VDOT contract CM626PME127628 bid tabulation

2026 plant mix - secondary. Let by Virginia DOT on November 19, 2025, Stafford, Fredericksburg. 3 bids received; low bid $3,113,777 by Allan Myers Va, Inc..

Owner
Virginia DOT
Letting
19 NOV 2025
Pay items
36
Data through
28 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Allan Myers Va, Inc.$3,113,777Low
2Superior Paving Corporation$3,221,303+3.0%
3EUROVIA ATLANTIC COAST LLC dba VIRGINIA$4,435,021+42%
VDOT contract CM626PME127628: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Allan Myers Va, Inc.2. Superior Paving Corporation3. EUROVIA ATLANTIC COAST LLC dba VIRGINIA
0001-0010Agr. base mat. TY.I or II no. 21A or 21B (305SP20-0003)TON820.38$73.23$50.00$65.00
0001-0020Tack coat (310SD20-0001)GAL26,252$0.01$0.01$0.01
0001-0030Asph. conc. TY. IM-19.0A maint (315SD20-0040)TON3,717.12$84.84$85.00$115.00
0001-0040Pavement shoulder wedge prep. const (315SP20-0006)LF49,526$0.01$0.01$0.45
0001-0050Asph. conc. BMD P+VO SM- 9.5A (315SP20-0048)TON4,828.71$90.00$106.00$130.00
0001-0060Asph. conc. BMD P+VO SM- 9.5D (315SP20-0049)TON12,689.96$115.00$109.00$130.00
0001-0070Asph. conc. BMD P+VO SM- 12.5D (315SP20-0051)TON1,995.38$91.00$99.00$130.00
0001-0080Travel lane patching (patch mix type) IM-19.0A (323SD20-0030)TON1,209$130.00$125.00$200.00
0001-0090Flagger service (512SD20-0027)HR1,888$58.00$32.00$42.50
0001-0100Eradicate linear PVMT MRKG (512SD20-0042)LF47,626$0.20$0.27$0.35
0001-0110Temp. PVMT MRKG TY. A, 4" (512SD20-0046)LF382,296$0.01$0.16$0.20
0001-0120Temp. PVMT MRKG TY. A, 12" (512SD20-0049)LF622$2.87$2.87$4.00
0001-0130Temp. PVMT. symb. MRKG SNGL turn arrow TY. A (512SD20-0052)EACH12$61.51$61.51$85.00
0001-0140NS maintenance of traffic plant mix (512SP20-0002)LS1$20,669$61,000$145,000
0001-0150Flexible pave.planing 0"-2" (515SD20-0013)SY171,653.85$0.25$0.45$1.80
0001-0160Flexible pavement planing above 2"-4" (515SD20-0014)SY33,792$0.40$1.25$2.60
0001-017014/1 conductor cable enclosed (700SD20-0118)LF3,907$0.50$0.50$1.35
0001-0180Conduit PVC 1" (700SD20-0182)LF20$5.00$5.00$30.00
0001-0190Loop saw cut 3/8" (703SD20-0042)LF1,206$15.00$15.00$35.00
0001-0200Loop saw cut 5/8" (703SD20-0043)LF216$35.00$35.00$42.50
0001-0210Type B class I PVMT line MRKG 4" (704SD20-0006)LF216,370$0.84$0.84$1.15
0001-0220Type B class I PVMT line MRKG 8" (704SD20-0008)LF885$1.74$1.74$2.40
0001-0230Type B class I PVMT line MRKG 24" (704SD20-0010)LF5,260$9.03$9.03$12.50
0001-0240PVMT MSG. mark. "only" TY B, CL. I, 6' (704SD20-0035)EACH2$373.64$373.64$520.00
0001-0250PVMT symb MRKG SGL turn arr. TY B CL I (704SD20-0047)EACH134$127.08$127.08$175.00
0001-0260DBL turn arr.thru/LT or RT TY B, CL I (704SD20-0050)EACH9$211.73$211.73$295.00
0001-0270Symb MRKG DBL turn arr LT/RT TY.B CL I (704SD20-0056)EACH1$208.24$208.24$290.00
0001-0280Symb MRKG lane reduction arr TY B CL I (704SD20-0059)EACH5$744.40$744.40$1,000.00
0001-0290PVMT MSG. mark. “only” TY B, CL. I, 8’ (704SD20-0107)EACH5$370.71$370.71$500.00
0001-0300PVMT MSG. mark. “school” TY B, CL I, 8’ (704SD20-0110)EACH2$899.82$899.82$1,225.00
0001-0310NS pave. message marking I-95 shield TY. B. CL. I (704SX20-0005)EACH3$2,500.00$2,500.00$3,450.00
0001-0320NS pave. message marking no trucks TY. B. CL. I (704SX20-0005)EACH1$1,400.00$1,400.00$1,950.00
0001-0330NS pave. message marking north TY. B. CL. I (704SX20-0005)EACH1$1,000.00$1,000.00$1,375.00
0001-0340NS pave. message marking south TY. B. CL. I (704SX20-0005)EACH4$1,000.00$1,000.00$1,375.00
0001-0350NS pave. message marking US-17 shield TY. B. CL. I (704SX20-0005)EACH2$1,350.00$1,350.00$1,875.00
0002-0360NS select material alternate shoulder material (305SX20-0006)TON1$72.23$47.87$65.00
VDOT contract CM626PME127628: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from VDOT's tabulation for this contract. VDOT bid tabulation PDFs for October 2025 to October 2026 (all bidders, awarded contracts), and VDOT yearly bid tab workbooks for 2002 to 2021, which list only the three lowest bids on each contract. The workbooks store numbers in single precision, so their bids are checked to within $1 or 0.0001% of the total, whichever is larger.

Every contract let that day: VDOT letting of November 19, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy