WisDOT contract 20250114009 bid tabulation
Prairie Du Chien - Ferryville; CTH N to CTH E/B-12-41,-42,-43,-45 (STH 035, Crawford County Prairie Du Chien - Ferryville). Let by Wisconsin DOT on January 14, 2025, Crawford. 2 bids received; low bid $12,064,663 by Iverson Construction, A Div. of Mathy Co.
- Owner
- Wisconsin DOT
- Letting
- 14 JAN 2025
- Pay items
- 162
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Iverson Construction, A Div. of Mathy Co | $12,064,663 | Low |
| 2 | Gerke Excavating Inc | $12,204,350 | +1.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Iverson Construction, A Div. of Mathy Co | 2. Gerke Excavating Inc |
|---|---|---|---|---|---|
| 1 | Roadside clearing (202.0105) | STA | 1 | $3,583.09 | $3,726.41 |
| 2 | Removing small pipe culverts (203.0100) | EACH | 6 | $3,429.06 | $3,566.22 |
| 3 | Abatement of asbestos containing material (structure) 01. B-12-45 (203.0211.S) | EACH | 1 | $2,415.00 | $2,637.18 |
| 4 | Debris containment over waterway (structure) 01. B-12-45 (203.0335) | EACH | 1 | $1,865.00 | $2,036.58 |
| 5 | Removing asphaltic surface (204.0110) | SY | 20,503 | $3.86 | $4.01 |
| 6 | Removing asphaltic surface butt joints (204.0115) | SY | 708 | $20.37 | $8.38 |
| 7 | Removing asphaltic surface milling (204.0120) | SY | 188,182 | $2.61 | $2.18 |
| 8 | Removing curb & gutter (204.0150) | LF | 42 | $17.15 | $17.84 |
| 9 | Removing concrete barrier (204.0157) | LF | 2,431 | $11.52 | $11.98 |
| 10 | Removing guardrail (204.0165) | LF | 45,126 | $1.55 | $2.45 |
| 11 | Removing inlets (204.0220) | EACH | 8 | $615.55 | $640.17 |
| 12 | Removing storm sewer (size) 01. 18-inch (204.0245) | LF | 692 | $31.56 | $32.82 |
| 13 | Removing storm sewer (size) 02. 24-inch (204.0245) | LF | 405 | $32.35 | $33.64 |
| 14 | Removing storm sewer (size) 03. 30-inch (204.0245) | LF | 315 | $31.70 | $32.97 |
| 15 | Removing storm sewer (size) 04. 36-inch (204.0245) | LF | 248 | $32.71 | $34.02 |
| 16 | Removing storm sewer (size) 05. 42-inch (204.0245) | LF | 82 | $38.12 | $39.64 |
| 17 | Removing (item description) 01. pipe railing (204.9090.S) | LF | 11 | $104.55 | $108.73 |
| 18 | Excavation common (205.0100) | CY | 17,630 | $17.97 | $18.69 |
| 19 | Backfill granular grade 2 (209.2500) | TON | 28,934 | $16.66 | $17.33 |
| 20 | Prepare foundation for asphaltic paving (project) 01. 5160-07-70 (211.0101) | EACH | 1 | $51,250 | $55,965 |
| 21 | Prepare foundation for asphaltic shoulders (211.0400) | STA | 185 | $120.00 | $131.04 |
| 22 | Finishing roadway (project) 01. 5160-07-70 (213.0100) | EACH | 1 | $1,200.00 | $10,644 |
| 23 | Base aggregate dense 3/4-inch (305.0110) | TON | 15,779 | $21.66 | $22.53 |
| 24 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 12,114 | $15.52 | $16.14 |
| 25 | Drilled tie bars (416.0610) | EACH | 120 | $23.00 | $17.50 |
| 26 | Tack coat (455.0605) | GAL | 24,290 | $2.85 | $3.11 |
| 27 | HMA percent within limits (PWL) test strip volumetrics (460.0105.S) | EACH | 1 | $3,845.00 | $3,998.80 |
| 28 | HMA percent within limits (PWL) test strip density (460.0110.S) | EACH | 1 | $3,845.00 | $3,998.80 |
