TxDOT contract A00193178 bid tabulation
Off System Signal System Upgrades, 25TH ST (At Clinton Ave to .). Let by Texas DOT on August 5, 2026, Tarrant, Fort Worth District. 5 bids received; low bid $498,027 by Yunex LLC, -12% against the engineer's estimate of $563,798.
- Owner
- Texas DOT
- Letting
- 05 AUG 2026
- Pay items
- 93
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Yunex LLC | $498,027 | Low | -12% |
| 2 | Elecnor Belco Electric, Inc. | $498,357 | 0.0% | -12% |
| 3 | Florida Traffic Control Devices, Inc. | $610,610 | +23% | +8.0% |
| 4 | Lumin8 Transportation Technologies, LLC | $628,857 | +26% | +12% |
| 5 | Durable Specialties, Inc. | $724,259 | +45% | +28% |
Engineer's estimate: $563,798.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Yunex LLC | 2. Elecnor Belco Electric, Inc. | 3. Florida Traffic Control Devices, Inc. | 4. Lumin8 Transportation Technologies, LLC | 5. Durable Specialties, Inc. |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Removing concrete (pavement) (104-7001) | SY | 38 | $25.00 | $88.89 | $20.00 | $91.50 | $92.00 | $110.00 |
| 2 | Removing concrete (sidewalk, ramp or shared use path) (104-7013) | SY | 80 | $25.00 | $83.34 | $7.90 | $86.00 | $18.00 | $100.00 |
| 3 | Removing concrete (curb) (104-7016) | LF | 148 | $25.00 | $33.34 | $3.00 | $35.00 | $29.00 | $40.00 |
| 4 | Removing concrete (sawcut) (104-7020) | LF | 293 | $30.00 | $13.34 | $9.00 | $14.00 | $5.00 | $16.00 |
| 5 | Furn & place topsoil (4") (160-7002) | SY | 69 | $10.00 | $30.70 | $22.00 | $11.50 | $84.00 | $3.00 |
| 6 | Block sodding (162-7002) | SY | 69 | $8.00 | $14.20 | $25.00 | $23.00 | $30.00 | $65.00 |
| 7 | Vegetative watering (168-7001) | TGL | 8 | $20.00 | $5.00 | $752.00 | $515.00 | $684.00 | $100.00 |
| 8 | FL BS (compacted in place)(type A GR 1-2) (8") (247-7067) | SY | 27 | $45.00 | $122.23 | $195.00 | $125.00 | $214.00 | $150.00 |
| 9 | Prime coat(MC-30 or AE-P) (310-7013) | GAL | 8 | $10.00 | $111.12 | $76.00 | $23.00 | $465.00 | $250.00 |
| 10 | Concrete pavement (CRCP) (8") (360-7002) | SY | 27 | $130.00 | $377.78 | $247.00 | $390.00 | $456.00 | $450.00 |
| 11 | Drilled shaft (traffic signal pole) (24 in) (416-7042) | LF | 20 | $280.00 | $294.73 | $343.00 | $640.00 | $236.00 | $650.00 |
| 12 | Drilled shaft (traffic signal pole) (30 in) (416-7043) | LF | 40 | $490.00 | $467.23 | $415.00 | $1,015.00 | $395.00 | $710.00 |
| 13 | Riprap (concrete)(4 in) (432-7001) | CY | 1 | $700.00 | $4,222.23 | $602.00 | $4,345.00 | $3,648.00 | $3,000.00 |
| 14 | Mobilization (500-7001) | LS | 1 | $52,163 | $40,473 | $54,123 | $60,000 | $59,892 | $71,000 |
| 15 | Barricades, signs and traffic handling (502-7001) | MO | 2 | $12,000 | $4,368.00 | $5,302.00 | $29,500 | $14,232 | $14,000 |
| 16 | Portable changeable message sign (503-7002) | EACH | 2 | $5,200.00 | $20,739 | $4,905.00 | $2,661.15 | $3,420.00 | $18,665 |
| 17 | TMA (stationary) (505-7001) | DAY | 32 | $155.00 | $240.74 | $249.00 | $592.00 | $408.00 | $450.00 |
| 18 | Biodegradable erosion control logs (install) (8") (506-7043) | LF | 56 | $5.00 | $7.56 | $15.00 | $8.00 | $11.00 | $2.00 |
