TxDOT contract A00193863 bid tabulation
Install Advanced Traffic Management System, IH 30 (2nd Ave ramp to 1st Ave ramp). Let by Texas DOT on July 2, 2026, Dallas, Dallas District. 5 bids received; low bid $4,688,431 by Sice, Inc., -17% against the engineer's estimate of $5,674,110.
- Owner
- Texas DOT
- Letting
- 02 JUL 2026
- Pay items
- 71
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Sice, Inc. | $4,688,431 | Low | -17% |
| 2 | Elecnor Belco Electric, Inc. | $5,206,680 | +11% | -8.0% |
| 3 | Florida Traffic Control Devices, Inc. | $5,420,000 | +16% | -4.0% |
| 4 | Highway Intelligent Traffic Solutions, Inc. | $5,539,855 | +18% | -2.0% |
| 5 | Lumin8 Transportation Technologies, LLC | $6,622,168 | +41% | +17% |
Engineer's estimate: $5,674,110.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Sice, Inc. | 2. Elecnor Belco Electric, Inc. | 3. Florida Traffic Control Devices, Inc. | 4. Highway Intelligent Traffic Solutions, Inc. | 5. Lumin8 Transportation Technologies, LLC |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Drilled shaft (48 in) (416-7008) | LF | 189 | $573.15 | $496.00 | $885.00 | $542.43 | $1,010.00 | |
| 2 | Drilled shaft (sign mounts) (54 in) (416-7033) | LF | 204 | $761.43 | $575.00 | $1,045.00 | $700.51 | $1,508.00 | |
| 3 | Drilled shaft (high mast pole) (60 in) (416-7037) | LF | 32 | $754.86 | $806.00 | $1,330.00 | $814.91 | $2,426.00 | |
| 4 | Riprap (concrete)(4 in) (432-7001) | CY | 13.81 | $1,195.75 | $498.00 | $1,060.00 | $944.00 | $1,962.00 | |
| 5 | Riprap (mow strip)(4 in) (432-7013) | CY | 81 | $1,133.57 | $545.00 | $1,010.00 | $826.00 | $1,284.00 | |
| 6 | Mobilization (500-7001) | LS | 1 | $500,000 | $461,657 | $206,000 | $400,000 | $501,507 | $642,062 |
| 7 | Barricades, signs and traffic handling (502-7001) | MO | 16 | $15,000 | $6,091.44 | $9,850.00 | $19,335 | $5,498.59 | $30,837 |
| 8 | Portable changeable message sign (503-7001) | DAY | 150 | $100.00 | $186.48 | $123.00 | $168.00 | $49.02 | $210.00 |
| 9 | TMA (stationary) (505-7001) | DAY | 150 | $225.00 | $333.22 | $123.00 | $168.00 | $228.38 | $410.00 |
| 10 | Biodegradable erosion control logs (install) (18") (506-7045) | LF | 330 | $10.00 | $6.75 | $14.00 | $22.75 | $9.44 | $37.00 |
| 11 | Biodegradable erosion control logs (remove) (506-7046) | LF | 330 | $2.00 | $2.17 | $6.00 | $8.10 | $2.36 | $19.00 |
| 12 | Metal W-beam guard fence (timber post) (540-7001) | LF | 125 | $37.17 | $27.00 | $25.90 | $33.04 | $39.00 | |
| 13 | Metal W-beam guard fence (steel post) (540-7002) | LF | 1,600 | $37.17 | $36.00 | $34.50 | $35.40 | $48.00 | |
| 14 | Downstream anchor terminal section (540-7015) | EACH | 7 | $2,098.72 | $1,406.00 | $1,380.00 | $1,770.00 | $1,591.00 | |
| 15 | Remove downstream anchor terminal (542-7003) | EACH | 1 | $453.43 | $235.00 | $230.00 | $295.00 | $314.00 | |
| 16 | Guardrail end treatment (install) (544-7001) | EACH | 7 | $4,346.43 | $3,457.00 | $3,400.00 | $3,776.00 | $4,644.00 | |
| 17 | Guardrail end treatment (move & reset) (544-7002) | EACH | 3 | $4,346.43 | $1,289.00 | $1,265.00 | $1,416.00 | $5,095.00 | |
| 18 | Guardrail end treatment (remove) (544-7003) | EACH | 1 | $453.43 | $293.47 | $287.00 | $295.00 | $451.00 | |
| 19 | HI MST IL pole (150 FT)( 80 MPH) (613-7005) | EACH | 1 | $60,922 | $56,084 | $51,195 | $44,830 | $38,126 | |
| 20 | Conduit (PVC) (schedule 40) (2") (618-7030) | LF | 14,484 | $12.50 | $11.38 | $14.00 | $10.15 | $26.62 | $18.00 |
| 21 | Conduit (PVC) (schedule 40) (3") (618-7036) | LF | 10,064 | $14.00 | $12.17 | $18.00 | $12.00 | $28.08 | $19.00 |
| 22 | Conduit (PVC) (schedule 80) (2") (bore) (618-7055) | LF | 4,653 | $25.00 | $11.71 | $20.00 | $20.95 | $27.97 | $25.00 |
| 23 | Conduit (PVC) (schedule 80) (3") (bore) (618-7061) | LF | 1,812 | $29.00 | $12.50 | $25.00 | $21.25 | $29.97 | $27.00 |
| 24 | Conduit (RM) (2") (618-7078) | LF | 150 | $35.25 | $62.00 | $91.15 | $87.82 | $55.00 | |
| 25 | Conduit (prepare) (618-7090) | LF | 36,989 | $2.00 | $0.65 | $1.20 | $4.40 | $1.57 | $1.50 |
| 26 | Electrical conductor (no.8) bare (620-7007) | LF | 11,744 | $1.75 | $1.44 | $2.00 | $1.75 | $2.05 | $1.90 |
| 27 | Electrical conductor (no.8) insulated (620-7008) | LF | 38,251 | $2.00 | $1.61 | $2.00 | $2.15 | $2.41 | $1.90 |
| 28 | Electrical conductor (no.6) bare (620-7009) | LF | 8,695 | $1.95 | $2.30 | $2.00 | $2.66 | $2.40 | |
| 29 | Electrical conductor (no.6) insulated (620-7010) | LF | 21,012 | $2.18 | $2.30 | $2.50 | $3.14 | $2.40 | |
| 30 | Electrical conductor (no.4) bare (620-7011) | LF | 6,440 | $2.90 | $2.76 | $3.20 | $3.00 | $3.68 | $4.20 |
| 31 | Electrical conductor (no.4) insulated (620-7012) | LF | 15,092 | $3.15 | $3.08 | $3.20 | $3.55 | $4.14 | $4.20 |
| 32 | Electrical conductor (no.2) bare (620-7015) | LF | 7,899 | $3.91 | $4.40 | $4.20 | $5.42 | $6.10 | |
| 33 | Electrical conductor (no.2) insulated (620-7016) | LF | 19,933 | $4.30 | $4.40 | $4.85 | $6.05 | $6.10 | |
| 34 | Ground box type D (162922) (624-7007) | EACH | 36 | $920.25 | $1,114.00 | $831.00 | $1,582.57 | $1,411.00 | |
| 35 | Ground box type D (162922)W/apron (624-7008) | EACH | 71 | $1,650.00 | $1,393.33 | $1,524.00 | $1,665.00 | $1,985.44 | $1,819.00 |
| 36 | Remove electrical services (628-7002) | EACH | 3 | $750.97 | $598.00 | $336.00 | $1,555.72 | $567.00 | |
| 37 | Elc SRV type D 120/240 060(NS)SS(N)PS(U) (628-7154) | EACH | 13 | $7,301.12 | $6,824.00 | $8,220.00 | $7,491.27 | $13,142 | |
| 38 | Elc SRV type D 120/240 060(NS)SS(N)SP(O) (628-7156) | EACH | 1 | $8,043.09 | $7,058.00 | $11,975 | $10,117 | $12,900 | |
| 39 | Elc SRV type D 120/240 100(NS)GS(N)EX(O) (628-7229) | EACH | 1 | $2,037.45 | $7,177.00 | $7,410.00 | $6,753.77 | $12,900 | |
| 40 | Elc SRV type D 120/240 100(NS)SS(N)EX(U) (628-7254) | EACH | 2 | $2,905.44 | $4,358.00 | $8,880.00 | $5,013.27 | $12,641 | |
| 41 | Install small roadside sign support and assembly type 10BWG(1)SA(T) (644-7004) | EACH | 7 | $1,029.93 | $1,172.00 | $915.00 | $1,108.44 | $1,489.00 | |
| 42 | Install small roadside sign support and assembly TYS80(1)SA(T) (644-7028) | EACH | 1 | $388.65 | $1,172.00 | $915.00 | $1,474.07 | $1,216.00 | |
| 43 | Install small roadside sign support and assembly (rail mount) (644-7063) | EACH | 6 | $4,000.00 | $3,886.52 | $1,172.00 | $915.00 | $5,688.02 | $5,348.00 |
| 44 | Remove SM RD SN sup&AM (644-7073) | EACH | 2 | $161.94 | $586.00 | $212.00 | $737.92 | $150.00 | |
| 45 | Remove SM RD SN sup&AM (sign only) (644-7075) | EACH | 6 | $71.25 | $235.00 | $423.00 | $293.44 | $102.00 | |
| 46 | Install overhead sign support(30 FT bal tee) (650-7028) | EACH | 12 | $43,433 | $40,000 | $36,500 | $32,273 | $51,522 | |
| 47 | Sign walkway (48 in) with HNDRL (654-7006) | LF | 552 | $632.71 | $515.00 | $615.00 | $653.58 | $673.00 | |
| 48 | Install delineator assembly (D-SW)SZ 1(BRF)GF2 (658-7018) | EACH | 33 | $32.39 | $30.00 | $35.00 | $35.40 | $41.00 | |
| 49 | Reflectorized pavement marker type II-C-R (672-7006) | EACH | 238 | $7.50 | $11.66 | $10.00 | $6.00 | $31.91 | $10.00 |
| 50 | Eliminating existing PM & markers (arrow) (677-7009) | EACH | 2 | $107.53 | $1,172.00 | $86.00 | $610.11 | $62.00 | |
| 51 | Pavement surface preparation for marking (RPM) (678-7033) | EACH | 238 | $5.00 | $3.63 | $10.00 | $1.15 | $26.01 | $7.00 |
| 52 | Pedestrian pole assembly (687-7001) | EACH | 43 | $2,700.00 | $3,006.50 | $2,364.00 | $4,170.00 | $3,191.96 | $2,887.00 |
| 53 | Install circuit breaker (690-7304) | EACH | 17 | $500.00 | $481.06 | $107.00 | $592.00 | $1,511.24 | $6,801.00 |
| 54 | Install DMS (pole MTD cabinet) (6004-7001) | EACH | 1 | $11,695 | $21,000 | $12,383 | $12,381 | $77,382 | |
| 55 | Install DMS (foundation MTD cabinet) (6004-7002) | EACH | 11 | $14,596 | $19,688 | $15,115 | $14,446 | $4,827.00 | |
| 56 | ITS com CBL (ethernet) (6005-7001) | LF | 285 | $1.47 | $2.00 | $3.75 | $7.62 | $1.90 | |
| 57 | ITS RVSD (data collect & wwa) sys (6010-7001) | EACH | 9 | $14,101 | $14,500 | $15,370 | $13,859 | $9,544.00 | |
| 58 | ITS pole (60 FT)(90 MPH) (6011-7003) | EACH | 9 | $28,924 | $26,000 | $27,172 | $25,059 | $24,103 | |
| 59 | ITS pole MNT cab (type 3)(conf 1) (6011-7031) | EACH | 9 | $5,687.28 | $6,672.00 | $8,700.00 | $12,717 | $4,827.00 | |
| 60 | Ground box (prepare) (6013-7006) | EACH | 87 | $450.00 | $518.20 | $240.00 | $324.00 | $578.22 | $294.00 |
| 61 | Installation of cellular modem (6015-7001) | EACH | 17 | $307.72 | $957.00 | $106.00 | $1,673.72 | $1,834.00 | |
| 62 | CCTV field equip (digital) (install only) (6018-7001) | EACH | 11 | $745.55 | $2,000.00 | $850.00 | $1,673.72 | $283.00 | |
| 63 | CCTV mount (pedestal) (6018-7010) | EACH | 9 | $706.43 | $714.00 | $825.00 | $834.68 | $468.00 | |
| 64 | Fiber optic CBL (single-mode)(6 fiber) (6027-7011) | LF | 40,949 | $2.50 | $1.51 | $2.45 | $3.00 | $2.11 | $3.30 |
| 65 | Fiber optic patch panel (6 position) (6027-7012) | EACH | 42 | $2,400.00 | $452.13 | $1,515.00 | $1,385.00 | $2,083.02 | $688.00 |
| 66 | Wireless WWD system (6028-7001) | EACH | 17 | $50,000 | $31,169 | $61,000 | $42,615 | $33,859 | $48,138 |
| 67 | WWD LED sign (6028-7002) | EACH | 34 | $2,250.00 | $1,314.30 | $4,528.00 | $1,563.00 | $2,506.80 | $2,895.00 |
| 68 | WWD solar power system (6028-7004) | EACH | 8 | $2,250.00 | $9,009.10 | $6,162.00 | $3,465.00 | $3,185.66 | $652.00 |
| 69 | Ethernet switch (install only) (6036-7001) | EACH | 34 | $1,000.00 | $315.37 | $1,000.00 | $845.00 | $1,785.82 | $283.00 |
| 70 | Installation of terminal server (6046-7001) | EACH | 9 | $376.99 | $2,000.00 | $140.00 | $1,785.82 | $5,736.00 | |
| 71 | CCTV on high mast illumin. assem. (6094-7001) | EACH | 1 | $44,982 | $79,508 | $44,770 | $44,849 | $9,190.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of July 2, 2026. Compiled by Mirage Metrics.