| 1 | Preparing row (100-7002) | STA | 110 | $400.00 | $700.00 | $1,465.00 | $1,450.00 |
| 2 | Removing concrete (mowstrip) (104-7003) | SY | 162 | | $22.00 | $25.00 | $35.00 |
| 3 | Removing concrete (riprap) (104-7006) | SY | 220 | | $22.00 | $27.00 | $23.75 |
| 4 | Remove (6") TRT/untrt base & asphalt pavement (105-7085) | CY | 4,930 | $22.00 | $20.00 | $38.75 | $13.25 |
| 5 | Remove stab base and asphalt pavement (6"-20") (105-7123) | SY | 161 | | $55.00 | $32.00 | $29.50 |
| 6 | Excavation (roadway) (110-7001) | CY | 4,598 | $9.50 | $23.00 | $18.65 | $10.25 |
| 7 | Embankment (final)(OC)(type A) (132-7001) | CY | 4,152 | $23.00 | $21.00 | $19.25 | $16.25 |
| 8 | Furn & place topsoil (6") (160-7004) | SY | 35,644 | $10.00 | $0.80 | $1.85 | $12.75 |
| 9 | Broadcast seed (permanent_rural_sand) (164-7001) | SY | 35,644 | $0.75 | $0.30 | $0.36 | $0.45 |
| 10 | Broadcast seed (temporary_warm) (164-7005) | SY | 35,644 | $0.75 | $0.20 | $0.30 | $0.40 |
| 11 | Vegetative watering (168-7001) | TGL | 555 | $30.00 | $40.00 | $35.00 | $34.50 |
| 12 | Proof rolling (216-7001) | HR | 7 | $250.00 | $124.00 | $143.00 | $66.00 |
| 13 | FL BS (compacted in place)(type A GR 1-2) (12") (247-7113) | SY | 14,806 | $85.00 | $44.00 | $52.20 | $41.75 |
| 14 | D-GR HMA type-B sac-B PG70-22 (341-7007) | TON | 3,107 | $102.00 | $120.00 | $113.50 | $140.00 |
| 15 | D-GR HMA type-C sac-A PG76-22 (341-7031) | TON | 1,384 | $125.00 | $160.00 | $166.00 | $176.00 |
| 16 | Drilled shaft (18 in) (416-7002) | LF | 298 | | $300.00 | $240.00 | $232.00 |
| 17 | Riprap (concrete)(CL A) (432-7004) | CY | 379 | | $628.00 | $735.00 | $717.00 |
| 18 | Removing structure (set) (496-7004) | EACH | 4 | $2,185.00 | $700.00 | $480.00 | $500.00 |
| 19 | Removing structure (pipe) (496-7007) | LF | 142 | $30.00 | $36.00 | $20.00 | $20.00 |
| 20 | Mobilization (500-7001) | LS | 1 | $296,233 | $330,000 | $429,000 | $495,000 |
| 21 | Barricades, signs and traffic handling (502-7001) | MO | 8 | $12,500 | $7,000.00 | $11,700 | $1,840.00 |
| 22 | Portable changeable message sign (503-7002) | EACH | 2 | | $12,000 | $1,600.00 | $9,030.00 |
| 23 | TMA (stationary) (505-7001) | DAY | 243 | $300.00 | $300.00 | $10.00 | $181.00 |
| 24 | TMA (mobile operation) (505-7003) | DAY | 15 | $200.00 | $680.00 | $20.00 | $422.00 |
| 25 | Rock filter dams (install) (type 1) (506-7001) | LF | 1,255 | $44.00 | $39.00 | $47.00 | $38.75 |
| 26 | Rock filter dams (remove) (506-7011) | LF | 1,255 | $15.00 | $22.00 | $14.00 | $13.75 |
| 27 | Temporary sediment control fence (install) (506-7039) | LF | 3,456 | $5.00 | $3.80 | $6.00 | $4.90 |
| 28 | Temporary sediment control fence (remove) (506-7041) | LF | 3,456 | $2.00 | $1.60 | $2.00 | $2.35 |
| 29 | Biodegradable erosion control logs (install) (8") (506-7043) | LF | 761 | $7.00 | $6.20 | $8.00 | $5.25 |
| 30 | Biodegradable erosion control logs (install) (12") (506-7044) | LF | 200 | | $6.20 | $8.00 | $5.65 |
| 31 | Biodegradable erosion control logs (remove) (506-7046) | LF | 961 | $3.00 | $1.80 | $3.00 | $1.25 |
| 32 | Portable concrete traffic barrier (furnish and install)(single slope)(type 1) (512-7001) | LF | 7,295 | | $90.00 | $92.30 | $111.00 |
| 33 | Portable concrete traffic barrier (des source)(single slope)(type 1) (512-7013) | LF | 3,000 | $15.00 | $26.00 | $17.00 | $8.65 |
| 34 | Portable concrete traffic barrier (move)(single slope)(type 1) (512-7025) | LF | 20,810 | $8.00 | $10.00 | $13.70 | $9.00 |
| 35 | Portable concrete traffic barrier (stockpile)(single slope)(type 1) (512-7037) | LF | 3,000 | | $16.00 | $15.85 | $5.20 |
| 36 | Portable concrete traffic barrier (remove)(single slope)(type 1) (512-7049) | LF | 120 | | $17.00 | $27.00 | $5.20 |
| 37 | Portable concrete traffic barrier (pinning) (512-7071) | EACH | 969 | | $50.00 | $36.00 | $112.00 |
| 38 | Permanent CTB (tran SSCB to SSTR) (mod) (514-7038) | LF | 90 | | $340.00 | $550.00 | $1,220.00 |
| 39 | Remove metal beam guard fence (542-7001) | LF | 101 | | $5.00 | $8.00 | $4.20 |
| 40 | Remove downstream anchor terminal (542-7003) | EACH | 2 | | $300.00 | $365.00 | $852.00 |
| 41 | RM metal beam guard fence trans (thrie-beam) (542-7004) | EACH | 3 | | $300.00 | $365.00 | $439.00 |
| 42 | Guardrail end treatment (remove) (544-7003) | EACH | 1 | | $300.00 | $550.00 | $381.00 |
| 43 | Crash cushion attenuator (move & reset) (545-7002) | EACH | 14 | $2,500.00 | $1,000.00 | $1,125.00 | $1,830.00 |
| 44 | Crash cushion attenuator (remove) (545-7004) | EACH | 5 | | $970.00 | $790.00 | $1,260.00 |
| 45 | Crash cushion attenuator (install)(S)(N)(TL3) (545-7014) | EACH | 1 | | $9,200.00 | $8,500.00 | $12,100 |
| 46 | Relocate RD IL asm (trans-base) (610-7004) | EACH | 1 | | $3,000.00 | $0.01 | $7,830.00 |
| 47 | Aluminum signs (type A) (636-7001) | SF | 6.25 | | $44.00 | $40.00 | $102.00 |
| 48 | Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001) | EACH | 15 | $800.00 | $840.00 | $775.00 | $958.00 |
| 49 | Install small roadside sign support and assembly type 10BWG(1)SA(T) (644-7004) | EACH | 3 | $930.00 | $1,000.00 | $950.00 | $1,140.00 |
| 50 | Install small roadside sign support and assembly TYS80(2)SA(P) (644-7048) | EACH | 5 | $1,610.00 | $2,100.00 | $1,950.00 | $2,350.00 |
| 51 | Relocate SM RD SN sup&AM type 10BWG (644-7065) | EACH | 16 | $1,000.00 | $725.00 | $675.00 | $814.00 |
| 52 | Remove SM RD SN sup&AM (644-7073) | EACH | 30 | $106.00 | $70.00 | $65.00 | $78.50 |
| 53 | Install delineator assembly (D-SY)SZ 1(BRF)CTB (658-7031) | EACH | 72 | | $70.00 | $65.00 | $78.50 |
| 54 | Work zone pavement marking removing (traffic BTN) type W (662-7058) | LF | 16,200 | $1.02 | $0.46 | $0.42 | $0.50 |
| 55 | Work zone pavement marking removing (traffic BTN) type Y (662-7060) | LF | 8,100 | $1.02 | $0.46 | $0.42 | $0.50 |
| 56 | Reflectorized pavement marking type I (W)8"(DOT)(100MIL) (666-7018) | LF | 1,490 | $1.20 | $1.20 | $1.10 | $1.30 |
| 57 | Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024) | LF | 5,747 | $1.03 | $0.90 | $0.88 | $1.05 |
| 58 | Reflectorized pavement marking type I (W)12"(solid)(100MIL) (666-7030) | LF | 201 | $3.00 | $2.70 | $2.50 | $3.00 |
| 59 | Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036) | LF | 12 | | $26.00 | $24.00 | $29.00 |
| 60 | Reflectorized pavement marking type I (W)(arrow)(100MIL) (666-7042) | EACH | 3 | | $210.00 | $200.00 | $241.00 |
| 61 | Reflectorized pavement marking type I(W)(uturn arrow)(100MIL) (666-7051) | EACH | 6 | $340.00 | $425.00 | $400.00 | $482.00 |
| 62 | Reflectorized pavement marking type I (W)(word)(100MIL) (666-7066) | EACH | 9 | $180.00 | $325.00 | $300.00 | $361.00 |
| 63 | Reflectorized pavement marking type I (Y)8"(solid)(100MIL) (666-7114) | LF | 141 | $2.00 | $2.10 | $2.00 | $2.40 |
| 64 | Reflectorized pavement marking type I (Y)24"(solid)(100MIL) (666-7123) | LF | 83 | $10.00 | $28.00 | $26.00 | $31.25 |
| 65 | Pavement sler 6" (666-7347) | LF | 20,308 | $1.00 | $0.40 | $0.38 | $0.50 |
| 66 | Pavement sler 8" (666-7348) | LF | 7,378 | $1.00 | $0.50 | $0.48 | $0.60 |
| 67 | Pavement sler 12" (666-7350) | LF | 201 | $2.00 | $1.60 | $1.50 | $1.80 |
| 68 | Pavement sler 24" (666-7352) | LF | 95 | $3.50 | $3.20 | $3.00 | $3.60 |
| 69 | Pavement sler (arrow) (666-7353) | EACH | 3 | | $16.00 | $15.00 | $18.00 |
| 70 | Pavement sler (word) (666-7354) | EACH | 9 | $30.00 | $27.00 | $25.00 | $30.00 |
| 71 | Pavement sler (uturn arrow) (666-7358) | EACH | 6 | $100.00 | $27.00 | $25.00 | $30.00 |
| 72 | Reflectorized pavement marking type I (W)6"(broken)(100MIL) (666-7408) | LF | 1,310 | $1.75 | $1.40 | $1.30 | $1.55 |
| 73 | Reflectorized pavement marking type I (W)6"(solid)(100MIL) (666-7411) | LF | 7,590 | $1.75 | $1.00 | $0.98 | $1.20 |
| 74 | Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423) | LF | 11,408 | $1.75 | $0.90 | $0.84 | $1.00 |
| 75 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 12 | $10.00 | $8.00 | $7.50 | $9.05 |
| 76 | Reflectorized pavement marker type II-C-C (672-7005) | EACH | 71 | $8.00 | $8.00 | $7.50 | $9.05 |
| 77 | Reflectorized pavement marker type II-C-R (672-7006) | EACH | 342 | $7.00 | $8.00 | $7.50 | $9.05 |
| 78 | Eliminating existing PM & markers (6") (677-7002) | LF | 14,075 | $0.45 | $0.64 | $0.60 | $0.70 |
| 79 | Eliminating existing PM & markers (8") (677-7004) | LF | 2,317 | $0.73 | $0.74 | $0.70 | $0.85 |
| 80 | Eliminating existing PM & markers (24") (677-7008) | LF | 201 | $2.10 | $5.50 | $5.00 | $6.00 |
| 81 | Eliminating existing PM & markers (arrow) (677-7009) | EACH | 20 | $44.00 | $80.00 | $75.00 | $90.50 |
| 82 | Eliminating existing PM & markers (word) (677-7015) | EACH | 10 | $44.00 | $80.00 | $75.00 | $90.50 |
| 83 | Bonding course (3007-7001) | GAL | 1,479 | $9.00 | $4.00 | $3.80 | $5.50 |