UMD Construction: TxDOT bid record

UMD Construction submitted 18 bids on Texas DOT contracts in the data, from 10 JUN 2025 to 29 DEC 2025, and was the low bidder on 5 of them (28%). When it was not low, its total sat a median +19% above the low bid.

Owner
Texas DOT
Low bid volume
$1,665,536
Latest bid
29 DEC 2025
Data through
19 NOV 2026
18Bids
5Low bids
28Win rate, percent
+19%Median gap to the low bid when not low, 13 bids

By year

YearBidsLow bidsWin rate
202518528%
UMD Construction, TxDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
Waco District4250%
Fort Worth District3133%
Bryan District200%
Tyler District200%
Houston District2150%
Paris District2150%
Dallas District200%
Yoakum District100%
UMD Construction, TxDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Mobilization (callout)500-7002EACH175 (29%)$4,000.00$688.00
Cleaning / sweeping (aggregate removal)738-7103MI55 (100%)$100.00$150.00
Cleaning / sweeping (spot)738-7104MI74 (57%)$100.00$200.00
Cleaning / sweeping (outside main lane)738-7025MI64 (67%)$100.00$247.75
Cleaning / sweeping (center median)738-7001MI64 (67%)$100.00$225.00
Cleaning / sweeping (frontage road)738-7049MI64 (67%)$100.00$200.00
Cleaning / sweeping(entrance/exit ramp)738-7070MI64 (67%)$100.00$199.50
TMA (stationary)505-7001DAY51 (20%)$500.00$230.00
TMA (mobile operation)505-7002HR51 (20%)$220.00$78.00
UMD Construction, TxDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

UMD Construction, TxDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
29 DEC 2025A00213865Yoakum DistrictTREE TRIMMING AND BRUSH REMOVAL, IH0010 (District Wide to .)7 of 8$616,500+53%
18 DEC 2025A00217676Paris DistrictPOTHOLE REPAIR, US0075 (Various locations in to Grayson County)1 of 4$379,000Low, 1.0% under the second
18 DEC 2025A00218257Paris DistrictCLEANING AND SWEEPING HIGHWAYS, US0075 (Various locations in to Grayson County)2 of 2$380,200+19%
17 DEC 2025A00217950Waco DistrictSWEEPING AND DEBRIS REMOVAL, SL0396 (Various locations to in McLennan County)1 of 2$422,807Low, 42% under the second
17 DEC 2025A00217951Waco DistrictSWEEPING AND DEBRIS REMOVAL, SH0022 (Various locations to In Hill, Limestone, and Falls county)1 of 3$79,160Low, 6.0% under the second
17 DEC 2025A00218029Waco DistrictSWEEPING AND DEBRIS REMOVAL, US0084 (VARIOUS ROADWAYS to ACROSS BOSQUE, CORYELL AND HAMILTON CO.)2 of 3$169,223+6.0%
17 DEC 2025A00213956Waco DistrictCLEANING AND SWEEPING HIGHWAYS, SH0036 (VARIOUS ROADWAYS to ACROSS BELL COUNTY)2 of 3$420,144+11%
17 DEC 2025A00218364Fort Worth DistrictDELINEATOR INSTALLATION, IH0020 (Various Locations in to South Tarrant County)5 of 9$223,430+24%
10 DEC 2025A00218378Dallas DistrictSWEEPING AND DEBRIS REMOVAL, IH0030 (VARIOUS LOCATIONS WITHIN to EAST DALLAS COUNTY MAINTENANCE SECTION)2 of 4$648,940+16%
10 DEC 2025A00218379Dallas DistrictSWEEPING AND DEBRIS REMOVAL, IH0030 (VARIOUS LOCATIONS WITHIN to WEST DALLAS COUNTY MAINTENANCE SECTION)2 of 4$950,820+11%
09 DEC 2025A00206051Tyler DistrictMOWING HIGHWAY RIGHT OF WAY, US0069 (Various roadways in to Cherokee County.)3 of 8$794,926+19%
09 DEC 2025A00217481Bryan DistrictMOWING HIGHWAY RIGHT OF WAY, SH0006 (Various to Various)2 of 4$362,344+16%
09 DEC 2025A00217588Houston DistrictMOWING HIGHWAY RIGHT OF WAY, SH0087 (VARIOUS HWYS IN GALVESTON COUNTY to VARIOUS HWYS IN GALVESTON COUNTY)1 of 4$289,075Low, 23% under the second
09 DEC 2025A00213891Houston DistrictDRAINAGE SYSTEM CLEANING, IH0045 (Various Highways in Montgomery County to Various Highways in Montgomery County)5 of 5$602,000+76%
09 DEC 2025A00218097Tyler DistrictMOWING HIGHWAY RIGHT OF WAY, US0079 (Various Roadways in to Anderson County.)3 of 9$781,381+12%
19 NOV 2025A00216531Fort Worth DistrictTREE TRIMMING AND BRUSH REMOVAL, SH0114 (Various location in to Jack and Wise)1 of 6$495,494Low, 27% under the second
19 NOV 2025A00217264Fort Worth DistrictTREE TRIMMING AND BRUSH REMOVAL, US0377 (VARIOUS LOCATIONS IN to Hood, Erath and Somervell)9 of 11$339,450+67%
10 JUN 2025A00215749Bryan DistrictTREE REMOVAL, SH0075 (Various to Various)8 of 9$249,675+42%
UMD Construction: latest TxDOT bids in the data

How this record was read

TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

  • Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy