TxDOT contract A00215133 bid tabulation
BRIDGE PREVENTATIVE MAINTENANCE, IH0045 (Stokes Road to Stokes Road). Let by Texas DOT on August 19, 2025, Harris, Houston District. 6 bids received; low bid $289,066 by Structural Integrity Group LLC, -36% against the engineer's estimate of $449,355.
- Owner
- Texas DOT
- Letting
- 19 AUG 2025
- Pay items
- 9
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Structural Integrity Group LLC | $289,066 | Low | -36% |
| 2 | Garret Shields Infrastructure | $394,050 | +36% | -12% |
| 3 | MC2 Civil, LLC | $398,975 | +38% | -11% |
| 4 | Isi Contracting, Inc. | $399,075 | +38% | -11% |
| 5 | SCR Civil Construction, LLC | $399,717 | +38% | -11% |
| 6 | Rhino Equity, LLC | $564,325 | +95% | +26% |
Engineer's estimate: $449,355.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Structural Integrity Group LLC | 2. Garret Shields Infrastructure | 3. MC2 Civil, LLC | 4. Isi Contracting, Inc. | 5. SCR Civil Construction, LLC | 6. Rhino Equity, LLC |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Concrete structure repair(deck rep(part depth)) (429-7003) | SF | 100 | $265.50 | $157.00 | $150.00 | $250.00 | $175.00 | $210.00 | $600.00 |
| 2 | Concrete structure repair (vertical & overhead) (429-7007) | SF | 1,292 | $200.00 | $95.00 | $200.00 | $175.00 | $225.00 | $176.00 | $200.00 |
| 3 | Cleaning and sealing existing joints (438-7001) | LF | 525 | $80.00 | $20.00 | $50.00 | $45.00 | $34.00 | $55.00 | $250.00 |
| 4 | Mobilization (500-7001) | LS | 1 | $52,380 | $1.00 | $30,000 | $39,000 | $10,000 | $39,000 | $50,000 |
| 5 | Barricades, signs and traffic handling (502-7001) | MO | 3 | $8,050.00 | $6,000.00 | $5,000.00 | $8,000.00 | $4,500.00 | $11,000 | $2,000.00 |
| 6 | Portable changeable message sign (503-7001) | DAY | 14 | $250.00 | $2,000.00 | $100.00 | $250.00 | $500.00 | $250.00 | $200.00 |
| 7 | TMA (stationary) (505-7001) | DAY | 60 | $277.00 | $125.00 | $300.00 | $200.00 | $350.00 | $100.00 | $500.00 |
| 8 | Concrete rail repair (in-kind) (778-7001) | LF | 45 | $400.00 | $500.00 | $500.00 | $650.00 | $145.00 | $610.00 | $325.00 |
| 9 | Bridge joint repair (armor) (785-7004) | LF | 15 | $517.00 | $4,275.00 | $500.00 | $1,100.00 | $1,000.00 | $900.00 | $750.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of August 19, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.