TxDOT contract A00224318 bid tabulation
TRAFFIC CONTROL SERVICES, IH0027 (VARIOUS LOCATIONS to VARIOUS LOCATIONS). Let by Texas DOT on November 5, 2026, Hale, Lubbock District. 3 bids received; low bid $182,004 by FC Traffic Control, Inc., -63% against the engineer's estimate of $497,875.
- Owner
- Texas DOT
- Letting
- 05 NOV 2026
- Pay items
- 22
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | FC Traffic Control, Inc. | $182,004 | Low | -63% |
| 2 | Austin Barricade Company, L.L.C. | $326,215 | +79% | -34% |
| 3 | Awp Safety | $375,325 | +106% | -25% |
Engineer's estimate: $497,875.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. FC Traffic Control, Inc. | 2. Austin Barricade Company, L.L.C. | 3. Awp Safety |
|---|---|---|---|---|---|---|---|
| 1 | Portable changeable message sign (503-7001) | DAY | 10 | $200.00 | $1.00 | $250.00 | $200.00 |
| 2 | TMA (stationary) (505-7001) | DAY | 125 | $1,000.00 | $1,000.00 | $1,400.00 | $1,100.00 |
| 3 | TMA (mobile operation) (505-7002) | HR | 400 | $175.00 | $140.00 | $200.00 | $150.00 |
| 4 | Lane closure(setup & rem)(typ 1) (790-7001) | EACH | 25 | $450.00 | $1.00 | $1.00 | $450.00 |
| 5 | Lane closure(setup & rem)(typ 2) (790-7002) | EACH | 25 | $450.00 | $1.00 | $1.00 | $450.00 |
| 6 | Lane closure(setup & rem)(typ 5) (790-7005) | EACH | 25 | $500.00 | $1.00 | $100.00 | $475.00 |
| 7 | Lane closure(setup & rem)(typ 7) (790-7007) | EACH | 15 | $1,000.00 | $1.00 | $1.00 | $900.00 |
| 8 | Lane closure(setup & rem)(typ 11) (790-7011) | EACH | 10 | $475.00 | $1.00 | $500.00 | $475.00 |
| 9 | Lane closure(setup & rem)(typ 13) (790-7013) | EACH | 4 | $1,500.00 | $1.00 | $500.00 | $1,550.00 |
| 10 | Lane closure(setup & rem)(typ 14) (790-7014) | EACH | 5 | $475.00 | $1.00 | $500.00 | $475.00 |
| 11 | Lane closure(setup & rem)(typ 18) (790-7018) | EACH | 10 | $450.00 | $1.00 | $500.00 | $450.00 |
| 12 | Lane closure(maintenance)(typ 1) (790-7020) | HR | 200 | $225.00 | $1.00 | $50.00 | $120.00 |
| 13 | Lane closure(maintenance)(typ 2) (790-7021) | HR | 200 | $225.00 | $1.00 | $50.00 | $120.00 |
| 14 | Lane closure(maintenance)(typ 5) (790-7024) | HR | 200 | $235.00 | $1.00 | $50.00 | $120.00 |
| 15 | Lane closure(maintenance)(typ 7) (790-7026) | HR | 50 | $325.00 | $1.00 | $50.00 | $185.00 |
| 16 | Lane closure(maintenance)(typ 11) (790-7030) | HR | 25 | $230.00 | $1.00 | $50.00 | $140.00 |
| 17 | Lane closure(maintenance)(typ 13) (790-7032) | HR | 25 | $350.00 | $1.00 | $50.00 | $210.00 |
| 18 | Lane closure(maintenance)(typ 14) (790-7033) | HR | 25 | $230.00 | $1.00 | $50.00 | $120.00 |
| 19 | Lane closure(maintenance)(typ 18) (790-7037) | HR | 25 | $230.00 | $1.00 | $50.00 | $120.00 |
| 20 | Additional lane closure item(type 20) (790-7058) | HR | 25 | $85.00 | $1.00 | $250.00 | $45.00 |
| 21 | Additional lane closure item(type 21) (790-7059) | HR | 25 | $125.00 | $1.00 | $250.00 | $70.00 |
| 22 | Maintenance speed limit signing (7010-7001) | EACH | 75 | $650.00 | $1.00 | $22.00 | $150.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of November 5, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.