TxDOT contract A00196246 bid tabulation
Rehabilitate Existing Roadway, SH 342 (Dallas County Line to US 77). Let by Texas DOT on October 8, 2025, Ellis, Dallas District. 5 bids received; low bid $5,190,650 by Austin Bridge & Road Services, LP, -6.0% against the engineer's estimate of $5,520,734.
- Owner
- Texas DOT
- Letting
- 08 OCT 2025
- Pay items
- 52
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Austin Bridge & Road Services, LP | $5,190,650 | Low | -6.0% |
| 2 | Foutsco Paving Company, LLC | $5,319,036 | +2.0% | -4.0% |
| 3 | Peachtree Construction, LTD. | $5,849,970 | +13% | +6.0% |
| 4 | Grey Sky Construction LLC | $5,957,450 | +15% | +8.0% |
| 5 | Texas Materials Group, Inc. | $6,541,440 | +26% | +18% |
Engineer's estimate: $5,520,734.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Austin Bridge & Road Services, LP | 2. Foutsco Paving Company, LLC | 3. Peachtree Construction, LTD. | 4. Grey Sky Construction LLC | 5. Texas Materials Group, Inc. |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Removing concrete (driveways) (104-7011) | SY | 5,143 | $21.00 | $14.80 | $14.00 | $33.90 | $20.00 | $26.00 |
| 2 | Remove (2"-6") TRT/untrt base & asphalt pavement (105-7002) | SY | 551 | $9.00 | $32.28 | $20.00 | $35.00 | $20.00 | $11.00 |
| 3 | Backfill (type A or B) (134-7004) | STA | 244 | $250.00 | $173.62 | $100.00 | $385.00 | $250.00 | $325.00 |
| 4 | SP mixes SP-C sac-B PG70-22 (344-7021) | TON | 15,118 | $135.00 | $122.40 | $158.35 | $135.10 | $145.00 | $162.00 |
| 5 | Tack coat (344-7077) | GAL | 14,398 | $2.00 | $4.00 | $0.10 | $0.50 | $5.00 | $4.45 |
| 6 | Flexible pavement structure repair(12") (351-7011) | SY | 5,614 | $100.00 | $101.08 | $105.00 | $105.50 | $110.00 | $123.00 |
| 7 | Plane & text asphalt concrete pavement(0" to 2") (354-7002) | SY | 130,895 | $2.25 | $2.50 | $1.00 | $3.25 | $3.00 | $2.54 |
| 8 | Riprap (mow strip)(4 in) (432-7013) | CY | 183 | $700.00 | $628.47 | $590.00 | $725.00 | $550.00 | $785.00 |
| 9 | RC pipe (CL III)(18 in) (464-7003) | LF | 3,829 | $78.00 | $69.40 | $68.00 | $66.80 | $65.00 | $71.00 |
| 10 | Set (type II) (18 in) (RCP) (6: 1) (P) (467-7308) | EACH | 224 | $1,300.00 | $952.60 | $950.00 | $1,219.00 | $1,250.00 | $1,275.00 |
| 11 | Removing structure (set) (496-7004) | EACH | 44 | $125.00 | $202.70 | $200.00 | $185.50 | $500.00 | $200.00 |
| 12 | Removing structure (wingwall) (496-7005) | EACH | 19 | $700.00 | $258.60 | $250.00 | $848.00 | $2,500.00 | $835.00 |
| 13 | Removing structure (pipe) (496-7007) | LF | 3,829 | $25.00 | $8.30 | $8.00 | $8.50 | $25.00 | $8.55 |
| 14 | Mobilization (500-7001) | LS | 1 | $501,885 | $570,972 | $300,000 | $535,000 | $550,000 | $593,198 |
| 15 | Barricades, signs and traffic handling (502-7001) | MO | 5 | $10,000 | $26,395 | $50,000 | $12,000 | $12,500 | $55,000 |
| 16 | Portable changeable message sign (503-7002) | EACH | 2 | $15,000 | $51.45 | $10,000 | $14,500 | $20,000 | $7,600.00 |
| 17 | TMA (stationary) (505-7001) | DAY | 47 | $230.00 | $986.06 | $400.00 | $145.00 | $250.00 | $700.00 |
| 18 | TMA (mobile operation) (505-7002) | HR | 120 | $75.00 | $1.50 | $1.00 | $30.00 | $55.00 | $1.00 |
| 19 | Temporary sediment control fence (install) (506-7039) | LF | 200 | $6.00 | $6.00 | $5.00 | $6.00 | $4.00 | $6.25 |
| 20 | Temporary sediment control fence (remove) (506-7041) | LF | 200 | $1.00 | $2.00 | $2.00 | $1.10 | $2.00 | $2.10 |
| 21 | Biodegradable erosion control logs (install) (12") (506-7044) | LF | 200 | $10.00 | $7.00 | $6.00 | $6.00 | $12.00 | $7.30 |
| 22 | Biodegradable erosion control logs (remove) (506-7046) | LF | 200 | $1.00 | $2.00 | $2.00 | $1.10 | $6.00 | $2.10 |
| 23 | Concrete curb (type II) (529-7002) | LF | 72 | $42.00 | $45.00 | $120.00 | $56.20 | $65.00 | $57.00 |
| 24 | Driveways (concrete) (hes) (530-7007) | SY | 5,143 | $110.00 | $103.77 | $100.00 | $143.10 | $100.00 | $128.00 |
| 25 | Driveways (ACP) (530-7010) | SY | 1,644 | $60.00 | $65.00 | $75.00 | $85.40 | $45.00 | $120.00 |
| 26 | Mill rumble strips (asphalt) (shoulder) (533-7001) | LF | 48,680 | $0.50 | $0.11 | $0.20 | $0.25 | $0.50 | $0.36 |
| 27 | Mill rumble strips (asphalt) (centerline) (533-7002) | LF | 24,340 | $1.00 | $0.11 | $0.20 | $0.25 | $0.50 | $0.48 |
| 28 | Metal W-beam guard fence (timber post) (540-7001) | LF | 2,075 | $20.00 | $20.25 | $22.00 | $21.50 | $25.00 | $24.00 |
| 29 | Metal beam guard fence trans (thrie-beam) (540-7005) | EACH | 6 | $2,000.00 | $1,925.00 | $1,900.00 | $1,616.00 | $1,850.00 | $2,180.00 |
| 30 | Metal beam guard fence trans (anchor plate) (540-7029) | EACH | 6 | $1,000.00 | $990.00 | $525.00 | $1,049.50 | $1,850.00 | $570.00 |
| 31 | Remove metal beam guard fence (542-7001) | LF | 2,075 | $4.00 | $2.50 | $3.50 | $2.65 | $3.00 | $3.80 |
| 32 | Guardrail end treatment (install) (544-7001) | EACH | 18 | $3,200.00 | $2,850.00 | $3,000.00 | $3,020.00 | $3,850.00 | $3,200.00 |
| 33 | Guardrail end treatment (remove) (544-7003) | EACH | 18 | $350.00 | $250.00 | $275.00 | $265.00 | $1,500.00 | $300.00 |
| 34 | Install delineator assembly (D-SW)SZ 1(BRF)CTB (BI) (658-7013) | EACH | 10 | $30.00 | $25.00 | $20.00 | $26.50 | $100.00 | $21.00 |
| 35 | Install delineator assembly (D-SW)SZ 1(BRF)GF2(BI) (658-7019) | EACH | 50 | $25.00 | $31.00 | $45.00 | $32.80 | $100.00 | $49.00 |
| 36 | Install object marker assembly (OM-4)(TWT)was (658-7072) | EACH | 6 | $140.00 | $300.00 | $350.00 | $325.00 | $100.00 | $328.00 |
| 37 | Work zone pavement marking SHT terminal (tab)type W (662-7112) | EACH | 3,022 | $1.20 | $0.50 | $0.10 | $2.50 | $6.00 | $1.20 |
| 38 | Work zone pavement marking SHT terminal (tab)type Y-2 (662-7114) | EACH | 2,837 | $1.05 | $0.50 | $0.10 | $2.50 | $6.00 | $1.22 |
| 39 | Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024) | LF | 1,689 | $1.00 | $0.95 | $0.95 | $0.95 | $6.00 | $1.00 |
| 40 | Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036) | LF | 502 | $8.40 | $6.50 | $6.50 | $7.00 | $20.00 | $6.80 |
| 41 | Reflectorized pavement marking type I (W)(arrow)(100MIL) (666-7042) | EACH | 12 | $170.00 | $150.00 | $150.00 | $132.00 | $250.00 | $158.00 |
| 42 | Reflectorized pavement marking type I (W)(word)(100MIL) (666-7066) | EACH | 12 | $200.00 | $160.00 | $160.00 | $157.00 | $250.00 | $168.00 |
| 43 | Ref pavement marking type I(W)18"(yld tri)(100MIL) (666-7087) | EACH | 10 | $40.00 | $50.00 | $50.00 | $57.00 | $350.00 | $53.00 |
| 44 | Pavement sler 6" (666-7347) | LF | 1,391 | $0.25 | $0.25 | $0.25 | $0.22 | $3.00 | $0.26 |
| 45 | Reflectorized pavement marking type I (W)6"(solid)(100MIL) (666-7411) | LF | 49,376 | $1.00 | $0.49 | $0.49 | $0.65 | $1.00 | $0.51 |
| 46 | Reflectorized pavement marking type I (Y)6"(broken)(100MIL) (666-7420) | LF | 1,838 | $1.00 | $0.55 | $0.55 | $0.65 | $3.00 | $0.58 |
| 47 | Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423) | LF | 46,006 | $1.00 | $0.49 | $0.49 | $0.65 | $1.00 | $0.51 |
| 48 | Reflectorized pavement marker type I-C (672-7002) | EACH | 85 | $4.30 | $3.75 | $3.75 | $4.10 | $6.00 | $3.90 |
| 49 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 1,199 | $4.15 | $3.75 | $3.75 | $4.10 | $6.00 | $3.90 |
| 50 | Eliminating existing PM & markers (4") (677-7001) | LF | 1,391 | $0.35 | $1.00 | $1.00 | $0.55 | $1.00 | $1.05 |
| 51 | Pavement surface preparation for marking (6") (678-7002) | LF | 1,391 | $0.10 | $0.25 | $0.25 | $0.02 | $3.00 | $0.26 |
| 52 | Tree trimming / brush removal (752-7001) | MI | 1.50 | $8,200.00 | $10,900 | $15,000 | $12,250 | $28,000 | $2,300.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of October 8, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.