Russell Standard Corporation: VDOT bid record
Russell Standard Corporation submitted 42 bids on Virginia DOT contracts in the data, from 18 NOV 2003 to 28 OCT 2026, and was the low bidder on 24 of them (57%). When it was not low, its total sat a median +6.0% above the low bid.
- Owner
- Virginia DOT
- Low bid volume
- $27,088,567
- Latest bid
- 28 OCT 2026
- Data through
- 28 OCT 2026
VDOT's 2002 to 2021 workbooks list only the three lowest bids on each contract, so a firm's bids that ranked fourth or lower in those years are missing: bid counts are understated and win rates overstated for those years.
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2003 | 3 | 1 | 33% |
| 2004 | 2 | 2 | 100% |
| 2005 | 3 | 2 | 67% |
| 2006 | 3 | 1 | 33% |
| 2008 | 2 | 2 | 100% |
| 2009 | 2 | 0 | 0% |
| 2010 | 7 | 4 | 57% |
| 2011 | 1 | 0 | 0% |
| 2012 | 1 | 0 | 0% |
| 2013 | 1 | 0 | 0% |
| 2014 | 1 | 1 | 100% |
| 2015 | 1 | 0 | 0% |
| 2016 | 3 | 2 | 67% |
| 2017 | 2 | 2 | 100% |
| 2018 | 4 | 2 | 50% |
| 2019 | 1 | 0 | 0% |
| 2020 | 2 | 2 | 100% |
| 2021 | 1 | 1 | 100% |
| 2025 | 1 | 1 | 100% |
| 2026 | 1 | 1 | 100% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| Staunton | 36 | 21 | 58% |
| Culpeper | 4 | 1 | 25% |
| Northern Virginia | 1 | 1 | 100% |
| Fredericksburg | 1 | 1 | 100% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Type A PVMT line MRKG 4" | 704SD20-0001 | LF | 30 | 20 (67%) | $0.20 | $0.24 |
| Modified single seal | 314SP20-0013 | SY | 31 | 15 (48%) | $1.00 | $1.12 |
| Type B class I PVMT line MRKG 24" | 704SD20-0010 | LF | 16 | 10 (63%) | $12.32 | $7.50 |
| Temp. PVMT MRKG TY. A, 4" | 512SD20-0046 | LF | 11 | 10 (91%) | $0.08 | $0.12 |
| Temp. PVMT. symb. MRKG R/R crossing TY. A | 512SD20-0053 | EACH | 10 | 9 (90%) | $467.50 | $455.00 |
| Modified double seal | 314SP20-0014 | SY | 16 | 8 (50%) | $1.65 | $1.82 |
| Eradicate exist. nonlinear PVMT MRKG | 54106 | SF | 8 | 6 (75%) | $4.65 | $5.95 |
| Temp. PVMT MRKG TY. A, 12" | 512SD20-0049 | LF | 6 | 6 (100%) | $1.95 | $2.00 |
| Pave. message mark. R/R crossing | 54404 | EACH | 8 | 5 (63%) | $1,160.00 | $926.33 |
| Type A PVMT line MRKG 24" | 704SD20-0005 | LF | 6 | 5 (83%) | $4.00 | $4.42 |
| Pave. message mark. R/R crossing | 54404 | EACH | 6 | 5 (83%) | $727.00 | $660.00 |
| Temp. PVMT MRKG TY. A, 24" | 512SD20-0050 | LF | 5 | 4 (80%) | $4.90 | $3.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Whitehurst Paving Company, Incorporated | 35 | 15 of 35 |
| Payne Paving Company, Incorporated | 5 | 1 of 5 |
| Slurry Pavers, Inc. | 2 | 1 of 2 |
| Adams Construction Company | 1 | 1 of 1 |
| W-L Construction & Paving, Inc. | 1 | 0 of 1 |
| Pavcon Group, Inc. | 1 | 0 of 1 |
| Boxley Materials Company | 1 | 1 of 1 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 28 OCT 2026 | CM827STA129817 | Staunton | 2027 surface treatment - secondary | 1 of 2 | $1,669,788 | Low, 11% under the second |
| 22 OCT 2025 | CM826STA127378 | Staunton | 2026 surface treatment - secondary | 1 of 2 | $1,394,620 | Low, 0.0% under the second |
| 17 NOV 2021 | CM822STC119964 | Staunton | 2022 surface treatment | 1 of 2 | $893,970 | Low, 9.0% under the second |
| 16 DEC 2020 | CM821STB117692 | Staunton | 2021 surface treatment | 1 of 2 | $1,186,271 | Low, 8.0% under the second |
| 22 JAN 2020 | CM820STC115332 | Staunton | 2020 surface treatment | 1 of 2 | $732,331 | Low, 14% under the second |
| 18 DEC 2019 | CM820STB115331 | Staunton | 2020 surface treatment | 2 of 2 | $1,226,502 | +5.0% |
| 19 DEC 2018 | CM819STC113664 | Staunton | 2019 surface treatment | 2 of 2 | $1,112,894 | +4.0% |
| 14 NOV 2018 | CM819SSB113662 | Staunton | 2019 slurry seal | 3 of 3 | $767,852 | +9.0% |
| 14 NOV 2018 | CM819STB113665 | Staunton | 2019 surface treatment | 1 of 2 | $718,951 | Low, 2.0% under the second |
| 28 FEB 2018 | CST8A800112402 | Staunton | 2018 surface treatment | 1 of 2 | $865,923 | Low, 12% under the second |
| 25 OCT 2017 | CST8C800110682 | Staunton | 2018 surface treatment | 1 of 2 | $2,497,835 | Low, 4.0% under the second |
| 24 MAY 2017 | CST8A700110681 | Staunton | 2017 surface treatment | 1 of 2 | $799,014 | Low, 3.0% under the second |
| 16 NOV 2016 | CM717STA109028 | Culpeper | 2017 surface treatment (volume 1 of 2) | 2 of 2 | $3,363,324 | +18% |
| 16 NOV 2016 | CST8B600108779 | Staunton | 2017 surface treatment (volume 1 of 2) | 1 of 3 | $894,891 | Low, 4.0% under the second |
| 16 NOV 2016 | CST8E600108780 | Staunton | 2017 surface treatment (volume 1 of 2) | 1 of 2 | $1,769,821 | Low, 4.0% under the second |
| 18 NOV 2015 | CST8D600105928 | Staunton | Surface treatment (volume 1 of 2) | 2 of 2 | $1,048,326 | +2.0% |
| 19 NOV 2014 | CST8C500105927 | Staunton | Surface treatment clarke, frederick, & shenandoah counties | 1 of 3 | $517,856 | Low, 6.0% under the second |
| 20 NOV 2013 | CM814STC104503 | Staunton | Surface treatment - clarke, frederick and shenandoah | 2 of 2 | $552,776 | 0.0% |
| 21 NOV 2012 | CM13ST8C103179 | Staunton | Stp-pm08(340)(nfo)st8c-968-f13,n501 | 2 of 2 | $649,781 | +7.0% |
| 16 NOV 2011 | CM812STC99343 | Culpeper | Surface treatment schedule (clarke, shenandoah, warren) | 2 of 2 | $274,896 | -3.0% |
| 15 DEC 2010 | C00097481N01 | Staunton | Nh-pm08(287), (288), (286), & (289)(nfo)lm8a-968-f11. n501 | 1 of 1 | $2,677,588 | Low |
| 15 DEC 2010 | CM011LM6A93385 | Northern Virginia | Lm-6a-11 (latex modified treatment schedule) | 1 of 1 | $2,304,109 | Low |
| 15 DEC 2010 | CM411SSA94187 | Fredericksburg | 2011 slurry/latex modified seal schedule | 1 of 2 | $3,169,924 | Low, -11% under the second |
| 17 NOV 2010 | CM711STB97328 | Staunton | Warrenton residency surface treatment schedule | 1 of 2 | $1,234,942 | Low, -8.0% under the second |
| 17 NOV 2010 | CM810STD93856 | Culpeper | Surface treatment schedule st-8d-11 | 2 of 2 | $1,044,625 | -3.0% |
How this record was read
VDOT bid tabulation PDFs for October 2025 to October 2026 (all bidders, awarded contracts), and VDOT yearly bid tab workbooks for 2002 to 2021, which list only the three lowest bids on each contract. The workbooks store numbers in single precision, so their bids are checked to within $1 or 0.0001% of the total, whichever is larger.
- Every bid counted here matched its published total to within one dollar; VDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.