TxDOT contract A00209716 bid tabulation
Drainage Improvements, US 290 (At Cypress Creek to .). Let by Texas DOT on August 5, 2026, Harris, Houston District. 7 bids received; low bid $1,422,409 by Digg Commercial, LLC, +4.8% against the engineer's estimate of $1,357,254.
- Owner
- Texas DOT
- Letting
- 05 AUG 2026
- Pay items
- 30
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Digg Commercial, LLC | $1,422,409 | Low | +5.0% |
| 2 | Garret Shields Infrastructure | $1,478,546 | +4.0% | +9.0% |
| 3 | Isi Contracting, Inc. | $1,597,610 | +12% | +18% |
| 4 | Structural Integrity Group LLC | $1,819,523 | +28% | +34% |
| 5 | Jfo Services, LLC | $1,980,373 | +39% | +46% |
| 6 | Forde Construction Company, Inc. | $2,512,947 | +77% | +85% |
| 7 | MC2 Civil, LLC | $2,657,330 | +87% | +96% |
Engineer's estimate: $1,357,254.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Digg Commercial, LLC | 2. Garret Shields Infrastructure | 3. Isi Contracting, Inc. | 4. Structural Integrity Group LLC | 5. Jfo Services, LLC | 6. Forde Construction Company, Inc. |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Preparing row (100-7001) | ACRE | 2.65 | $9,811.35 | $17,875 | $5,000.00 | $16,500 | $3,500.00 | $20,512 | $58,000 |
| 2 | Excavation (channel) (110-7002) | CY | 2,900 | $25.23 | $15.00 | $30.00 | $15.00 | $22.75 | $79.43 | $32.00 |
| 3 | Embankment (final)(DC)(type C) (132-7006) | CY | 2,900 | $13.47 | $15.00 | $40.00 | $35.00 | $27.25 | $73.04 | $32.00 |
| 4 | Concrete structure repair(deck rep(part depth)) (429-7003) | SF | 660 | $99.38 | $120.00 | $150.00 | $152.00 | $112.00 | $114.87 | $190.00 |
| 5 | Riprap (concrete)(4 in) (432-7001) | CY | 166 | $567.13 | $600.00 | $600.00 | $365.00 | $675.00 | $656.02 | $858.00 |
| 6 | Riprap (stone protection)(18 in) (432-7043) | CY | 2,240 | $216.55 | $150.00 | $200.00 | $160.00 | $205.00 | $196.86 | $213.00 |
| 7 | Wingwall (PW - 1) (HW=7 FT) (466-7177) | EACH | 6 | $19,012 | $25,344 | $15,000 | $10,000 | $53,500 | $14,397 | $78,000 |
| 8 | Mobilization (500-7001) | LS | 1 | $125,525 | $115,000 | $100,000 | $100,000 | $125,000 | $188,956 | $248,000 |
| 9 | Barricades, signs and traffic handling (502-7001) | MO | 6 | $10,000 | $3,000.00 | $5,000.00 | $6,000.00 | $13,275 | $3,672.96 | $19,000 |
| 10 | Portable changeable message sign (503-7001) | DAY | 112 | $81.35 | $300.00 | $100.00 | $187.00 | $50.00 | $120.32 | $200.00 |
| 11 | TMA (stationary) (505-7001) | DAY | 24 | $254.17 | $2,800.00 | $300.00 | $3,250.00 | $1,375.00 | $633.27 | $200.00 |
| 12 | TMA (mobile operation) (505-7003) | DAY | 20 | $101.67 | $100.00 | $300.00 | $512.00 | $10.00 | $633.27 | $165.00 |
| 13 | Rock filter dams (install) (type 4) (506-7004) | LF | 120 | $64.30 | $54.00 | $20.00 | $38.00 | $54.00 | $44.33 | $85.00 |
| 14 | Rock filter dams (remove) (506-7011) | LF | 120 | $10.00 | $10.00 | $5.00 | $16.00 | $12.00 | $19.00 | $20.00 |
| 15 | Construction exits (install) (type 1) (506-7020) | SY | 224 | $35.58 | $31.00 | $20.00 | $27.00 | $29.00 | $31.66 | $60.00 |
| 16 | Construction exits (remove) (506-7024) | SY | 224 | $14.23 | $8.00 | $5.00 | $11.00 | $15.50 | $12.67 | $16.00 |
| 17 | Temporary sediment control fence (install) (506-7039) | LF | 700 | $4.45 | $4.00 | $5.00 | $2.44 | $3.00 | $2.85 | $4.00 |
| 18 | Temporary sediment control fence (remove) (506-7041) | LF | 700 | $0.76 | $1.00 | $1.00 | $0.81 | $1.00 | $0.95 | $2.00 |
| 19 | Biodegradable erosion control logs (install) (6") (506-7042) | LF | 700 | $1.02 | $20.00 | $5.00 | $7.58 | $5.00 | $8.87 | $3.00 |
| 20 | Biodegradable erosion control logs (remove) (506-7046) | LF | 700 | $1.53 | $1.00 | $1.00 | $2.16 | $1.00 | $2.53 | $1.00 |
| 21 | Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024) | LF | 80 | $1.50 | $20.00 | $1.25 | $2.16 | $23.00 | $2.53 | $3.00 |
| 22 | Reflectorized pavement marking type I (Y)8"(solid)(100MIL) (666-7114) | LF | 80 | $1.50 | $20.00 | $1.88 | $2.16 | $23.00 | $2.53 | $3.00 |
| 23 | Reflectorized pavement marking type II (W) 6" (broken) (666-7172) | LF | 30 | $0.50 | $30.00 | $2.20 | $1.73 | $23.00 | $2.03 | $2.00 |
| 24 | Reflectorized pavement marking type II (W) 6" (solid) (666-7175) | LF | 80 | $0.50 | $20.00 | $1.00 | $1.62 | $23.00 | $1.90 | $2.00 |
| 25 | Reflectorized pavement marking type II (Y) 6" (solid) (666-7213) | LF | 80 | $1.50 | $20.00 | $1.00 | $1.62 | $23.00 | $1.90 | $2.00 |
| 26 | Reflectorized pavement marking type I (W)6"(broken)(100MIL) (666-7408) | LF | 30 | $1.50 | $25.00 | $2.00 | $1.95 | $23.00 | $2.28 | $2.00 |
| 27 | Eliminating existing PM & markers (6") (677-7002) | LF | 190 | $1.00 | $10.00 | $3.00 | $0.32 | $30.00 | $0.38 | $0.35 |
| 28 | Pavement surface preparation for marking (6") (678-7002) | LF | 190 | $0.25 | $10.00 | $1.00 | $0.16 | $30.00 | $0.19 | $0.20 |
| 29 | Bridge joint replacement (SEJ) (785-7011) | LF | 570 | $302.46 | $463.00 | $400.00 | $850.00 | $580.00 | $629.46 | $615.00 |
| 30 | Replacing elastomeric bearing pads (787-7001) | EACH | 5 | $11,755 | $15,000 | $25,000 | $15,000 | $16,000 | $26,311 | $36,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of August 5, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.