TxDOT contract A00218379 bid tabulation
SWEEPING AND DEBRIS REMOVAL, IH0030 (VARIOUS LOCATIONS WITHIN to WEST DALLAS COUNTY MAINTENANCE SECTION). Let by Texas DOT on December 10, 2025, Dallas, Dallas District. 4 bids received; low bid $858,725 by Professional Traffic Control LLC, -13% against the engineer's estimate of $985,175.
- Owner
- Texas DOT
- Letting
- 10 DEC 2025
- Pay items
- 14
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Professional Traffic Control LLC | $858,725 | Low | -13% |
| 2 | UMD Construction | $950,820 | +11% | -3.0% |
| 3 | Sweeping Corporation of America, LLC | $1,073,131 | +25% | +9.0% |
| 4 | Fireman Excavating, Inc. | $1,201,039 | +40% | +22% |
Engineer's estimate: $985,175.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Professional Traffic Control LLC | 2. UMD Construction | 3. Sweeping Corporation of America, LLC | 4. Fireman Excavating, Inc. |
|---|---|---|---|---|---|---|---|---|
| 1 | Mobilization (callout) (500-7002) | EACH | 13 | $4,000.00 | $4,400.00 | $4,000.00 | $25,000 | $1.00 |
| 2 | TMA (mobile operation) (505-7003) | DAY | 276 | $250.00 | $450.00 | $600.00 | $700.00 | $1.00 |
| 3 | Debris removal (CNTR medians/mainlanes) (735-7003) | MI | 1,915 | $55.00 | $65.00 | $80.00 | $59.00 | $150.00 |
| 4 | Debris removal (frontage roads) (735-7025) | MI | 867 | $100.00 | $35.00 | $70.00 | $59.00 | $150.00 |
| 5 | Debris removal (entrance/exit ramps) (735-7037) | MI | 564 | $85.00 | $55.00 | $70.00 | $59.00 | $150.00 |
| 6 | Debris removal (direct connector) (735-7049) | MI | 407 | $100.00 | $75.00 | $70.00 | $59.00 | $150.00 |
| 7 | Debris removal (spot debris) (735-7072) | MI | 200 | $90.00 | $120.00 | $70.00 | $40.00 | $120.00 |
| 8 | Cleaning / sweeping (center median) (738-7001) | MI | 958 | $150.00 | $135.00 | $100.00 | $99.00 | $175.00 |
| 9 | Cleaning / sweeping (outside main lane) (738-7025) | MI | 958 | $135.00 | $135.00 | $120.00 | $99.00 | $175.00 |
| 10 | Cleaning / sweeping (frontage road) (738-7049) | MI | 200 | $185.00 | $135.00 | $120.00 | $99.00 | $175.00 |
| 11 | Cleaning / sweeping(entrance/exit ramp) (738-7070) | MI | 564 | $185.00 | $100.00 | $120.00 | $99.00 | $175.00 |
| 12 | Cleaning / sweeping (direct connector) (738-7091) | MI | 416 | $165.00 | $150.00 | $120.00 | $99.00 | $175.00 |
| 13 | Cleaning / sweeping (spot) (738-7104) | MI | 100 | $75.00 | $175.00 | $100.00 | $40.00 | $120.00 |
| 14 | Cleaning / sweeping (handwork) (738-7105) | SY | 15,000 | $5.00 | $1.00 | $5.00 | $1.00 | $4.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of December 10, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.