TxDOT contract A00211859 bid tabulation
TRAFFIC SIGNAL MAINTENANCE, FM2410 (Various intersections to in McLennan County). Let by Texas DOT on December 2, 2025, Bell, Waco District. 7 bids received; low bid $1,401,798 by Striping Technology, L.P., -1.1% against the engineer's estimate of $1,417,711.
- Owner
- Texas DOT
- Letting
- 02 DEC 2025
- Pay items
- 84
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Striping Technology, L.P. | $1,401,798 | Low | -1.0% |
| 2 | Austin Traffic Signal Construction Co., Inc. | $1,443,921 | +3.0% | +2.0% |
| 3 | E-Z Bel Construction, LLC | $1,597,286 | +14% | +13% |
| 4 | Vaca Underground Utilities Inc | $1,642,505 | +17% | +16% |
| 5 | Highway Intelligent Traffic Solutions, Inc. | $1,677,290 | +20% | +18% |
| 6 | Cross Plus Construction, LLC | $1,701,664 | +21% | +20% |
| 7 | Elecnor Belco Electric, Inc. | $1,838,664 | +31% | +30% |
Engineer's estimate: $1,417,711.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Striping Technology, L.P. | 2. Austin Traffic Signal Construction Co., Inc. | 3. E-Z Bel Construction, LLC | 4. Vaca Underground Utilities Inc | 5. Highway Intelligent Traffic Solutions, Inc. | 6. Cross Plus Construction, LLC |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Removing concrete (riprap) (104-7006) | SY | 4 | $32.50 | $175.00 | $400.00 | $75.00 | $1,500.00 | $430.11 | $250.00 |
| 2 | Drilled shaft (42 in) (416-7007) | LF | 95 | $600.00 | $988.50 | $788.00 | $550.00 | $500.00 | $380.51 | $1,100.00 |
| 3 | Drilled shaft (roadway illumination pole) (30 in) (416-7040) | LF | 40 | $500.00 | $305.00 | $300.00 | $325.00 | $500.00 | $302.20 | $1,500.00 |
| 4 | Riprap (concrete)(4 in) (432-7001) | CY | 6.25 | $950.00 | $685.00 | $1,281.00 | $1,000.00 | $1,000.00 | $1,520.17 | $963.00 |
| 5 | Riprap (concrete)(CL A) (432-7004) | CY | 3 | $1,250.00 | $650.00 | $1,281.00 | $1,500.00 | $1,000.00 | $1,440.14 | $963.00 |
| 6 | Riprap (concrete)(CL B) (432-7005) | CY | 2 | $725.00 | $650.00 | $1,281.00 | $1,250.00 | $1,000.00 | $1,640.22 | $1,200.00 |
| 7 | Mobilization (500-7001) | LS | 1 | $50,000 | $95,000 | $130,000 | $150,000 | $175,000 | $139,412 | $140,000 |
| 8 | Barricades, signs and traffic handling (502-7001) | MO | 11 | $5,000.00 | $6,250.00 | $11,115 | $10,000 | $2,500.00 | $13,882 | $9,000.00 |
| 9 | Portable changeable message sign (503-7001) | DAY | 10 | $100.00 | $200.00 | $431.00 | $100.00 | $1,000.00 | $146.58 | $1.00 |
| 10 | TMA (stationary) (505-7001) | DAY | 86 | $215.00 | $250.00 | $330.00 | $250.00 | $500.00 | $363.79 | $200.00 |
| 11 | Remove and relay pavers (528-7003) | SY | 6 | $120.00 | $495.00 | $472.00 | $400.00 | $1,000.00 | $325.00 | $200.00 |
| 12 | Remove RD IL asm (trans-base) (610-7009) | EACH | 2 | $765.00 | $825.00 | $3,100.00 | $1,000.00 | $1,500.00 | $765.36 | $500.00 |
| 13 | Replace luminaire W/(250W EQ) LED (610-7012) | EACH | 3 | $522.01 | $1,350.00 | $330.00 | $800.00 | $750.00 | $690.40 | $800.00 |
| 14 | In RD IL (type SA) 40T-10 (250W EQ) LED (610-7126) | EACH | 4 | $5,600.00 | $5,425.00 | $5,892.00 | $5,500.00 | $7,500.00 | $5,007.11 | $6,500.00 |
| 15 | Conduit (PVC) (schedule 40) (2") (618-7030) | LF | 260 | $25.00 | $12.50 | $21.00 | $20.00 | $20.00 | $12.10 | $29.00 |
| 16 | Conduit (PVC) (schedule 80) (3") (618-7060) | LF | 1,235 | $20.00 | $13.50 | $25.00 | $35.00 | $25.00 | $18.10 | $68.00 |
| 17 | Conduit (PVC) (schedule 80) (3") (bore) (618-7061) | LF | 890 | $21.25 | $25.25 | $52.00 | $88.00 | $30.00 | $32.89 | $88.00 |
| 18 | Conduit (prepare) (618-7090) | LF | 9,929 | $4.50 | $5.55 | $1.00 | $2.00 | $2.00 | $3.26 | $25.00 |
| 19 | Electrical conductor (no.12) bare (620-7003) | LF | 1,480 | $6.00 | $1.75 | $1.00 | $2.00 | $2.00 | $1.82 | $5.00 |
| 20 | Electrical conductor (no.12) insulated (620-7004) | LF | 2,960 | $6.00 | $2.00 | $1.10 | $2.00 | $2.00 | $2.34 | $5.00 |
| 21 | Electrical conductor (no.8) bare (620-7007) | LF | 7,715 | $2.20 | $2.10 | $1.50 | $2.50 | $3.00 | $2.11 | $5.00 |
| 22 | Electrical conductor (no.8) insulated (620-7008) | LF | 10,498 | $3.35 | $2.30 | $2.00 | $2.50 | $3.00 | $2.33 | $5.00 |
| 23 | Electrical conductor (no.6) bare (620-7009) | LF | 824 | $4.75 | $2.30 | $3.00 | $3.00 | $3.50 | $2.50 | $5.00 |
| 24 | Electrical conductor (no.6) insulated (620-7010) | LF | 1,648 | $4.75 | $2.50 | $4.00 | $4.00 | $3.50 | $2.93 | $5.00 |
| 25 | Ground box type A (122311)W/apron (624-7002) | EACH | 3 | $1,500.00 | $1,250.00 | $2,000.00 | $1,250.00 | $2,000.00 | $1,267.50 | $2,100.00 |
| 26 | Ground box type D (162922) (624-7007) | EACH | 2 | $1,500.00 | $1,200.00 | $2,500.00 | $1,500.00 | $2,000.00 | $1,436.50 | $2,100.00 |
| 27 | Ground box type D (162922)W/apron (624-7008) | EACH | 23 | $1,700.00 | $1,545.50 | $3,000.00 | $2,000.00 | $2,000.00 | $2,499.90 | $2,100.00 |
| 28 | Remove ground box (624-7013) | EACH | 16 | $525.00 | $500.00 | $1,157.00 | $400.00 | $500.00 | $988.00 | $200.00 |
| 29 | Remove electrical services (628-7002) | EACH | 2 | $650.00 | $975.00 | $659.00 | $500.00 | $750.00 | $2,158.00 | $500.00 |
| 30 | Elc SRV type A 240/480 060(NS)SS(E)PS(U) (628-7047) | EACH | 1 | $8,700.00 | $8,605.00 | $7,358.00 | $10,000 | $15,000 | $10,779 | $8,500.00 |
| 31 | Elc SRV type A 240/480 060(NS)SS(E)SP(O) (628-7048) | EACH | 1 | $12,000 | $8,950.00 | $8,493.00 | $10,000 | $12,000 | $10,656 | $8,500.00 |
| 32 | Elc SRV type D 120/240 060(NS)AL(E)SP(O) (628-7121) | EACH | 5 | $6,000.00 | $8,655.00 | $6,443.00 | $10,000 | $7,500.00 | $10,575 | $8,500.00 |
| 33 | Aluminum signs (type A) (636-7001) | SF | 16 | $31.48 | $175.00 | $42.00 | $75.00 | $50.00 | $53.92 | $55.00 |
| 34 | Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024) | LF | 192 | $1.05 | $5.00 | $25.00 | $30.00 | $15.00 | $39.00 | $6.00 |
| 35 | Pavement sler 8" (666-7348) | LF | 192 | $0.50 | $5.00 | $5.00 | $10.00 | $2.00 | $13.00 | $25.00 |
| 36 | Pavement sler (word) (666-7354) | EACH | 2 | $87.00 | $500.00 | $200.00 | $150.00 | $500.00 | $195.00 | $500.00 |
| 37 | Pavement sler (uturn arrow) (666-7358) | EACH | 2 | $30.00 | $500.00 | $200.00 | $200.00 | $500.00 | $260.00 | $500.00 |
| 38 | Prefabricated PM type C (W)(uturn arrow) (668-7096) | EACH | 2 | $253.75 | $500.00 | $975.00 | $475.00 | $500.00 | $617.50 | $500.00 |
| 39 | Prefabricated PM type C (W)(word) (668-7103) | EACH | 2 | $387.08 | $500.00 | $900.00 | $525.00 | $500.00 | $682.50 | $500.00 |
