WisDOT contract 20250114008 bid tabulation

Spring Green - Reedsburg; Elder Ridge Road to CTH K (STH 023, Sauk County Spring Green - Reedsburg). Let by Wisconsin DOT on January 14, 2025, Sauk. 3 bids received; low bid $8,129,633 by Rock Road Companies, Inc..

Owner
Wisconsin DOT
Letting
14 JAN 2025
Pay items
183
Data through
10 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Rock Road Companies, Inc.$8,129,633Low
2D L Gasser Construction$8,133,4790.0%
3Gerke Excavating Inc$8,776,127+8.0%
WisDOT contract 20250114008: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Rock Road Companies, Inc.2. D L Gasser Construction3. Gerke Excavating Inc
1Grubbing (201.0205)STA16$249.75$250.00$249.75
2Removing small pipe culverts (203.0100)EACH10$836.20$700.00$1,102.47
3Removing asphaltic surface milling (204.0120)SY184,000$1.00$2.94$2.94
4Removing curb & gutter (204.0150)LF1,070$6.80$6.28$4.78
5Removing concrete sidewalk (204.0155)SY560$10.53$6.05$9.13
6Removing guardrail (204.0165)LF2,690$3.00$2.25$2.25
7Removing delineators and markers (204.0180)EACH19$25.00$25.00$25.00
8Removing inlets (204.0220)EACH3$994.23$800.00$409.13
9Removing storm sewer (size) 01. 12-inch (204.0245)LF40$18.08$50.00$31.22
10Removing storm sewer (size) 02. 24-inch (204.0245)LF34$18.08$50.00$36.73
11Removing storm sewer (size) 03. 30-inch (204.0245)LF71$18.08$50.00$35.03
12Excavation common (205.0100)CY14,500$14.66$8.93$10.13
13Prepare foundation for asphaltic paving (project) 01. 5080-09-73 (211.0101)EACH1$22,284$114,221$114,221
14Finishing roadway (project) 01. 5080-09-73 (213.0100)EACH1$5,214.81$1,596.14$7,504.76
15Base aggregate dense 3/4-inch (305.0110)TON19,350$23.11$18.86$21.08
16Base aggregate dense 1 1/4-inch (305.0120)TON19,000$15.55$18.29$16.58
17Base aggregate dense 3-inch (305.0130)TON23,600$15.68$16.97$15.35
18QMP base aggregate dense 1 1/4- inch compaction (371.2000.S)EACH23$300.00$775.00$1,079.57
19Concrete pavement hes 12-inch (415.1120)SY35$128.86$128.86$128.86
20Drilled tie bars (416.0610)EACH18$11.30$11.30$11.30
21Tack coat (455.0605)GAL9,488$3.09$2.20$2.20
22HMA percent within limits (PWL) test strip volumetrics (460.0105.S)EACH2$3,500.00$3,769.81$3,769.81
23HMA percent within limits (PWL) test strip density (460.0110.S)EACH2$3,500.00$2,219.89$2,219.89
24Incentive density PWL HMA pavement (460.2005)DOL33,710$1.00$1.00$1.00
25Incentive density HMA pavement longitudinal joints (460.2007)DOL16,420$1.00$1.00$1.00
26Incentive air voids HMA pavement (460.2010)DOL57,050$1.00$1.00$1.00
27HMA pavement 3 MT 58-28 S (460.6223)TON31,100$76.68$71.66$71.66
28HMA pavement 4 MT 58-28 S (460.6224)TON25,950$79.88$75.12$75.12
29Asphaltic surface (465.0105)TON1,160$70.48$106.49$106.49
30Asphaltic surface driveways and field entrances (465.0120)TON90$121.28$278.80$278.80
31Asphaltic flumes (465.0315)SY60$55.70$131.38$131.38
32Asphaltic rumble strips, shoulder (465.0520)LF63,550$0.13$0.13$0.17
33Asphaltic rumble strips, centerline (465.0560)LF29,900$0.17$0.17$0.17
34Apron endwalls for culvert pipe 18- inch (520.1018)EACH6$609.50$500.00$486.53
35Apron endwalls for culvert pipe 30- inch (520.1030)EACH2$880.64$1,690.00$931.94
36Apron endwalls for culvert pipe 36- inch (520.1036)EACH4$1,027.49$2,145.00$1,679.02
37Culvert pipe class III-A 18-inch (520.3318)LF98$75.57$126.00$54.49
38Culvert pipe class III-A 36-inch (520.3336)LF110$175.41$198.00$238.40
39Culvert pipe class IV 30-inch (520.4130)LF68$219.47$203.00$190.79
40Culvert pipe class IV 36-inch (520.4136)LF78$162.82$277.00$250.60
41Pipe cattle pass (520.8500)LF84$373.95$385.00$1,163.20
42Cleaning culvert pipes (520.8700)EACH1$3,500.00$1,000.00$1,000.00
43Apron endwalls for pipe arch steel 28X20-inch (521.1228)EACH2$551.39$520.00$524.27
44Pipe arch corrugated steel 28X20- inch (521.3728)LF78$403.02$132.50$445.75
45Culvert pipe reinforced concrete class IV 36-inch (522.0436)LF168$435.68$307.00$350.89
46Culvert pipe reinforced concrete class IV 48-inch (522.0448)LF162$703.66$477.00$590.67
47Apron endwalls for culvert pipe reinforced concrete 24-inch (522.1024)EACH1$1,542.09$1,365.00$1,210.43
48Apron endwalls for culvert pipe reinforced concrete 30-inch (522.1030)EACH1$1,725.97$1,565.00$1,402.07
49Apron endwalls for culvert pipe reinforced concrete 36-inch (522.1036)EACH2$2,195.91$2,120.00$2,389.41
50Apron endwalls for culvert pipe reinforced concrete 48-inch (522.1048)EACH2$2,734.21$2,790.00$2,950.43
51Concrete curb & gutter 18-inch type D (601.0407)LF390$25.18$25.18$25.18
52Concrete curb & gutter 30-inch type D (601.0411)LF855$28.70$28.70$28.70
53Concrete curb & gutter 6-inch sloped 36-inch type D (601.0557)LF210$35.69$35.69$35.69
54Concrete curb & gutter 4-inch sloped 36-inch type TBT (601.0588)LF60$40.57$40.57$40.57
55Concrete curb & gutter 4-inch sloped 36-inch type TBTT (601.0590)LF40$37.31$37.31$37.31
56Concrete curb pedestrian (601.0600)LF95$55.32$55.32$55.32
57Concrete sidewalk 4-inch (602.0405)SF590$4.53$4.53$5.16
58Concrete sidewalk 5-inch (602.0410)SF5,920$5.76$5.76$6.26
59Curb ramp detectable warning field yellow (602.0505)SF330$52.96$52.96$52.96
60Curb ramp detectable warning field radial yellow (602.0605)SF113.88$67.81$67.81$67.81
61Concrete surface drains (602.3010)CY4$752.52$752.52$752.52
62Riprap heavy (606.0300)CY120$114.35$98.00$89.63
63Storm sewer rock excavation (608.0005)CY2$300.00$750.00$580.19
64Storm sewer pipe reinforced concrete class III 24-inch (608.0324)LF41$131.46$122.00$88.22
65Storm sewer pipe reinforced concrete class IV 12-inch (608.0412)LF5$113.38$219.00$71.36
66Storm sewer pipe reinforced concrete class IV 24-inch (608.0424)LF52$138.64$115.00$92.14
67Storm sewer pipe reinforced concrete class IV 30-inch (608.0430)LF67$169.74$159.00$126.91
68Inlet covers type H-S (611.0639)EACH1$1,027.96$1,105.00$1,072.79
69Inlet covers type Z (611.0666)EACH2$880.99$1,110.00$1,088.39
70Manholes 5-FT diameter (611.2005)EACH1$4,546.89$4,200.00$4,330.25
71Inlets 3-FT diameter (611.3003)EACH1$2,526.31$1,850.00$2,224.35
72Inlets 4-FT diameter (611.3004)EACH1$3,196.87$2,610.00$2,836.29
73Adjusting manhole covers (611.8110)EACH19$748.38$635.00$1,191.94
74Adjusting inlet covers (611.8115)EACH4$313.64$635.00$1,193.17
75Barrier system grading shaping finishing (614.0010)EACH16$12,627$7,298.00$14,278
76Steel thrie beam structure approach (614.0200)LF84$90.00$87.00$87.00
77Steel plate beam guard class A (614.0305)LF50$35.00$25.00$25.00
78Steel plate beam guard energy absorbing terminal (614.0370)EACH4$4,200.00$3,433.00$3,433.00
79Guardrail mow strip emulsified asphalt (614.0397)SY25$150.00$221.63$201.85
80MGS guardrail 3 (614.2300)LF330$32.00$26.00$26.00
81MGS guardrail 3 K (614.2330)LF1,140$40.00$37.53$37.53
82MGS guardrail 3 L (614.2340)LF115$34.00$27.00$27.00
83MGS guardrail short radius (614.2350)LF50$40.00$26.00$26.00
84MGS thrie beam transition (614.2500)LF320$92.00$85.00$85.00
85MGS guardrail terminal eat (614.2610)EACH15$4,200.00$3,433.00$3,433.00
86MGS guardrail short radius terminal (614.2630)EACH1$2,800.00$1,953.00$1,953.00
87Maintenance and repair of haul roads (project) 01. 5080-09-73 (618.0100)EACH1$0.01$1.00$0.01
88Mobilization (619.1000)EACH1$287,170$217,104$567,756
89Concrete median sloped nose (620.0300)SF64$10.83$10.83$10.83
90Water (624.0100)MGAL950$0.01$13.00$42.87
91Topsoil (625.0100)SY3,150$0.01$4.70$10.48
92Salvaged topsoil (625.0500)SY1,750$3.93$1.80$1.29
93Silt fence (628.1504)LF9,500$2.25$1.60$1.60
94Silt fence maintenance (628.1520)LF19,000$0.01$0.03$0.03
95Mobilizations erosion control (628.1905)EACH10$100.00$203.00$203.00
96Mobilizations emergency erosion control (628.1910)EACH6$100.00$403.00$403.00
97Erosion mat class I type B (628.2004)SY4,950$2.00$1.02$1.02
98Inlet protection type A (628.7005)EACH3$175.00$100.00$100.00
99Inlet protection type C (628.7015)EACH39$65.00$55.00$55.00
100Temporary ditch checks (628.7504)LF420$10.00$8.00$8.00
101Culvert pipe checks (628.7555)EACH80$20.00$20.00$20.00
102Fertilizer type B (629.0210)CWT4$200.00$125.00$125.00
103Seeding mixture no. 30 (630.0130)LB75$12.00$12.00$12.00
104Seeding mixture no. 40 (630.0140)LB157$15.00$10.00$10.00
105Seeding mixture no. 70 (630.0170)LB10$200.00$123.00$123.00
106Seeding temporary (630.0200)LB40$5.00$6.00$6.00
107Seed water (630.0500)MGAL120$20.00$10.00$10.00
108Markers row (633.5100)EACH33$75.00$60.00$60.00
109Markers culvert end (633.5200)EACH16$60.00$75.00$75.00
110Posts wood 4X6-inch X 16-FT (634.0616)EACH12$95.00$92.00$92.00
111Posts tubular steel 2X2-inch X 14- FT (634.0814)EACH11$195.00$225.00$225.00
112Signs type II reflective F (637.2230)SF59$25.00$25.00$25.00
113Moving signs type II (638.2102)EACH28$225.00$125.00$125.00
114Removing signs type II (638.2602)EACH2$50.00$50.00$50.00
115Removing small sign supports (638.3000)EACH22$35.00$30.00$30.00
116Field office type B (642.5001)EACH1$8,400.00$12,524$14,806
117Traffic control drums (643.0300)DAY2,324$1.00$0.23$0.23
118Traffic control barricades type III (643.0420)DAY6,078$1.00$0.45$0.45
119Traffic control warning lights type A (643.0705)DAY6,000$0.10$0.11$0.11
120Traffic control warning lights type C (643.0715)DAY2,324$0.10$0.11$0.11
121Traffic control signs (643.0900)DAY66,412$0.10$0.24$0.24
122Traffic control covering signs type II (643.0920)EACH42$25.00$40.00$40.00
123Traffic control signs PCMS (643.1050)DAY28$69.00$45.00$45.00
124Temporary marking line paint 6- inch (643.3165)LF61,500$0.19$0.34$0.34
125Temporary marking line epoxy 6- inch (643.3170)LF61,500$0.73$0.73$0.73
126Temporary marking line paint 8- inch (643.3205)LF1,670$0.29$2.00$2.00
127Traffic control (643.5000)EACH1$5,500.00$66,000$66,000
128Temporary pedestrian surface matting (644.1440)SF230$12.00$7.00$7.00
129Temporary pedestrian curb ramp (644.1601)DAY294$13.00$10.00$10.00
130Temporary pedestrian detectable warning field (644.1605)SF330$12.00$15.00$15.00
131Temporary pedestrian barricade (644.1810)LF1,165$5.25$8.50$8.50
132Geotextile type HR (645.0120)SY300$1.93$6.00$5.82
133Marking line grooved wet ref epoxy 6-inch (646.2040)LF148,700$1.18$1.18$1.18
134Marking line grooved wet ref epoxy 10-inch (646.4040)LF1,700$2.60$2.60$2.60
135Marking arrow epoxy (646.5020)EACH16$275.00$275.00$275.00
136Marking word epoxy (646.5120)EACH8$350.00$350.00$350.00
137Marking stop line epoxy 18-inch (646.6120)LF190$14.00$14.00$14.00
138Marking diagonal epoxy 12-inch (646.7120)LF900$7.00$7.00$7.00
139Marking crosswalk epoxy transverse line 6-inch (646.7420)LF1,720$13.00$13.00$13.00
140Marking crosswalk epoxy block style 24-inch (646.7520)LF115$17.00$17.00$17.00
141Marking curb epoxy (646.8120)LF670$8.00$8.00$8.00
142Marking island nose epoxy (646.8220)EACH2$350.00$350.00$350.00
143Marking removal line 6-inch (646.9002)LF945$2.00$1.15$1.15
144Locating no-passing zones (648.0100)MI8.11$325.00$325.00$325.00
145Construction staking storm sewer (650.4000)EACH5$100.00$150.00$100.00
146Construction staking subgrade (650.4500)LF5,950$0.01$0.01$0.01
147Construction staking base (650.5000)LF5,950$0.01$0.50$0.01
148Construction staking curb gutter and curb & gutter (650.5500)LF1,650$0.75$3.00$0.75
149Construction staking pipe culverts (650.6000)EACH7$125.00$200.00$125.00
150Construction staking concrete pavement (650.7000)LF20$1.00$10.00$1.00
151Construction staking resurfacing reference (650.8000)LF36,450$0.10$0.10$0.10
152Construction staking electrical installations (project) 01. 5080-09- 73 (650.8501)EACH1$2,000.00$300.00$2,000.00
153Construction staking curb ramps (650.9000)EACH40$200.00$250.00$200.00
154Construction staking sidewalk (project) 01. 5080-09-73 (650.9500)EACH1$1,500.00$5,000.00$1,500.00
155Construction staking supplemental control (project) 01. 5080-09-73 (650.9911)EACH1$5,000.00$5,000.00$5,000.00
156Construction staking slope stakes (650.9920)LF5,950$0.75$1.00$0.75
157Concrete bases type 1 (654.0101)EACH1$1,500.00$2,650.00$1,000.00
158Concrete bases type 2 (654.0102)EACH2$1,750.00$2,950.00$1,250.00
159Pedestal bases (657.0100)EACH1$375.00$350.00$600.00
160Transformer bases breakaway 11 1/2-inch bolt circle (657.0255)EACH2$850.00$650.00$750.00
161Poles type 2 (657.0305)EACH2$2,600.00$2,400.00$3,200.00
162Traffic signal standards aluminum 13-FT (657.0420)EACH1$1,500.00$900.00$1,000.00
163Trombone arms 15-FT (657.0585)EACH1$1,800.00$1,850.00$2,500.00
164Trombone arms 25-FT (657.0595)EACH1$2,500.00$2,450.00$3,400.00
165Pedestrian push buttons (658.0500)EACH2$950.00$250.00$1,000.00
166Sawing asphalt (690.0150)LF3,168$1.69$1.69$1.69
167Sawing concrete (690.0250)LF650$2.50$2.50$2.50
168Incentive iri ride (740.0440)DOL31,100$1.00$1.00$1.00
169On-the-job training apprentice at $5.00/HR (ASP.1T0A)HRS2,500$5.00$5.00$5.00
170On-the-job training graduate at $5.00/HR (ASP.1T0G)HRS3,520$5.00$5.00$5.00
171Special 01. temporary audible message device (SPV.0045)DAY350$46.00$10.00$10.00
172Special 01. marking yield line epoxy 36-inch (SPV.0060)EACH15$125.00$125.00$125.00
173Special 04. remove and replace parking blocks (SPV.0060)EACH3$500.00$125.00$600.00
174Special 05. rectangular rapid flashing beacon (RRFB) system (SPV.0060)EACH6$5,000.00$4,200.00$7,400.00
175Special 06. thermal pedestrian detector (SPV.0060)EACH3$7,500.00$11,719$6,200.00
176Special 08. verify landmark reference monuments (SPV.0060)EACH2$1,250.00$400.00$1,250.00
177Special 09. landmark reference monuments special (SPV.0060)EACH2$1,250.00$400.00$1,250.00
178Special 10. verify and replace existing land parcel monuments (SPV.0060)EACH19$25.00$100.00$25.00
179Special 11. research and locate existing land parcel monuments (SPV.0060)EACH19$200.00$100.00$200.00
180Special 13. adjusting water valves (SPV.0060)EACH25$313.64$600.00$1,123.31
181Special 14. adjusting sanitary manhole covers (SPV.0060)EACH10$1,126.28$1,050.00$1,192.23
182Special 15. adjusting curb boxes (SPV.0060)EACH4$156.82$1,100.00$1,124.62
183Special 01. survey existing slope elevations (SPV.0090)LF4,650$1.00$1.00$1.00
WisDOT contract 20250114008: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.

Every contract let that day: WisDOT letting of January 14, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy