TxDOT letting results, November 9, 2022
4 contracts let by Texas DOT on November 9, 2022, $546,765 in low bids, a median of 3 bidders per contract. On the 4 with an engineer's estimate, the low bid came in under it 2 times; median low bid -2.0% against the estimate.
- Owner
- Texas DOT
- Contracts
- 4
- Low bids, total
- $546,765
- Data through
- 19 NOV 2026
Contracts let that day
| Contract | Project | District | Bids | Low bidder | Low bid | Second bid | Gap | Against estimate | Source |
|---|---|---|---|---|---|---|---|---|---|
| 11221101 | SH0103 Tree & brush removal from SAN AUG COUNTY MAINTENANCE SECTION to VARIOUS LOCATIONS | Lufkin District | 5 | K & R Contractors | $218,700 | $222,400 | +2.0% | -17% | TxDOT |
| 11221716 | SH0006 Aggregate from VARIOUS to VARIOUS | Bryan District | 3 | Touchstone Resources, LLC | $137,500 | $138,000 | 0.0% | +2.0% | TxDOT |
| 11221708 | SH0006 Cutback from VARIOUS to VARIOUS | Bryan District | 3 | Martin Resource Management Corporation | $135,120 | $161,520 | +20% | -6.0% | TxDOT |
| 11221712 | IH0045 Asphaltic patching material from VARIOUS to VARIOUS | Bryan District | 1 | Waller County Asphalt Inc. | $55,445 | +11% | TxDOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than TxDOT received, the others did not match their published totals and are left out.