| 19 | Biodegradable erosion control logs (remove) (506-7046) | LF | 56 | $3.00 | $2.00 | $5.00 | $2.30 | $3.00 | $1.00 |
| 20 | Colored textured concrete (4") (527-7001) | SY | 16 | $125.00 | $211.12 | $243.00 | $217.00 | $456.00 | $260.00 |
| 21 | Concrete curb (type II) (529-7002) | LF | 246 | $50.00 | $33.34 | $30.00 | $35.00 | $76.00 | $40.00 |
| 22 | Driveways (concrete) (530-7006) | SY | 7 | $150.00 | $211.12 | $163.00 | $217.00 | $646.00 | $260.00 |
| 23 | Concrete sidewalks (4") (531-7001) | SY | 115 | $130.00 | $144.45 | $154.00 | $150.00 | $182.00 | $150.00 |
| 24 | Curb ramps (type 1) (531-7005) | EACH | 4 | $3,900.00 | $4,222.23 | $2,345.00 | $4,350.00 | $4,104.00 | $5,000.00 |
| 25 | Curb ramps (type 3) (531-7007) | EACH | 4 | $3,500.00 | $4,222.23 | $2,645.00 | $4,350.00 | $4,104.00 | $5,000.00 |
| 26 | Conduit (PVC) (schedule 80) (2") (618-7054) | LF | 75 | $20.00 | $28.62 | $17.00 | $19.00 | $24.00 | $35.00 |
| 27 | Conduit (PVC) (schedule 80) (2") (bore) (618-7055) | LF | 305 | $46.00 | $42.77 | $31.00 | $11.75 | $31.00 | $68.00 |
| 28 | Conduit (PVC) (schedule 80) (3") (618-7060) | LF | 70 | $24.00 | $29.63 | $20.00 | $26.75 | $26.00 | $39.00 |
| 29 | Conduit (PVC) (schedule 80) (4") (618-7064) | LF | 20 | $32.00 | $29.57 | $28.00 | $32.30 | $28.00 | $40.00 |
| 30 | Conduit (PVC) (schedule 80) (4") (bore) (618-7065) | LF | 260 | $54.00 | $48.64 | $37.00 | $35.00 | $37.00 | $73.00 |
| 31 | Electrical conductor (no.10) insulated (620-7006) | LF | 450 | $2.00 | $2.27 | $1.50 | $1.75 | $1.25 | $2.00 |
| 32 | Electrical conductor (no.8) bare (620-7007) | LF | 645 | $2.50 | $2.39 | $2.00 | $1.75 | $1.25 | $3.00 |
| 33 | Electrical conductor (no.6) insulated (620-7010) | LF | 30 | $4.00 | $3.12 | $2.50 | $2.70 | $3.50 | $4.00 |
| 34 | Ground box type D (162922)W/apron (624-7008) | EACH | 5 | $2,000.00 | $2,094.45 | $1,864.00 | $2,075.00 | $2,011.00 | $2,800.00 |
| 35 | Remove electrical services (628-7002) | EACH | 1 | $1,000.00 | $1,600.00 | $602.00 | $570.00 | $631.00 | $1,800.00 |
| 36 | Elc SRV type D 120/240 100(NS)SS(E)PS(U) (628-7246) | EACH | 1 | $10,000 | $8,581.12 | $9,512.00 | $7,520.00 | $7,697.00 | $12,000 |
| 37 | Aluminum signs (type A) (636-7001) | SF | 121 | $50.00 | $38.67 | $40.00 | $79.00 | $42.00 | $80.00 |
| 38 | Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001) | EACH | 2 | $800.00 | $657.77 | $2,452.00 | $1,365.00 | $737.00 | $1,200.00 |
| 39 | Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024) | LF | 999 | $2.00 | $1.44 | $2.00 | $1.50 | $2.00 | $2.00 |
| 40 | Reflectorized pavement marking type I (W)12"(solid)(100MIL) (666-7030) | LF | 365 | $18.00 | $3.89 | $5.20 | $4.00 | $6.00 | $5.00 |
| 41 | Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036) | LF | 110 | $18.00 | $11.12 | $11.20 | $11.50 | $14.00 | $12.00 |
| 42 | Reflectorized pavement marking type I (W)(arrow)(100MIL) (666-7042) | EACH | 8 | $260.00 | $166.67 | $211.00 | $171.00 | $266.00 | $245.00 |
| 43 | Reflectorized pavement marking type I (W)(word)(100MIL) (666-7066) | EACH | 4 | $325.00 | $177.78 | $236.00 | $183.00 | $298.00 | $270.00 |
| 44 | Pavement sler 6" (666-7347) | LF | 1,990 | $0.75 | $0.19 | $0.30 | $0.20 | $0.25 | $0.50 |
| 45 | Pavement sler 8" (666-7348) | LF | 999 | $1.75 | $0.22 | $1.00 | $0.25 | $0.75 | $1.00 |
| 46 | Pavement sler 18" (666-7351) | LF | 365 | $3.25 | $0.27 | $2.00 | $0.30 | $2.25 | $2.00 |
| 47 | Pavement sler 24" (666-7352) | LF | 110 | $3.25 | $0.84 | $2.40 | $0.85 | $3.00 | $3.00 |
| 48 | Pavement sler (arrow) (666-7353) | EACH | 8 | $60.00 | $16.67 | $48.00 | $17.15 | $61.00 | $55.00 |
| 49 | Pavement sler (word) (666-7354) | EACH | 4 | $60.00 | $16.67 | $54.00 | $17.15 | $68.00 | $60.00 |
| 50 | Reflectorized pavement marking type I (W)6"(solid)(100MIL) (666-7411) | LF | 790 | $1.00 | $1.00 | $2.40 | $1.05 | $3.00 | $3.00 |
| 51 | Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423) | LF | 1,200 | $1.00 | $1.00 | $2.40 | $1.05 | $3.00 | $3.00 |
| 52 | Prefabricated PM type C (W)(24")(solid)contrast (668-7090) | LF | 256 | $30.00 | $16.39 | $31.00 | $17.00 | $39.00 | $35.00 |
| 53 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 15 | $10.00 | $4.45 | $33.00 | $4.60 | $41.00 | $38.00 |
| 54 | Reflectorized pavement marker type II-C-R (672-7006) | EACH | 50 | $10.00 | $4.45 | $8.70 | $4.60 | $11.00 | $10.00 |
| 55 | Eliminating existing PM & markers (6") (677-7002) | LF | 420 | $1.00 | $1.00 | $1.20 | $1.05 | $2.00 | $1.00 |
| 56 | Eliminating existing PM & markers (24") (677-7008) | LF | 80 | $5.00 | $2.23 | $3.70 | $2.30 | $5.00 | $4.00 |
| 57 | Eliminating existing PM & markers (plowable RPMS) (677-7031) | EACH | 8 | $2.00 | $5.56 | $12.00 | $6.00 | $15.00 | $14.00 |
| 58 | Pavement surface preparation for marking (6") (678-7002) | LF | 1,990 | $0.75 | $0.22 | $0.60 | $0.22 | $0.75 | $1.00 |
| 59 | Pavement surface preparation for marking (8") (678-7004) | LF | 999 | $1.00 | $0.25 | $1.00 | $0.25 | $1.00 | $1.00 |
| 60 | Pavement surface preparation for marking (18") (678-7007) | LF | 365 | $2.25 | $0.26 | $1.20 | $0.27 | $2.00 | $1.00 |
| 61 | Pavement surface preparation for marking (24") (678-7008) | LF | 366 | $2.25 | $0.45 | $3.00 | $0.45 | $3.00 | $3.00 |
| 62 | Pavement surface preparation for marking (arrow) (678-7009) | EACH | 8 | $60.00 | $14.45 | $36.00 | $14.90 | $46.00 | $40.00 |
| 63 | Pavement surface preparation for marking (word) (678-7016) | EACH | 4 | $60.00 | $14.45 | $48.00 | $14.90 | $61.00 | $55.00 |
| 64 | Pavement surface preparation for marking (RPM) (678-7033) | EACH | 65 | $7.00 | $0.67 | $2.00 | $0.70 | $2.00 | $2.00 |
| 65 | Removing traffic signals (680-7004) | EACH | 1 | $15,000 | $8,533.34 | $1,203.00 | $9,900.00 | $26,133 | $6,500.00 |
| 66 | Vehicle signal section (12")LED(green) (682-7001) | EACH | 8 | $370.00 | $305.56 | $227.00 | $340.00 | $362.00 | $700.00 |
| 67 | Vehicle signal section (12")LED(green arrow) (682-7002) | EACH | 4 | $370.00 | $305.56 | $227.00 | $340.00 | $362.00 | $700.00 |
| 68 | Vehicle signal section (12")LED(yel) (682-7003) | EACH | 8 | $370.00 | $305.56 | $227.00 | $340.00 | $362.00 | $700.00 |
| 69 | Vehicle signal section (12")LED(yel arrow) (682-7004) | EACH | 4 | $370.00 | $305.56 | $227.00 | $340.00 | $362.00 | $700.00 |
| 70 | Vehicle signal section (12")LED(red) (682-7005) | EACH | 8 | $370.00 | $305.56 | $227.00 | $340.00 | $362.00 | $700.00 |
| 71 | Vehicle signal section (12")LED(red arrow) (682-7006) | EACH | 4 | $370.00 | $305.56 | $227.00 | $340.00 | $362.00 | $700.00 |
| 72 | Pedestrian signal section (LED)(countdown) (682-7018) | EACH | 8 | $1,030.00 | $455.56 | $779.00 | $668.00 | $773.00 | $1,400.00 |
| 73 | Backplate W/ref border(3 sec)(vent)aluminum (682-7042) | EACH | 12 | $225.00 | $222.23 | $142.00 | $245.00 | $230.00 | $300.00 |
| 74 | Traffic signal CBL (type A)(14 AWG)(3 conductor) (684-7029) | LF | 730 | $4.50 | $2.45 | $2.00 | $2.00 | $2.00 | $3.00 |
| 75 | Traffic signal CBL (type A)(14 AWG)(10 conductor) (684-7036) | LF | 365 | $5.00 | $3.79 | $4.00 | $3.70 | $4.00 | $6.00 |
| 76 | Traffic signal CBL (type A)(14 AWG)(20 conductor) (684-7046) | LF | 345 | $7.50 | $7.22 | $8.00 | $7.35 | $9.00 | $9.00 |
| 77 | Ins traffic signal PL AM(S)1 arm(32')lum (686-7035) | EACH | 2 | $19,000 | $15,798 | $14,577 | $14,585 | $17,549 | $18,000 |
| 78 | Ins traffic signal PL AM(S)1 arm(36') (686-7037) | EACH | 1 | $19,500 | $15,272 | $15,758 | $14,850 | $19,385 | $17,100 |
| 79 | Ins traffic signal PL AM(S)1 arm(36')lum (686-7039) | EACH | 1 | $21,000 | $16,723 | $15,824 | $15,865 | $21,241 | $19,000 |
| 80 | Pedestrian pole assembly (687-7001) | EACH | 4 | $4,900.00 | $1,622.23 | $3,742.00 | $2,425.00 | $1,145.00 | $5,000.00 |
| 81 | Pedestrian detect push button (APS) (688-7001) | EACH | 8 | $2,050.00 | $818.89 | $1,236.00 | $945.00 | $995.00 | $1,100.00 |
| 82 | Pedestrian detector controller unit (688-7003) | EACH | 1 | $5,900.00 | $3,816.67 | $3,863.00 | $3,975.00 | $4,900.00 | $6,000.00 |
| 83 | Bbu system (external battery cabinet) (6007-7001) | EACH | 1 | $12,000 | $8,775.56 | $10,773 | $7,675.00 | $12,767 | $9,500.00 |
| 84 | CCTV field equipment (digital) (6018-7002) | EACH | 1 | $9,000.00 | $4,439.56 | $10,405 | $12,215 | $11,729 | $5,000.00 |
| 85 | CCTV mount (pole) (6018-7003) | EACH | 1 | $300.00 | $986.67 | $184.00 | $400.00 | $314.00 | $1,000.00 |
| 86 | Cofw emr vehicle (EV) preempt (inst only) (6031-7001) | EACH | 4 | $3,200.00 | $775.00 | $241.00 | $4,340.00 | $172.00 | $1,200.00 |
| 87 | Highway traffic signals (cofw) (6040-7001) | EACH | 1 | $30,000 | $35,784 | $57,835 | $47,710 | $58,995 | $70,000 |
| 88 | Cofw cellular router (inst only) (6049-7001) | EACH | 1 | $2,400.00 | $400.00 | $482.00 | $835.00 | $631.00 | $150.00 |
| 89 | Cat 5 ethernet cable (6055-7001) | LF | 25 | $3.00 | $2.70 | $4.00 | $11.30 | $2.00 | $4.00 |
| 90 | Feds processor unit (6100-7001) | EACH | 1 | $25,000 | $15,089 | $17,169 | $17,430 | $21,596 | $5,000.00 |
| 91 | Feds fish eye camera assembly (6100-7002) | EACH | 1 | $5,500.00 | $3,920.00 | $4,161.00 | $2,300.00 | $4,982.00 | $18,000 |
| 92 | Lifetime feds data collect & reporting (6100-7004) | EACH | 1 | $800.00 | $10,642 | $15,943 | $14,415 | $21,022 | $12,250 |
| 93 | Feds comm cable (ethernet - CAT5E) (6100-7006) | LF | 25 | $3.00 | $2.70 | $20.00 | $11.30 | $2.00 | $5.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of August 5, 2026. Compiled by Mirage Metrics.