| 40 | Reflectorized pavement marker type II-C-R (672-7006) | EACH | 10 | $2.11 | $50.00 | $50.00 | $50.00 | $25.00 | $65.00 | $25.00 |
| 41 | Eliminating existing PM & markers (6") (677-7002) | LF | 305 | $0.55 | $2.50 | $10.00 | $15.00 | $10.00 | $19.50 | $4.00 |
| 42 | Install highway traffic signal (upgrade) (680-7011) | EACH | 1 | $10,000 | $16,392 | $15,000 | $5,500.00 | $30,000 | $40,575 | $15,000 |
| 43 | Vehicle signal section (12")LED(green arrow) (682-7002) | EACH | 1 | $475.00 | $366.50 | $500.00 | $500.00 | $500.00 | $563.12 | $600.00 |
| 44 | Vehicle signal section (12")LED(yel arrow) (682-7004) | EACH | 2 | $475.00 | $366.50 | $500.00 | $500.00 | $500.00 | $563.12 | $600.00 |
| 45 | Vehicle signal section (12")LED(red arrow) (682-7006) | EACH | 1 | $475.00 | $366.50 | $500.00 | $500.00 | $500.00 | $563.12 | $600.00 |
| 46 | Vehicle signal section (12")LED(green U-turn arrow) (682-7007) | EACH | 1 | $300.00 | $455.00 | $500.00 | $500.00 | $500.00 | $563.12 | $600.00 |
| 47 | Vehicle signal section (12")LED(yel U-turn arrow) (682-7008) | EACH | 1 | $300.00 | $455.00 | $500.00 | $500.00 | $500.00 | $563.12 | $600.00 |
| 48 | Vehicle signal section (12")LED(red U-turn arrow) (682-7009) | EACH | 1 | $300.00 | $455.00 | $500.00 | $500.00 | $500.00 | $563.12 | $600.00 |
| 49 | Backplate W/reflectorized border(3 sec)aluminum (682-7039) | EACH | 1 | $247.50 | $275.00 | $200.00 | $500.00 | $200.00 | $310.92 | $956.00 |
| 50 | Backplate W/reflectorized border(4 sec)aluminum (682-7040) | EACH | 1 | $247.50 | $465.50 | $250.00 | $500.00 | $200.00 | $383.72 | $1,500.00 |
| 51 | Traffic signal CBL (type A)(12 AWG)(3 conductor) (684-7008) | LF | 9,213 | $1.54 | $3.25 | $2.00 | $2.00 | $2.00 | $2.82 | $6.00 |
| 52 | Traffic signal CBL (type A)(12 AWG)(5 conductor) (684-7010) | LF | 9,333 | $2.75 | $4.00 | $2.20 | $3.00 | $3.00 | $3.82 | $6.00 |
| 53 | Traffic signal CBL (type A)(12 AWG)(7 conductor) (684-7012) | LF | 3,526 | $4.50 | $4.75 | $2.65 | $4.00 | $4.00 | $4.94 | $6.00 |
| 54 | Traffic signal CBL (type A)(12 AWG)(16 conductor) (684-7021) | LF | 6,615 | $9.00 | $7.50 | $5.70 | $7.00 | $10.00 | $9.00 | $6.00 |
| 55 | Ins traffic signal PL AM(S)1 arm(48')lum (686-7051) | EACH | 1 | $20,500 | $16,925 | $19,507 | $19,000 | $25,000 | $21,357 | $9,500.00 |
| 56 | Pedestrian detect push button (APS) (688-7001) | EACH | 46 | $935.00 | $787.00 | $1,022.00 | $1,000.00 | $1,000.00 | $1,362.52 | $500.00 |
| 57 | Pedestrian detector controller unit (688-7003) | EACH | 6 | $6,569.75 | $2,875.00 | $4,310.00 | $3,500.00 | $3,500.00 | $4,517.50 | $4,600.00 |
| 58 | Removal of conduit (690-7001) | LF | 458 | $5.00 | $3.00 | $3.00 | $5.00 | $2.00 | $3.25 | $5.00 |
| 59 | Removal of cables (690-7009) | LF | 38,065 | $1.90 | $1.10 | $1.00 | $1.00 | $2.00 | $1.30 | $1.00 |
| 60 | Removal of timber poles (690-7021) | EACH | 2 | $1,075.00 | $1,150.00 | $659.00 | $1,250.00 | $1,000.00 | $1,807.00 | $500.00 |
| 61 | Removal of signal head assembly (690-7024) | EACH | 4 | $77.00 | $420.00 | $500.00 | $500.00 | $75.00 | $422.50 | $300.00 |
| 62 | Install of signal head assembly (690-7026) | EACH | 3 | $368.50 | $1,000.00 | $825.00 | $500.00 | $1,000.00 | $1,007.50 | $599.00 |
| 63 | Removal of signal related signs (690-7027) | EACH | 2 | $140.00 | $255.00 | $44.00 | $250.00 | $50.00 | $260.00 | $500.00 |
| 64 | Install of signal related signs (690-7029) | EACH | 1 | $361.00 | $750.00 | $350.00 | $750.00 | $500.00 | $325.00 | $600.00 |
| 65 | Removal of pedestrian push buttons (690-7030) | EACH | 46 | $27.50 | $195.50 | $31.00 | $75.00 | $50.00 | $325.00 | $100.00 |
| 66 | Replace of control cabinet(GRND MNT) (690-7039) | EACH | 1 | $5,000.00 | $6,878.50 | $1,320.00 | $2,500.00 | $25,000 | $7,832.50 | $10,000 |
| 67 | Removal of signal pole assembly (690-7051) | EACH | 1 | $2,000.00 | $1,723.00 | $4,200.00 | $2,000.00 | $1,500.00 | $3,607.50 | $200.00 |
| 68 | Remove pedestrian pole assembly (690-7089) | EACH | 1 | $500.00 | $525.00 | $165.00 | $750.00 | $500.00 | $617.50 | $200.00 |
| 69 | Remove spread spectrum antenna (690-7097) | EACH | 2 | $150.00 | $365.00 | $82.00 | $500.00 | $250.00 | $325.00 | $200.00 |
| 70 | Subsurface util locate (non-paved area) (5061-7001) | EACH | 6 | $1,500.00 | $1,525.00 | $857.00 | $1,250.00 | $2,500.00 | $1,055.98 | $500.00 |
| 71 | VIVDS pros cabinet equip (remove) (6006-7017) | EACH | 7 | $550.00 | $245.00 | $300.00 | $500.00 | $1,000.00 | $325.00 | $200.00 |
| 72 | VIVDS cam assy (remove) (6006-7018) | EACH | 29 | $250.00 | $200.00 | $250.00 | $500.00 | $500.00 | $585.00 | $200.00 |
| 73 | VIVDS cabling (remove) (6006-7020) | LF | 7,512 | $0.75 | $0.95 | $1.00 | $1.00 | $1.00 | $1.30 | $2.00 |
| 74 | RVDS (presence and advance detection) (6008-7003) | EACH | 33 | $10,000 | $9,488.25 | $8,000.00 | $10,000 | $11,000 | $9,698.00 | $1,500.00 |
| 75 | Relocate RVDS (6008-7007) | EACH | 1 | $1,270.00 | $945.00 | $660.00 | $1,250.00 | $750.00 | $1,790.75 | $1,200.00 |
| 76 | Remove RVDS (6008-7008) | EACH | 10 | $204.00 | $250.00 | $110.00 | $500.00 | $500.00 | $455.00 | $500.00 |
| 77 | ITS pole (50 FT) (90 MPH) (6011-7005) | EACH | 5 | $22,500 | $15,500 | $15,956 | $20,000 | $17,500 | $17,713 | $8,500.00 |
| 78 | ITS pole MNT cab (type 1)(conf 2) (6011-7017) | EACH | 5 | $11,150 | $7,597.00 | $9,000.00 | $10,000 | $5,500.00 | $8,847.96 | $7,200.00 |
| 79 | Ground box (prepare) (6013-7006) | EACH | 51 | $360.00 | $384.00 | $900.00 | $500.00 | $750.00 | $715.00 | $1,200.00 |
| 80 | Ground box (adjust) (6013-7007) | EACH | 2 | $700.00 | $625.00 | $1,539.00 | $1,000.00 | $750.00 | $715.00 | $200.00 |
| 81 | CCTV field equip (digital) (install only) (6018-7001) | EACH | 5 | $1,500.00 | $2,868.90 | $394.00 | $1,250.00 | $4,500.00 | $2,539.71 | $2,500.00 |
| 82 | ITS com CBL (ethernet) (6018-7004) | LF | 300 | $3.50 | $5.25 | $3.00 | $3.00 | $5.00 | $9.04 | $21.00 |
| 83 | Relocate CCTV field equipment (6018-7007) | EACH | 1 | $1,948.92 | $2,325.00 | $330.00 | $1,250.00 | $4,500.00 | $3,426.83 | $1,000.00 |
| 84 | Maintenance speed limit signing (7010-7001) | EACH | 7 | $1,000.00 | $825.00 | $880.00 | $5,000.00 | $500.00 | $262.86 | $500.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of December 2, 2025. Compiled by Mirage Metrics.