TxDOT contract A00216240 bid tabulation
METAL BEAM GUARD FENCE REPAIR, US0059 (ANGELINA COUNTY to VARIOUS LOCATIONS). Let by Texas DOT on July 23, 2025, Angelina, Lufkin District. 3 bids received; low bid $293,167 by Rhino Equity, LLC, +3.8% against the engineer's estimate of $282,300.
- Owner
- Texas DOT
- Letting
- 23 JUL 2025
- Pay items
- 31
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Rhino Equity, LLC | $293,167 | Low | +4.0% |
| 2 | Austin Barricade Company, L.L.C. | $301,866 | +3.0% | +7.0% |
| 3 | Ace Contractors, Inc. | $389,469 | +33% | +38% |
Engineer's estimate: $282,300.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Rhino Equity, LLC | 2. Austin Barricade Company, L.L.C. | 3. Ace Contractors, Inc. |
|---|---|---|---|---|---|---|---|
| 1 | Concrete structure repair (vertical & overhead) (429-7007) | SF | 10 | $40.00 | $40.00 | $66.00 | $250.00 |
| 2 | Concrete structure repair (standard) (429-7009) | SF | 10 | $100.00 | $40.00 | $65.00 | $250.00 |
| 3 | Mobilization (callout) (500-7002) | EACH | 10 | $250.00 | $1.00 | $1.00 | $500.00 |
| 4 | TMA (stationary) (505-7001) | DAY | 30 | $250.00 | $2,500.00 | $500.00 | $300.00 |
| 5 | Metal W-beam guard fence (timber post) (540-7001) | LF | 1,500 | $30.00 | $15.00 | $15.00 | $30.00 |
| 6 | Metal beam guard fence trans (thrie-beam) (540-7005) | EACH | 1 | $1,250.00 | $450.00 | $1,500.00 | $1,500.00 |
| 7 | Remove metal beam guard fence (542-7001) | LF | 2,000 | $3.00 | $3.00 | $0.01 | $2.50 |
| 8 | RM metal beam guard fence trans (thrie-beam) (542-7004) | EACH | 1 | $100.00 | $1.00 | $1.00 | $250.00 |
| 9 | Guardrail end treatment (install) (544-7001) | EACH | 4 | $3,105.00 | $2,800.00 | $2,500.00 | $3,000.00 |
| 10 | Guardrail end treatment (remove) (544-7003) | EACH | 4 | $150.00 | $100.00 | $100.00 | $1.00 |
| 11 | Crash cushion attenuator (remove) (545-7004) | EACH | 4 | $2,160.00 | $500.00 | $1,000.00 | $1,000.00 |
| 12 | Crash cushion attenuator (install)(L)(N)(TL3) (545-7006) | EACH | 4 | $25,000 | $25,500 | $30,000 | $32,500 |
| 13 | Install delineator assembly (D-SW)SZ 1(BRF)GF2(BI) (658-7019) | EACH | 2 | $35.00 | $10.00 | $100.00 | $25.00 |
| 14 | Replace rail element (W-beam) (770-7001) | LF | 500 | $37.50 | $30.00 | $80.00 | $40.00 |
| 15 | Replace timber post W/O concrete FND (770-7006) | EACH | 15 | $70.00 | $50.00 | $60.00 | $75.00 |
| 16 | Replace steel post W/O concrete FND (770-7007) | EACH | 15 | $1.00 | $1.00 | $50.00 | $1.00 |
| 17 | Replace timber post W/ concrete FND (770-7008) | EACH | 75 | $75.00 | $65.00 | $100.00 | $40.00 |
| 18 | Replace steel post W/ concrete FND (770-7009) | EACH | 75 | $1.00 | $1.00 | $1.00 | $1.00 |
| 19 | Rem obsolete get & repl W/ SGT (770-7013) | EACH | 5 | $6,000.00 | $3,000.00 | $6,000.00 | $6,500.00 |
| 20 | Repl single gdrail terminal impact head (770-7015) | EACH | 1 | $750.00 | $1.00 | $2,000.00 | $800.00 |
| 21 | Replace single gdrail terminal rail (770-7016) | LF | 500 | $45.00 | $50.00 | $20.00 | $10.00 |
| 22 | Replace single gdrail terminal post (770-7017) | EACH | 15 | $150.00 | $100.00 | $800.00 | $250.00 |
| 23 | Replace blockout (770-7018) | EACH | 75 | $25.00 | $25.00 | $50.00 | $20.00 |
| 24 | Reset SGT impact head (770-7020) | EACH | 1 | $200.00 | $100.00 | $200.00 | $500.00 |
| 25 | Replace downstream anchor terminal (770-7026) | EACH | 1 | $1,000.00 | $800.00 | $1,250.00 | $1,750.00 |
| 26 | Remove (wide tracc) (774-7050) | EACH | 1 | $3,500.00 | $100.00 | $100.00 | $1,000.00 |
| 27 | Replace (wide tracc) (774-7051) | EACH | 1 | $3,500.00 | $2,500.00 | $100.00 | $30,000 |
| 28 | Repair (wide tracc bay) (774-7054) | EACH | 30 | $50.00 | $50.00 | $250.00 | $2,000.00 |
| 29 | Repair (quad)(N)(M) (774-7073) | LF | 5 | $500.00 | $300.00 | $1,500.00 | $2,000.00 |
| 30 | Repair (T101RC) (776-7008) | LF | 8 | $60.00 | $40.00 | $100.00 | $50.00 |
| 31 | Concrete rail repair (in-kind) (778-7001) | LF | 25 | $50.00 | $75.00 | $100.00 | $50.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of July 23, 2025. Compiled by Mirage Metrics.