Pavcon Group, Inc.: VDOT bid record

Pavcon Group, Inc. submitted 17 bids on Virginia DOT contracts in the data, from 24 FEB 2016 to 04 FEB 2026, and was the low bidder on 6 of them (35%). When it was not low, its total sat a median +5.0% above the low bid.

Owner
Virginia DOT
Low bid volume
$8,849,704
Latest bid
04 FEB 2026
Data through
28 OCT 2026

VDOT's 2002 to 2021 workbooks list only the three lowest bids on each contract, so a firm's bids that ranked fourth or lower in those years are missing: bid counts are understated and win rates overstated for those years.

17Bids
6Low bids
35Win rate, percent
+5.0%Median gap to the low bid when not low, 11 bids

By year

YearBidsLow bidsWin rate
2016200%
2017300%
201822100%
20192150%
20203133%
20214250%
2026100%
Pavcon Group, Inc., VDOT: bids and low bids by year of letting

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Flagger service512SD20-0027HR128 (67%)$35.00$20.00
Asph. conc. TY. SM-12.5A maint315SD20-0032TON126 (50%)$70.87$69.00
Asph. conc. TY. SM-9.5A maint315SD20-0027TON106 (60%)$74.72$69.95
Flex. pave. tie-in planing 0"-2"515SD20-0011SY145 (36%)$5.50$6.44
Agr. base mat. TY.I or II no. 21A or 21B305SP20-0003TON134 (31%)$45.00$33.78
Flexible pave.planing 0"-2"515SD20-0013SY114 (36%)$2.00$1.90
Pave. message mark. school zone54401EACH54 (80%)$825.00$1,000.00
Tack coat310SD20-0001GAL163 (19%)$2.75$2.00
Temp. PVMT MRKG TY. A, 4"512SD20-0046LF123 (25%)$0.14$0.12
Temp. PVMT MRKG TY. A, 12"512SD20-0049LF83 (38%)$3.23$2.00
Asph. conc. TY. SM-12.5D maint315SD20-0034TON73 (43%)$72.80$68.00
Portable temporary rumble strip array512SP20-0001DAY73 (43%)$40.00$140.00
Pavcon Group, Inc., VDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Pavcon Group, Inc., VDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
04 FEB 2026CM826PMD127546Staunton2026 plant mix - primary4 of 4$1,498,508+15%
24 MAR 2021CM821PMS117917Staunton2021 plant mix2 of 3$1,367,752+5.0%
24 FEB 2021CM821PMC117908Staunton2021 plant mix1 of 3$2,694,358Low, 1.0% under the second
24 FEB 2021CM821PMD117909Staunton2021 plant mix1 of 2$1,376,021Low, 4.0% under the second
20 JAN 2021CM821PMG117912Staunton2021 plant mix2 of 2$2,006,682+1.0%
25 MAR 2020CM820PMB115316Staunton2020 plant mix2 of 3$2,431,637+10%
25 MAR 2020CM820PMS115323Staunton2020 plant mix1 of 3$1,131,724Low, 5.0% under the second
26 FEB 2020CM820PMG115319Staunton2020 plant mix2 of 2$2,899,970+9.0%
27 FEB 2019CM819PMX112397Staunton2019 plant mix2 of 2$1,222,055+8.0%
23 JAN 2019CM819PMG113673Staunton2019 plant mix1 of 2$1,234,084Low, 3.0% under the second
28 FEB 2018CPM8X800112398Staunton2018 plant mix1 of 3$902,422Low, 9.0% under the second
14 FEB 2018CPM8Y800111866Staunton2018 plant mix1 of 3$1,511,095Low, 12% under the second
22 FEB 2017CM817PMK107826Staunton2017 plant mix2 of 2$1,689,648+14%
22 FEB 2017CM817PMW107828Staunton2017 plant mix2 of 3$1,141,528+1.0%
25 JAN 2017CM817PMB108432Staunton2017 plant mix2 of 3$1,115,052+5.0%
16 NOV 2016CST8B600108779Staunton2017 surface treatment (volume 1 of 2)2 of 3$934,209+4.0%
24 FEB 2016CPM8Y600105276Staunton2016 plant mix (volume 1 of 2)3 of 3$452,639+4.0%
Pavcon Group, Inc.: latest VDOT bids in the data

How this record was read

VDOT bid tabulation PDFs for October 2025 to October 2026 (all bidders, awarded contracts), and VDOT yearly bid tab workbooks for 2002 to 2021, which list only the three lowest bids on each contract. The workbooks store numbers in single precision, so their bids are checked to within $1 or 0.0001% of the total, whichever is larger.

  • Every bid counted here matched its published total to within one dollar; VDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy