WisDOT contract 20250114003 bid tabulation
C Portage, Wisconsin Street; Pleasant Street to Dewitt Street (USH 051, Columbia County C Portage, Wisconsin Street). Let by Wisconsin DOT on January 14, 2025, Columbia. 3 bids received; low bid $561,929 by D L Gasser Construction.
- Owner
- Wisconsin DOT
- Letting
- 14 JAN 2025
- Pay items
- 72
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | D L Gasser Construction | $561,929 | Low |
| 2 | Tri-County Paving, Inc. | $572,656 | +2.0% |
| 3 | Payne and Dolan, Inc | $748,811 | +33% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. D L Gasser Construction | 2. Tri-County Paving, Inc. | 3. Payne and Dolan, Inc |
|---|---|---|---|---|---|---|
| 1 | Removing curb & gutter (204.0150) | LF | 495 | $28.00 | $25.00 | $30.00 |
| 2 | Removing concrete sidewalk (204.0155) | SY | 450 | $35.00 | $50.00 | $50.00 |
| 3 | Prepare foundation for asphaltic paving (project) 01. 1400-01-74 (211.0101) | EACH | 1 | $12,000 | $10,000 | $20,000 |
| 4 | Finishing roadway (project) 01. 1400-01-74 (213.0100) | EACH | 1 | $1,000.00 | $30,000 | $500.00 |
| 5 | Base aggregate dense 3/4-inch (305.0110) | TON | 120 | $16.00 | $27.25 | $53.00 |
| 6 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 470 | $18.00 | $27.25 | $23.00 |
| 7 | Coloring concrete wisdot red (405.0100) | CY | 41 | $178.87 | $178.87 | $178.87 |
| 8 | Concrete pavement 8-inch (415.0080) | SY | 50 | $95.53 | $95.53 | $95.53 |
| 9 | Drilled tie bars (416.0610) | EACH | 13 | $11.89 | $11.89 | $11.89 |
| 10 | Drilled dowel bars (416.0620) | EACH | 56 | $15.52 | $15.52 | $15.52 |
| 11 | Tack coat (455.0605) | GAL | 1,000 | $2.50 | $2.75 | $2.50 |
| 12 | Incentive density HMA pavement (460.2000) | DOL | 1,560 | $1.00 | $1.00 | $1.00 |
| 13 | HMA pavement 4 MT 58-28 H (460.6424) | TON | 2,430 | $90.25 | $78.10 | $130.00 |
| 14 | Concrete curb & gutter 30-inch type D (601.0411) | LF | 495 | $31.23 | $31.23 | $31.23 |
| 15 | Concrete curb pedestrian (601.0600) | LF | 105 | $54.69 | $54.69 | $54.69 |
| 16 | Concrete sidewalk 5-inch (602.0410) | SF | 4,020 | $7.66 | $7.66 | $7.66 |
| 17 | Curb ramp detectable warning field yellow (602.0505) | SF | 110 | $52.85 | $52.85 | $52.85 |
| 18 | Curb ramp detectable warning field radial yellow (602.0605) | SF | 85 | $66.81 | $66.81 | $66.81 |
| 19 | Adjusting manhole covers (611.8110) | EACH | 16 | $1,500.00 | $1,600.00 | $2,525.00 |
| 20 | Adjusting inlet covers (611.8115) | EACH | 5 | $900.00 | $800.00 | $725.00 |
| 21 | Fence safety (616.0700.S) | LF | 200 | $3.00 | $3.50 | $3.50 |
| 22 | Mobilization (619.1000) | EACH | 1 | $68,100 | $50,000 | $72,000 |
| 23 | Water (624.0100) | MGAL | 11 | $60.00 | $60.00 | $40.00 |
| 24 | Topsoil (625.0100) | SY | 35 | $90.00 | $20.00 | $40.00 |
| 25 | Mobilizations erosion control (628.1905) | EACH | 3 | $50.00 | $50.00 | $50.00 |
| 26 | Mobilizations emergency erosion control (628.1910) | EACH | 2 | $100.00 | $100.00 | $100.00 |
| 27 | Erosion mat class I type B (628.2004) | SY | 35 | $5.00 | $5.00 | $5.00 |
| 28 | Inlet protection type C (628.7015) | EACH | 9 | $60.00 | $60.00 | $60.00 |
| 29 | Fertilizer type B (629.0210) | CWT | 2 | $100.00 | $100.00 | $100.00 |
| 30 | Seeding mixture no. 40 (630.0140) | LB | 5 | $50.00 | $50.00 | $50.00 |
| 31 | Seed water (630.0500) | MGAL | 0.20 | $500.00 | $500.00 | $500.00 |
| 32 | Field office type B (642.5001) | EACH | 1 | $6,000.00 | $15,000 | $1,500.00 |
| 33 | Traffic control drums (643.0300) | DAY | 100 | $1.44 | $1.00 | $2.00 |
| 34 | Traffic control barricades type III (643.0420) | DAY | 921 | $0.77 | $0.40 | $1.25 |
| 35 | Traffic control signs (643.0900) | DAY | 9,340 | $0.26 | $0.55 | $0.43 |
| 36 | Traffic control signs PCMS (643.1050) | DAY | 49 | $24.53 | $65.00 | $40.00 |
| 37 | Traffic control (643.5000) | EACH | 1 | $11,959 | $7,500.00 | $19,500 |
| 38 | Temporary pedestrian surface asphalt (644.1410) | SF | 1,480 | $2.90 | $3.50 | $15.00 |
| 39 | Temporary pedestrian curb ramp (644.1601) | DAY | 64 | $12.88 | $10.00 | $21.00 |
| 40 | Temporary pedestrian detectable warning field (644.1605) | SF | 500 | $13.49 | $12.00 | $22.00 |
| 41 | Temporary pedestrian barricade (644.1810) | LF | 2,630 | $2.76 | $6.00 | $4.50 |
| 42 | Marking line epoxy 6-inch (646.2020) | LF | 2,810 | $2.75 | $2.75 | $2.60 |
| 43 | Marking line epoxy 10-inch (646.4020) | LF | 60 | $4.75 | $4.75 | $5.75 |
| 44 | Marking arrow epoxy (646.5020) | EACH | 4 | $115.00 | $115.00 | $330.00 |
| 45 | Marking symbol epoxy (646.5220) | EACH | 3 | $95.00 | $95.00 | $310.00 |
| 46 | Marking stop line epoxy 18-inch (646.6120) | LF | 180 | $8.35 | $8.35 | $16.00 |
| 47 | Marking diagonal epoxy 12-inch (646.7120) | LF | 50 | $5.55 | $5.55 | $14.00 |
| 48 | Marking crosswalk epoxy transverse line 6-inch (646.7420) | LF | 1,100 | $2.75 | $2.75 | $13.00 |
| 49 | Marking curb epoxy (646.8120) | LF | 367 | $14.50 | $14.50 | $6.00 |
| 50 | Marking parking stall epoxy (646.8320) | LF | 550 | $1.85 | $1.85 | $3.20 |
| 51 | Construction staking base (650.5000) | LF | 1,322 | $1.10 | $0.01 | $1.10 |
| 52 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 510 | $1.25 | $2.00 | $1.25 |
| 53 | Construction staking curb ramps (650.9000) | EACH | 18 | $200.00 | $200.00 | $200.00 |
| 54 | Construction staking sidewalk (project) 01. 1400-01-74 (650.9500) | EACH | 1 | $1,500.00 | $2,000.00 | $1,500.00 |
| 55 | Construction staking supplemental control (project) 01. 1400-01-74 (650.9911) | EACH | 1 | $900.00 | $2,200.00 | $900.00 |
| 56 | Conduit rigid nonmetallic schedule 40 2-inch (652.0225) | LF | 82 | $11.00 | $11.00 | $11.00 |
| 57 | Install conduit into existing item (652.0700.S) | EACH | 5 | $150.00 | $150.00 | $150.00 |
| 58 | Adjusting pull boxes (653.0900) | EACH | 5 | $400.00 | $400.00 | $400.00 |
| 59 | Concrete bases type 1 (654.0101) | EACH | 5 | $1,500.00 | $1,500.00 | $1,500.00 |
| 60 | Cable traffic signal 7-14 AWG (655.0240) | LF | 1,054 | $1.75 | $1.75 | $1.75 |
| 61 | Electrical wire traffic signals 10 AWG (655.0515) | LF | 646 | $1.15 | $1.15 | $1.15 |
| 62 | Loop detector lead in cable (655.0700) | LF | 77 | $1.50 | $1.50 | $1.50 |
| 63 | Pedestal bases (657.0100) | EACH | 5 | $300.00 | $300.00 | $300.00 |
| 64 | Traffic signal standards aluminum 3.5-FT (657.0405) | EACH | 5 | $350.00 | $350.00 | $350.00 |
| 65 | Pedestrian push buttons (658.0500) | EACH | 7 | $500.00 | $500.00 | $500.00 |
| 66 | Signal mounting hardware (location) 01. ush 51/wisconsin street & cook street (658.5070) | EACH | 1 | $1,500.00 | $1,500.00 | $1,500.00 |
| 67 | Sawing asphalt (690.0150) | LF | 210 | $1.94 | $1.75 | $1.75 |
| 68 | Sawing concrete (690.0250) | LF | 400 | $2.95 | $2.35 | $2.35 |
| 69 | Incentive iri ride (740.0440) | DOL | 1,002 | $1.00 | $1.00 | $1.00 |
| 70 | Special 01. adjusting water valve covers (SPV.0060) | EACH | 12 | $500.00 | $800.00 | $1,000.00 |
| 71 | Special 02. remove pedestrian button and cover hole (SPV.0060) | EACH | 5 | $150.00 | $150.00 | $150.00 |
| 72 | Special 01. reveal curb (SPV.0090) | LF | 84 | $63.39 | $63.39 | $63.39 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of January 14, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.