TxDOT contract A00196393 bid tabulation
ILLUMINATION MAINTENANCE, US0084 (Various locations to in Waco District). Let by Texas DOT on September 5, 2025, McLennan, Waco District. 4 bids received; low bid $1,576,247 by Cross Plus Construction, LLC, -13% against the engineer's estimate of $1,819,360.
- Owner
- Texas DOT
- Letting
- 05 SEP 2025
- Pay items
- 68
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Cross Plus Construction, LLC | $1,576,247 | Low | -13% |
| 2 | Vaca Underground Utilities Inc | $1,710,575 | +9.0% | -6.0% |
| 3 | Austin Traffic Signal Construction Co., Inc. | $1,893,400 | +20% | +4.0% |
| 4 | E-Z Bel Construction, LLC | $1,923,675 | +22% | +6.0% |
Engineer's estimate: $1,819,360.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Cross Plus Construction, LLC | 2. Vaca Underground Utilities Inc | 3. Austin Traffic Signal Construction Co., Inc. | 4. E-Z Bel Construction, LLC |
|---|---|---|---|---|---|---|---|---|
| 1 | Drilled shaft (42 in) (416-7007) | LF | 24 | $650.00 | $641.00 | $500.00 | $300.00 | $600.00 |
| 2 | Drilled shaft (roadway illumination pole) (30 in) (416-7040) | LF | 50 | $557.50 | $500.00 | $300.00 | $350.00 | $275.00 |
| 3 | Drilled shaft (traffic signal pole) (24 in) (416-7042) | LF | 24 | $200.79 | $400.00 | $325.00 | $300.00 | $300.00 |
| 4 | Drilled shaft (traffic signal pole) (30 in) (416-7043) | LF | 24 | $496.21 | $500.00 | $350.00 | $400.00 | $400.00 |
| 5 | Drilled shaft (traffic signal pole) (36 in) (416-7044) | LF | 24 | $483.13 | $699.00 | $375.00 | $500.00 | $500.00 |
| 6 | Drilled shaft (traffic signal pole) (48 in) (416-7046) | LF | 24 | $701.94 | $1,200.00 | $600.00 | $700.00 | $700.00 |
| 7 | Riprap (concrete)(4 in) (432-7001) | CY | 10 | $1,650.00 | $900.00 | $1,000.00 | $1,000.00 | $800.00 |
| 8 | Mobilization (callout) (500-7002) | EACH | 12 | $692.95 | $15,000 | $15,000 | $17,500 | $16,000 |
| 9 | TMA (stationary) (505-7001) | DAY | 40 | $205.09 | $2,000.00 | $500.00 | $600.00 | $250.00 |
| 10 | Replace luminaire W/(250W EQ) LED (610-7012) | EACH | 15 | $650.00 | $500.00 | $450.00 | $800.00 | $800.00 |
| 11 | Replace luminaire W/(400W EQ) LED (610-7013) | EACH | 200 | $962.37 | $452.00 | $450.00 | $1,000.00 | $850.00 |
| 12 | In RD IL (type SA) 40T-8 (250W EQ) LED (610-7124) | EACH | 5 | $4,974.66 | $6,000.00 | $6,500.00 | $4,000.00 | $5,000.00 |
| 13 | In RD IL (type SP) 48S-8-8 (400W EQ) LED (610-7173) | EACH | 5 | $6,633.00 | $6,900.00 | $7,000.00 | $7,000.00 | $7,000.00 |
| 14 | Conduit (PVC) (schedule 40) (2") (618-7030) | LF | 1,000 | $24.18 | $15.00 | $15.00 | $25.00 | $20.00 |
| 15 | Conduit (PVC) (schedule 40) (3") (618-7036) | LF | 1,000 | $21.62 | $19.00 | $20.00 | $30.00 | $30.00 |
| 16 | Conduit (PVC) (schedule 80) (3") (bore) (618-7061) | LF | 2,000 | $41.00 | $45.00 | $30.00 | $55.00 | $44.00 |
| 17 | Conduit (RM) (3") (618-7082) | LF | 500 | $63.02 | $31.00 | $40.00 | $95.00 | $60.00 |
| 18 | Conduit (prepare) (618-7090) | LF | 1,000 | $7.88 | $15.00 | $2.00 | $4.00 | $20.00 |
| 19 | Electrical conductor (no.8) bare (620-7007) | LF | 79,000 | $2.87 | $1.56 | $2.15 | $2.00 | $2.25 |
| 20 | Electrical conductor (no.8) insulated (620-7008) | LF | 158,000 | $3.25 | $1.66 | $2.50 | $2.00 | $2.60 |
| 21 | Electrical conductor (no.6) bare (620-7009) | LF | 400 | $4.75 | $1.56 | $3.00 | $3.00 | $10.00 |
| 22 | Electrical conductor (no.6) insulated (620-7010) | LF | 800 | $4.75 | $1.56 | $3.50 | $4.00 | $10.00 |
| 23 | Ground box type A (122311)W/apron (624-7002) | EACH | 2 | $2,375.00 | $1,500.00 | $2,000.00 | $1,500.00 | $1,200.00 |
| 24 | Ground box type C (162911)W/apron (624-7006) | EACH | 3 | $2,500.00 | $1,500.00 | $2,000.00 | $2,000.00 | $1,600.00 |
| 25 | Ground box type D (162922)W/apron (624-7008) | EACH | 10 | $3,000.00 | $1,599.00 | $2,000.00 | $2,300.00 | $1,800.00 |
| 26 | Remove ground box (624-7013) | EACH | 10 | $175.00 | $200.00 | $1,000.00 | $500.00 | $250.00 |
| 27 | Zinc-coat steel wire strand (3/8") (625-7004) | LF | 500 | $3.50 | $14.00 | $15.00 | $5.00 | $5.00 |
| 28 | Remove electrical services (628-7002) | EACH | 2 | $500.00 | $1,200.00 | $500.00 | $700.00 | $350.00 |
| 29 | Elc SRV type D 120/240 060(NS)SS(E)PS(U) (628-7147) | EACH | 2 | $10,000 | $7,000.00 | $9,500.00 | $6,500.00 | $11,000 |
| 30 | Elc SRV type D 120/240 060(NS)SS(E)SP(O) (628-7148) | EACH | 2 | $12,000 | $7,000.00 | $6,500.00 | $6,200.00 | $11,000 |
| 31 | Aluminum signs (type O) (636-7003) | SF | 50 | $44.00 | $65.00 | $50.00 | $55.00 | $60.00 |
| 32 | Replace existing aluminum signs(type A) (636-7004) | SF | 50 | $25.00 | $65.00 | $50.00 | $200.00 | $75.00 |
| 33 | Replace existing aluminum signs(type O) (636-7006) | SF | 50 | $38.50 | $76.00 | $50.00 | $300.00 | $75.00 |
| 34 | Vehicle signal section (12")LED(green) (682-7001) | EACH | 15 | $284.19 | $400.00 | $400.00 | $500.00 | $350.00 |
| 35 | Vehicle signal section (12")LED(green arrow) (682-7002) | EACH | 15 | $287.61 | $400.00 | $400.00 | $500.00 | $350.00 |
| 36 | Vehicle signal section (12")LED(yel) (682-7003) | EACH | 15 | $284.19 | $400.00 | $400.00 | $500.00 | $350.00 |
| 37 | Vehicle signal section (12")LED(yel arrow) (682-7004) | EACH | 15 | $287.61 | $400.00 | $400.00 | $500.00 | $350.00 |
| 38 | Vehicle signal section (12")LED(red) (682-7005) | EACH | 15 | $284.19 | $400.00 | $400.00 | $500.00 | $350.00 |
| 39 | Vehicle signal section (12")LED(red arrow) (682-7006) | EACH | 10 | $287.61 | $400.00 | $400.00 | $500.00 | $350.00 |
| 40 | Pedestrian signal section (LED)(countdown) (682-7018) | EACH | 5 | $1,000.00 | $1,200.00 | $750.00 | $700.00 | $850.00 |
| 41 | Backplate W/reflectorized border(3 sec)aluminum (682-7039) | EACH | 5 | $197.50 | $300.00 | $250.00 | $225.00 | $200.00 |
| 42 | Backplate W/reflectorized border(4 sec)aluminum (682-7040) | EACH | 5 | $276.00 | $300.00 | $275.00 | $250.00 | $275.00 |
| 43 | Backplate W/reflectorized border(5 sec)aluminum (682-7041) | EACH | 5 | $300.00 | $300.00 | $300.00 | $275.00 | $300.00 |
| 44 | Traffic signal CBL (type A)(12 AWG)(3 conductor) (684-7008) | LF | 100 | $3.10 | $6.00 | $2.25 | $2.00 | $10.00 |
| 45 | Traffic signal CBL (type A)(12 AWG)(7 conductor) (684-7012) | LF | 200 | $3.94 | $6.00 | $3.25 | $4.00 | $20.00 |
| 46 | Traffic signal CBL (type A)(12 AWG)(16 conductor) (684-7021) | LF | 400 | $4.97 | $6.00 | $6.00 | $6.00 | $25.00 |
| 47 | Traffic signal CBL (type A)(14 AWG)(5 conductor) (684-7031) | LF | 200 | $2.00 | $6.00 | $2.25 | $3.00 | $10.00 |
| 48 | Ins traffic signal PL AM (mast)(install only) (686-7292) | EACH | 2 | $1,075.00 | $15,000 | $2,500.00 | $1,500.00 | $7,000.00 |
| 49 | Pedestrian pole assembly (687-7001) | EACH | 2 | $3,250.00 | $7,500.00 | $3,500.00 | $5,500.00 | $2,000.00 |
| 50 | Install of control cabinet(GRND MNT) (690-7040) | EACH | 5 | $8,475.00 | $7,500.00 | $4,500.00 | $2,500.00 | $25,000 |
| 51 | Remove vid image vehicle det sys (VIVDS) (690-7086) | EACH | 3 | $433.00 | $1,255.00 | $1,500.00 | $2,000.00 | $750.00 |
| 52 | Remove conductor (690-7150) | LF | 79,000 | $1.90 | $0.36 | $0.75 | $3.00 | $1.00 |
| 53 | Install electrical splice (690-7157) | EACH | 20 | $67.43 | $1,500.00 | $175.00 | $250.00 | $200.00 |
| 54 | Remove roadway illum assembly (HPS) (690-7163) | EACH | 5 | $700.00 | $2,500.00 | $1,500.00 | $1,000.00 | $1,500.00 |
| 55 | Remove roadway illum assembly (LED) (690-7166) | EACH | 5 | $675.00 | $2,500.00 | $2,000.00 | $1,000.00 | $1,500.00 |
| 56 | Remove foundation (690-7196) | EACH | 5 | $1,304.01 | $500.00 | $1,500.00 | $1,500.00 | $750.00 |
| 57 | Replace fuse (690-7218) | EACH | 450 | $75.61 | $125.00 | $75.00 | $50.00 | $75.00 |
| 58 | Replace breakaway fuse holder (690-7220) | EACH | 225 | $124.88 | $125.00 | $250.00 | $200.00 | $250.00 |
| 59 | VIVDS prosr sys (6006-7001) | EACH | 2 | $8,151.29 | $15,000 | $13,000 | $10,000 | $10,000 |
| 60 | VIVDS cam assy FXD LNS (6006-7002) | EACH | 2 | $5,348.07 | $2,500.00 | $2,500.00 | $5,000.00 | $4,000.00 |
| 61 | VIVDS cam assy var LNS (6006-7003) | EACH | 2 | $9,075.00 | $2,500.00 | $2,500.00 | $5,000.00 | $4,000.00 |
| 62 | VIVDS CNTRL software (6006-7005) | EACH | 2 | $497.80 | $5,000.00 | $775.00 | $1,000.00 | $450.00 |
| 63 | VIVDS cabling (6006-7007) | LF | 100 | $3.83 | $19.00 | $3.50 | $4.00 | $7.00 |
| 64 | VIVDS cabling (install only) (6006-7012) | LF | 500 | $0.50 | $10.00 | $1.25 | $3.00 | $4.00 |
| 65 | RVDS (presence and advance detection) (6008-7003) | EACH | 5 | $10,000 | $5,500.00 | $35,000 | $8,000.00 | $11,000 |
| 66 | CCTV field equip (digital) (install only) (6018-7001) | EACH | 2 | $2,235.00 | $9,000.00 | $250.00 | $1,000.00 | $2,000.00 |
| 67 | Install GND MT comm cabinet foundation (6050-7003) | EACH | 2 | $5,000.00 | $5,500.00 | $6,000.00 | $4,500.00 | $5,500.00 |
| 68 | Maintenance speed limit signing (7010-7001) | EACH | 15 | $67.00 | $155.00 | $500.00 | $1,000.00 | $1,500.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of September 5, 2025. Compiled by Mirage Metrics.