K & R Contractors: TxDOT bid record
K & R Contractors submitted 28 bids on Texas DOT contracts in the data, from 07 OCT 2020 to 23 SEP 2026, and was the low bidder on 8 of them (29%). When it was not low, its total sat a median +11% above the low bid.
- Owner
- Texas DOT
- Low bid volume
- $1,764,515
- Latest bid
- 23 SEP 2026
- Data through
- 19 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 1 | 1 | 100% |
| 2021 | 4 | 0 | 0% |
| 2022 | 1 | 1 | 100% |
| 2023 | 1 | 0 | 0% |
| 2024 | 1 | 0 | 0% |
| 2025 | 14 | 3 | 21% |
| 2026 | 6 | 3 | 50% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| Lufkin District | 22 | 8 | 36% |
| Bryan District | 3 | 0 | 0% |
| Tyler District | 1 | 0 | 0% |
| Beaumont District | 1 | 0 | 0% |
| Yoakum District | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Mobilization (callout) | 500-7002 | EACH | 26 | 23 (88%) | $50.00 | $688.00 |
| Tree removal (36" - 42" diameter) | 752-7010 | EACH | 27 | 15 (56%) | $200.00 | $500.00 |
| Tree removal (42" - 48" diameter) | 752-7011 | EACH | 26 | 15 (58%) | $250.00 | $550.00 |
| Tree removal (48" - 60" diameter) | 752-7012 | EACH | 23 | 13 (57%) | $200.00 | $575.00 |
| Tree removal (4" - 12" diameter) | 752-7005 | EACH | 28 | 10 (36%) | $50.00 | $150.00 |
| Tree removal (12" - 18" diameter) | 752-7006 | EACH | 28 | 9 (32%) | $75.00 | $193.43 |
| Tree trimming / brush removal(channels) | 752-7003 | ACRE | 14 | 9 (64%) | $500.00 | $2,500.00 |
| Tree removal (18" - 24" diameter) | 752-7007 | EACH | 28 | 8 (29%) | $100.00 | $250.00 |
| Tree removal (60" - 72" diameter) | 752-7013 | EACH | 17 | 8 (47%) | $500.00 | $700.00 |
| Tree removal (30" - 36" diameter) | 752-7009 | EACH | 28 | 7 (25%) | $200.00 | $500.00 |
| TMA (stationary) | 505-7001 | DAY | 26 | 5 (19%) | $400.00 | $230.00 |
| Tree trimming / brush removal | 752-7001 | MI | 21 | 2 (10%) | $2,500.00 | $2,300.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Ace Contractors, Inc. | 18 | 8 of 18 |
| Austin Barricade Company, L.L.C. | 10 | 5 of 10 |
| Rhino Equity, LLC | 9 | 2 of 9 |
| ArborTrue LLC | 7 | 0 of 7 |
| Looks Great Services of MS, Inc. | 7 | 0 of 7 |
| Drewery Construction Company, Incorporated | 6 | 0 of 6 |
| Cross Plus Construction, LLC | 6 | 1 of 6 |
| Western Certified Arborists | 6 | 1 of 6 |
| Cehand Services LLC | 5 | 2 of 5 |
| Road Solutions L.L.C. | 4 | 2 of 4 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 23 SEP 2026 | A00222474 | Lufkin District | TREE REMOVAL, US0059 (NACOGDOCHES, SHELBY, SAN AUGUSTINE to VARIOUS LOCATIONS) | 2 of 3 | $686,750 | +3.0% |
| 12 AUG 2026 | A00222416 | Lufkin District | TREE TRIMMING AND BRUSH REMOVAL, US0059 (Polk County to VARIOUS LOCATIONS) | 1 of 6 | $205,805 | Low, 7.0% under the second |
| 12 AUG 2026 | A00222372 | Lufkin District | TREE REMOVAL, US0059 (SHELBY COUNTY to VARIOUS LOCATIONS) | 2 of 4 | $147,325 | +19% |
| 23 JUL 2026 | A00217692 | Lufkin District | TREE TRIMMING AND BRUSH REMOVAL, US0059 (Angelina County to VARIOUS LOCATIONS) | 2 of 7 | $139,125 | +4.0% |
| 08 JUL 2026 | A00220146 | Lufkin District | TREE TRIMMING AND BRUSH REMOVAL, US0059 (Nacogdoches County to VARIOUS LOCATIONS) | 1 of 7 | $316,975 | Low, 2.0% under the second |
| 09 APR 2026 | A00217682 | Lufkin District | TREE TRIMMING AND BRUSH REMOVAL, US0059 (San Jacinto County to Various Locations) | 1 of 3 | $115,750 | Low, 9.0% under the second |
| 29 DEC 2025 | A00213865 | Yoakum District | TREE TRIMMING AND BRUSH REMOVAL, IH0010 (District Wide to .) | 6 of 8 | $577,150 | +43% |
| 17 SEP 2025 | A00216418 | Lufkin District | TREE TRIMMING AND BRUSH REMOVAL, US0059 (Nacogdoches County to VARIOUS LOCATIONS) | 1 of 4 | $315,375 | Low, 6.0% under the second |
| 26 AUG 2025 | A00216386 | Lufkin District | TREE TRIMMING AND BRUSH REMOVAL, US0059 (Polk County to VARIOUS LOCATIONS) | 1 of 9 | $192,250 | Low, 1.0% under the second |
| 26 AUG 2025 | A00216460 | Lufkin District | TREE TRIMMING AND BRUSH REMOVAL, US0059 (Angelina County to VARIOUS LOCATIONS) | 2 of 7 | $206,000 | +11% |
| 20 AUG 2025 | A00216459 | Lufkin District | TREE REMOVAL, SH0103 (SAN AUG COUNTY MAINTENANCE SECTION to VARIOUS LOCATIONS) | 1 of 4 | $177,510 | Low, 1.0% under the second |
| 13 AUG 2025 | A00216379 | Lufkin District | TREE REMOVAL, US0059 (SHELBY COUNTY to VARIOUS LOCATIONS) | 3 of 7 | $199,750 | +12% |
| 14 JUL 2025 | A00215824 | Bryan District | TREE REMOVAL, SH0075 (Various to Various) | 2 of 7 | $184,875 | +1.0% |
| 10 JUN 2025 | A00215749 | Bryan District | TREE REMOVAL, SH0075 (Various to Various) | 4 of 9 | $192,000 | +9.0% |
| 13 MAY 2025 | A00214608 | Tyler District | TREE REMOVAL, US0069 (Various Locations within to Smith County) | 4 of 10 | $680,375 | +14% |
| 30 APR 2025 | A00215090 | Lufkin District | TREE TRIMMING AND BRUSH REMOVAL, SH0021 (SABINE COUNTY to VARIOUS LOCATIONS) | 4 of 6 | $389,000 | +30% |
| 16 APR 2025 | A00213645 | Lufkin District | TREE TRIMMING AND BRUSH REMOVAL, US0059 (San Jacinto County to Various Locations) | 2 of 6 | $117,625 | +13% |
| 19 FEB 2025 | A00212576 | Lufkin District | TREE REMOVAL, US0059 (Polk County to VARIOUS LOCATIONS) | 2 of 8 | $152,500 | +16% |
| 19 FEB 2025 | A00213616 | Lufkin District | TREE TRIMMING AND BRUSH REMOVAL, US0059 (Nacogdoches County to VARIOUS LOCATIONS) | 4 of 6 | $316,000 | +24% |
| 11 FEB 2025 | A00213828 | Beaumont District | TREE TRIMMING AND BRUSH REMOVAL, US0090 (Liberty County to Chambers County) | 4 of 8 | $233,125 | +7.0% |
| 12 JUN 2024 | 06241707 | Bryan District | SH0075 Tree removal from VARIOUS to VARIOUS | 2 of 2 | $206,250 | +2.0% |
| 22 MAR 2023 | 03231104 | Lufkin District | SH0021 Tree trimming and brush removal from SABINE COUNTY to VARIOUS LOCATIONS | 4 of 5 | $279,250 | +21% |
| 09 NOV 2022 | 11221101 | Lufkin District | SH0103 Tree & brush removal from SAN AUG COUNTY MAINTENANCE SECTION to VARIOUS LOCATIONS | 1 of 5 | $218,700 | Low, 2.0% under the second |
| 13 OCT 2021 | 10211101 | Lufkin District | US0287 Tree trimming and brush removal from HOUSTON COUNTY to VARIOUS LOCATIONS | 4 of 8 | $269,300 | +9.0% |
| 13 OCT 2021 | 10211102 | Lufkin District | SH0021 Tree trimming and brush removal from SABINE COUNTY to VARIOUS LOCATIONS | 2 of 5 | $250,225 | +1.0% |
How this record was read
TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.