tab)type Y-2 (662-7114)EACH1,911$0.20$3.72$1.00$0.46$1.25$3.06$3.30
40Reflectorized pavement marking type I (W)6"(solid)(100MIL) (666-7411)LF80,411$0.50$0.72$0.80$0.86$0.84$0.68$0.80
41Reflectorized pavement marking type I (Y)6"(broken)(100MIL) (666-7420)LF8,570$0.50$0.72$1.00$1.05$0.84$0.83$0.32
42Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423)LF34,533$0.50$0.72$1.00$1.00$0.84$0.79$0.95
43Prefabricated PM type C (W)(24")(solid) (668-7089)LF472$15.00$14.70$12.00$13.57$17.08$10.70$13.25
44Reflectorized pavement marker type II-A-A (672-7004)EACH861$4.50$4.46$7.00$8.24$5.19$6.50$8.90
45Eliminating existing PM & markers (4") (677-7001)LF93,085$1.00$0.68$1.00$0.82$0.79$0.65$1.10
TxDOT contract A00186954: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

Every contract let that day: TxDOT letting of June 5, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy