VDOT contract C0000120443M01 bid tabulation
Cctv camera installation. Let by Virginia DOT on October 22, 2025, Chesterfield, Dinwiddie, Henrico, Mecklenburg, Richmond. 3 bids received; low bid $3,706,827 by Richardson-Wayland-Ferreira, LLC.
- Owner
- Virginia DOT
- Letting
- 22 OCT 2025
- Pay items
- 48
- Data through
- 28 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Richardson-Wayland-Ferreira, LLC | $3,706,827 | Low |
| 2 | Lumin8 Transportation Technologies, LLC | $3,934,924 | +6.0% |
| 3 | VSL Electrical, Signing, Lighting LLC | $4,333,177 | +17% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Richardson-Wayland-Ferreira, LLC | 2. Lumin8 Transportation Technologies, LLC | 3. VSL Electrical, Signing, Lighting LLC |
|---|---|---|---|---|---|---|
| 0001-0010 | Clearing and grubbing (301SD20-0002) | ACRE | 8.90 | $32,000 | $19,927 | $57,000 |
| 0001-0020 | Regular excavation (303SD20-0001) | CY | 17.20 | $482.46 | $120.00 | $1,090.00 |
| 0001-0030 | Check dam rock TY. II (303SD20-0023) | EACH | 10 | $3,062.47 | $943.00 | $1,500.00 |
| 0001-0040 | Temp. silt fence type A (303SD20-0034) | LF | 17,429 | $2.71 | $9.30 | $10.65 |
| 0001-0050 | Utility test pit unpaved reconstruct utility (303SX20-0012) | EACH | 14 | $855.00 | $743.00 | $1,106.00 |
| 0001-0060 | Aggr. matl. no. 25 or 26 (305SD20-0011) | TON | 25.80 | $252.23 | $295.00 | $732.00 |
| 0001-0070 | Concrete class A3 misc. (504SD20-0001) | CY | 7.14 | $965.52 | $755.00 | $7,303.00 |
| 0001-0080 | Handrail HR-1 type II (504SD20-0014) | LF | 40 | $714.61 | $166.00 | $565.90 |
| 0001-0090 | NS remove exist. remove existing electrical service (510SX20-0040) | EACH | 1 | $1,833.37 | $1,454.00 | $2,845.00 |
| 0001-0100 | Truck mounted attenuator (512SD20-0023) | HR | 360 | $26.01 | $237.00 | $130.00 |
| 0001-0110 | Group 2 channelizing devices (512SD20-0024) | DAY | 2,250 | $17.19 | $2.00 | $6.90 |
| 0001-0120 | Port.changeable mess. sign (512SD20-0025) | HR | 720 | $10.68 | $49.70 | $22.50 |
| 0001-0130 | Electronic arrow board (512SD20-0026) | HR | 720 | $5.90 | $33.80 | $5.50 |
| 0001-0140 | Mobilization (513SD20-0001) | LS | 1 | $365,000 | $447,658 | $51,600 |
| 0001-0150 | NS envir. protection management of contaminated soil (522SX20-0007) | LS | 1 | $30,154 | $58,119 | $39,205 |
| 0001-0160 | NS envir. protection transportation and disposal of contaminated soil (522SX20-0008) | TON | 28 | $119.79 | $796.00 | $1,187.00 |
| 0001-0170 | Sel tree removal trim and clean (601SD20-0001) | ACRE | 9.50 | $11,500 | $8,635.00 | $56,900 |
| 0001-0180 | Rolled erosion CTRL product EC-2 type 2 (606SD20-0002) | SY | 14,529 | $7.43 | $6.60 | $5.25 |
| 0001-0190 | Conc. found. PF-8 (700SD20-0068) | CY | 70 | $3,236.87 | $4,003.00 | $2,700.00 |
| 0001-0200 | Electrical service SE-4, TY. A (700SD20-0134) | EACH | 3 | $7,958.52 | $8,694.00 | $10,000 |
| 0001-0210 | 6 conductor cable (700SD20-0143) | LF | 9,517 | $5.23 | $1.30 | $4.25 |
| 0001-0220 | 8 conductor cable (700SD20-0144) | LF | 20,071 | $10.51 | $0.90 | $3.50 |
| 0001-0230 | Electrical service work pad (700SD20-0174) | EACH | 12 | $1,563.32 | $2,937.00 | $5,000.00 |
| 0001-0240 | Junction box JB-R1 (700SD20-0175) | EACH | 3 | $7,222.31 | $7,472.00 | $6,000.00 |
| 0001-0250 | Junction box JB-S2 (700SD20-0178) | EACH | 44 | $2,676.10 | $4,367.00 | $2,500.00 |
| 0001-0260 | Junction box JB-S3 (700SD20-0179) | EACH | 41 | $4,088.03 | $4,699.00 | $3,500.00 |
| 0001-0270 | Junction box JB-S4 (700SD20-0180) | EACH | 6 | $6,531.54 | $10,677 | $5,910.00 |
| 0001-0280 | Elect. ser. GRD. electrode 10' (700SD20-0181) | EACH | 70 | $475.63 | $287.00 | $230.00 |
| 0001-0290 | Bored conduit 2" (700SD20-0191) | LF | 1,824 | $94.27 | $53.00 | $67.00 |
| 0001-0300 | Conduit PVC 2" (700SD20-0194) | LF | 7,429 | $4.60 | $8.30 | $3.25 |
| 0001-0310 | Trench excavation eci-1 (700SD20-0197) | LF | 13,002 | $14.34 | $36.50 | $26.25 |
| 0001-0320 | Test bore (700SD20-0199) | EACH | 7 | $4,901.87 | $7,750.00 | $15,000 |
| 0001-0330 | NS conductor cable cat 6 water blocking, shielded, direct buried cable (700SX20-0007) | LF | 995 | $11.78 | $10.20 | $16.00 |
| 0001-0340 | NS traffic signalization modified SE-5 electrical service (700SX20-0010) | EACH | 4 | $20,778 | $3,556.00 | $10,000 |
| 0001-0350 | NS traffic signalization supplement electrical service disconnect (SE-4 or 5) (700SX20-0010) | EACH | 5 | $2,477.68 | $731.00 | $10,000 |
| 0001-0360 | ITS controller cabinet pole mounted (801SD20-0002) | EACH | 7 | $11,402 | $14,922 | $15,000 |
| 0001-0370 | NS communication equip. install CCTV camera (801SX20-0001) | EACH | 9 | $2,833.23 | $461.00 | $2,000.00 |
| 0001-0380 | NS communication equip. install field router (801SX20-0001) | EACH | 7 | $733.33 | $211.00 | $511.00 |
| 0001-0390 | NS communication equip. install SFP module (801SX20-0001) | EACH | 14 | $1,085.49 | $53.00 | $40.00 |
| 0001-0400 | NS communication equip. pre-terminated fiber patch panel (large) (801SX20-0001) | EACH | 7 | $3,098.64 | $1,551.00 | $7,000.00 |
| 0001-0410 | NS communication equip. step-down transformers (3KVA) (801SX20-0001) | EACH | 5 | $2,319.17 | $5,466.00 | $3,000.00 |
| 0001-0420 | NS communication equip. step-UP transformers (3KVA) (801SX20-0001) | EACH | 5 | $2,300.84 | $5,466.00 | $3,000.00 |
| 0001-0430 | Uninterruptible power supply ITS-CC (802SD20-0001) | EACH | 7 | $7,381.22 | $9,861.00 | $10,000 |
| 0001-0440 | CCTV camera pole W/lowering device 80' (803SD20-0011) | EACH | 7 | $59,714 | $69,662 | $81,089 |
| 0001-0450 | Fiber optic drop cable 12 strand (808SD20-0004) | LF | 13,557 | $12.30 | $12.30 | $12.50 |
| 0001-0460 | Bored ITS conduit HDPE 2" (812SD20-0002) | LF | 2,506 | $103.25 | $49.80 | $65.65 |
| 0001-0470 | ITS conduit HDPE 2" (812SD20-0007) | LF | 16,264 | $5.82 | $5.70 | $5.00 |
| 0001-0480 | NS ITS conduit HDPE 3" (812SX20-0008) | LF | 81 | $7.36 | $9.60 | $9.50 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from VDOT's tabulation for this contract. VDOT bid tabulation PDFs for October 2025 to October 2026 (all bidders, awarded contracts), and VDOT yearly bid tab workbooks for 2002 to 2021, which list only the three lowest bids on each contract. The workbooks store numbers in single precision, so their bids are checked to within $1 or 0.0001% of the total, whichever is larger.
Every contract let that day: VDOT letting of October 22, 2025. Compiled by Mirage Metrics.