| 29 | Incentive density PWL HMA pavement (460.2005) | DOL | 12,257 | $1.00 | $1.00 |
| 30 | Incentive density HMA pavement longitudinal joints (460.2007) | DOL | 10,420 | $1.00 | $1.00 |
| 31 | Incentive air voids HMA pavement (460.2010) | DOL | 38,296 | $1.00 | $1.00 |
| 32 | HMA pavement 4 MT 58-28 S (460.6224) | TON | 38,767 | $85.40 | $93.26 |
| 33 | Asphaltic surface (465.0105) | TON | 5,022 | $114.95 | $125.53 |
| 34 | Asphaltic flumes (465.0315) | SY | 9 | $300.00 | $327.60 |
| 35 | Asphaltic rumble strips, shoulder (465.0520) | LF | 97,126 | $0.14 | $0.16 |
| 36 | Asphaltic rumble strips, centerline (465.0560) | LF | 46,749 | $0.18 | $0.20 |
| 37 | Protective surface treatment (502.3200) | SY | 40 | $16.00 | $17.47 |
| 38 | Concrete surface repair (509.1500) | SF | 180 | $265.00 | $289.38 |
| 39 | Apron endwalls for culvert pipe 12- inch (520.1012) | EACH | 6 | $657.57 | $683.87 |
| 40 | Apron endwalls for culvert pipe 18- inch (520.1018) | EACH | 8 | $711.57 | $740.03 |
| 41 | Apron endwalls for culvert pipe 36- inch (520.1036) | EACH | 6 | $1,230.45 | $1,279.67 |
| 42 | Apron endwalls for culvert pipe 42- inch (520.1042) | EACH | 2 | $2,427.99 | $2,525.11 |
| 43 | Apron endwalls for culvert pipe 48- inch (520.1048) | EACH | 1 | $2,577.64 | $2,680.75 |
| 44 | Culvert pipe class III 42-inch (520.3142) | LF | 82 | $233.75 | $243.10 |
| 45 | Culvert pipe class III-A 12-inch (520.3312) | LF | 8 | $168.82 | $175.57 |
| 46 | Culvert pipe class III-A 18-inch (520.3318) | LF | 128 | $149.05 | $155.01 |
| 47 | Culvert pipe class III-A 36-inch (520.3336) | LF | 76 | $193.55 | $201.29 |
| 48 | Culvert pipe class III-B 18-inch (520.3518) | LF | 52 | $148.89 | $154.85 |
| 49 | Concrete collars for pipe (520.8000) | EACH | 41 | $1,421.47 | $1,478.33 |
| 50 | Culvert pipe corrugated steel 12- inch (521.3112) | LF | 84 | $139.62 | $145.20 |
| 51 | Culvert pipe corrugated steel 18- inch (521.3118) | LF | 798 | $148.49 | $154.43 |
| 52 | Culvert pipe corrugated steel 24- inch (521.3124) | LF | 417 | $155.38 | $161.60 |
| 53 | Culvert pipe corrugated steel 30- inch (521.3130) | LF | 327 | $173.02 | $179.94 |
| 54 | Culvert pipe corrugated steel 36- inch (521.3136) | LF | 352 | $193.28 | $201.01 |
| 55 | Culvert pipe corrugated steel 42- inch (521.3142) | LF | 58 | $234.16 | $243.53 |
| 56 | Culvert pipe corrugated steel 48- inch (521.3148) | LF | 60 | $244.55 | $254.33 |
| 57 | Concrete curb & gutter 4-inch sloped 36-inch type D (601.0553) | LF | 242 | $21.00 | $72.85 |
| 58 | Concrete curb & gutter 4-inch sloped 36-inch type TBT (601.0588) | LF | 5,929 | $21.50 | $40.48 |
| 59 | Concrete sidewalk 4-inch (602.0405) | SF | 697 | $10.00 | $15.54 |
| 60 | Curb ramp detectable warning field yellow (602.0505) | SF | 10 | $60.00 | $68.47 |
| 61 | Curb ramp detectable warning field radial yellow (602.0605) | SF | 17 | $70.00 | $76.61 |
| 62 | Concrete surface drains (602.3010) | CY | 22 | $1,000.00 | $2,610.49 |
| 63 | Riprap light (606.0100) | CY | 24 | $112.26 | $116.75 |
| 64 | Riprap heavy (606.0300) | CY | 856 | $86.82 | $90.29 |
| 65 | Inlet covers type B (611.0606) | EACH | 2 | $1,183.19 | $1,230.52 |
| 66 | Inlet covers type HM (611.0627) | EACH | 5 | $1,777.19 | $1,848.28 |
| 67 | Inlet covers type MS (611.0642) | EACH | 28 | $876.46 | $911.52 |
| 68 | Inlet covers type V (611.0654) | EACH | 8 | $1,051.21 | $1,093.26 |
| 69 | Catch basins 5-FT diameter (611.1005) | EACH | 4 | $5,946.94 | $6,184.82 |
| 70 | Inlets 2X2-FT (611.3220) | EACH | 8 | $2,691.75 | $2,799.42 |
| 71 | Inlets 2X3-FT (611.3230) | EACH | 2 | $2,648.64 | $2,754.59 |
| 72 | Inlets median 2 grate (611.3902) | EACH | 4 | $5,420.55 | $5,637.37 |
| 73 | Adjusting manhole covers (611.8110) | EACH | 2 | $847.03 | $880.91 |
| 74 | Adjusting inlet covers (611.8115) | EACH | 1 | $1,416.87 | $1,473.54 |
| 75 | MGS guardrail 3 (614.2300) | LF | 13,097 | $21.20 | $25.39 |
| 76 | MGS guardrail 3 K (614.2330) | LF | 30,875 | $37.10 | $37.13 |
| 77 | MGS guardrail 3 SL (614.2345) | LF | 75 | $30.15 | $54.60 |
| 78 | MGS guardrail short radius (614.2350) | LF | 481 | $24.00 | $40.40 |
| 79 | MGS thrie beam transition (614.2500) | LF | 1,615 | $82.85 | $92.82 |
| 80 | MGS guardrail terminal eat (614.2610) | EACH | 64 | $3,135.00 | $3,701.88 |
| 81 | MGS guardrail short radius terminal (614.2630) | EACH | 5 | $2,295.00 | $2,730.00 |
| 82 | Maintenance and repair of haul roads (project) 01. 5160-07-70 (618.0100) | EACH | 1 | $500.00 | $1.04 |
| 83 | Mobilization (619.1000) | EACH | 1 | $986,850 | $278,257 |
| 84 | Water (624.0100) | MGAL | 510 | $41.65 | $43.32 |
| 85 | Topsoil (625.0100) | SY | 5,439 | $13.48 | $14.02 |
| 86 | Salvaged topsoil (625.0500) | SY | 24,008 | $1.27 | $1.32 |
| 87 | Mulching (627.0200) | SY | 5,020 | $0.52 | $0.49 |
| 88 | Silt fence (628.1504) | LF | 6,448 | $1.75 | $2.45 |
| 89 | Silt fence maintenance (628.1520) | LF | 6,448 | $0.01 | $0.01 |
| 90 | Mobilizations erosion control (628.1905) | EACH | 13 | $200.00 | $109.20 |
| 91 | Mobilizations emergency erosion control (628.1910) | EACH | 9 | $200.00 | $109.20 |
| 92 | Erosion mat class I type B (628.2004) | SY | 12,369 | $0.94 | $1.36 |
| 93 | Erosion mat urban class I type B (628.2008) | SY | 11,003 | $1.40 | $1.91 |
| 94 | Turbidity barriers (628.6005) | SY | 1,373 | $27.35 | $60.06 |
| 95 | Inlet protection type A (628.7005) | EACH | 4 | $165.00 | $163.80 |
| 96 | Inlet protection type C (628.7015) | EACH | 28 | $38.00 | $65.52 |
| 97 | Temporary ditch checks (628.7504) | LF | 200 | $6.20 | $9.83 |
| 98 | Culvert pipe checks (628.7555) | EACH | 62 | $15.65 | $21.84 |
| 99 | Fertilizer type B (629.0210) | CWT | 26.50 | $75.00 | $92.82 |
| 100 | Seeding mixture no. 20 (630.0120) | LB | 1,335 | $9.25 | $9.78 |
| 101 | Seeding mixture no. 70 (630.0170) | LB | 2.30 | $141.00 | $273.00 |
| 102 | Seeding mixture no. 75 (630.0175) | LB | 44.90 | $50.00 | $81.90 |
| 103 | Seeding nurse crop (630.0400) | LB | 279 | $3.00 | $6.55 |
| 104 | Seed water (630.0500) | MGAL | 856 | $0.01 | $21.84 |
| 105 | Markers culvert end (633.5200) | EACH | 23 | $52.00 | $65.52 |
| 106 | Posts wood 4X6-inch X 14-FT (634.0614) | EACH | 25 | $71.00 | $92.82 |
| 107 | Posts wood 4X6-inch X 16-FT (634.0616) | EACH | 13 | $76.50 | $103.74 |
| 108 | Moving signs type II (638.2102) | EACH | 33 | $98.00 | $245.70 |
| 109 | Removing small sign supports (638.3000) | EACH | 38 | $18.25 | $38.22 |
| 110 | Field office type C (642.5201) | EACH | 1 | $31,775 | $33,541 |
| 111 | Traffic control drums (643.0300) | DAY | 21,620 | $0.23 | $0.23 |
| 112 | Traffic control barricades type III (643.0420) | DAY | 8,560 | $0.40 | $0.67 |
| 113 | Traffic control warning lights type A (643.0705) | DAY | 10,074 | $0.11 | $0.20 |
| 114 | Traffic control signs (643.0900) | DAY | 51,406 | $0.23 | $0.37 |
| 115 | Traffic control covering signs type II (643.0920) | EACH | 15 | $40.00 | $49.41 |
| 116 | Traffic control signs PCMS (643.1050) | DAY | 28 | $15.00 | $43.28 |
| 117 | Temporary marking line paint 6- inch (643.3165) | LF | 270,630 | $0.30 | $0.29 |
| 118 | Temporary marking crosswalk removable tape 6-inch (643.3350) | LF | 96 | $2.50 | $1.84 |
| 119 | Traffic control (643.5000) | EACH | 1 | $38,500 | $19,487 |
| 120 | Temporary pedestrian surface asphalt (644.1410) | SF | 160 | $28.25 | $30.85 |
| 121 | Temporary pedestrian curb ramp (644.1601) | DAY | 20 | $100.00 | $26.01 |
| 122 | Temporary pedestrian detectable warning field (644.1605) | SF | 20 | $75.00 | $26.48 |
| 123 | Temporary pedestrian barricade (644.1810) | LF | 128 | $15.00 | $6.45 |
| 124 | Geotextile type HR (645.0120) | SY | 1,720 | $2.45 | $2.55 |
| 125 | Geotextile type R (645.0130) | SY | 97 | $6.12 | $6.36 |
| 126 | Marking line grooved wet ref epoxy 6-inch (646.2040) | LF | 197,609 | $1.25 | $1.34 |
| 127 | Marking line grooved wet ref epoxy 10-inch (646.4040) | LF | 100 | $3.50 | $4.37 |
| 128 | Marking crosswalk epoxy transverse line 6-inch (646.7420) | LF | 116 | $15.00 | $13.10 |
| 129 | Construction staking storm sewer (650.4000) | EACH | 20 | $200.00 | $218.40 |
| 130 | Construction staking base (650.5000) | LF | 5,526 | $0.30 | $0.82 |
| 131 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 6,186 | $0.50 | $0.87 |
| 132 | Construction staking pipe culverts (650.6000) | EACH | 3 | $400.00 | $218.40 |
| 133 | Construction staking concrete barrier (650.7500) | LF | 555 | $1.00 | $1.09 |
| 134 | Construction staking resurfacing reference (650.8000) | LF | 52,082 | $0.20 | $0.14 |
| 135 | Construction staking sidewalk (project) 01. 5160-07-70 (650.9500) | EACH | 1 | $300.00 | $1,092.00 |
| 136 | Construction staking supplemental control (project) 01. 5160-07-70 (650.9911) | EACH | 1 | $200.00 | $1,092.00 |
| 137 | Construction staking slope stakes (650.9920) | LF | 46,430 | $0.20 | $0.66 |
| 138 | Sawing asphalt (690.0150) | LF | 11,011 | $1.75 | $1.91 |
| 139 | Incentive strength concrete barrier (715.0603) | DOL | 356 | $1.00 | $1.00 |
| 140 | Incentive iri ride (740.0440) | DOL | 39,457 | $1.00 | $1.00 |
| 141 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 2,500 | $5.00 | $5.00 |
| 142 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 3,520 | $5.00 | $5.00 |
| 143 | Special 01. incentive density PWL HMA pavement (SPV.0055) | DOL | 12,257 | $1.00 | $1.00 |
| 144 | Special 02. incentive density PWL HMA pavement longitudinal joints (SPV.0055) | DOL | 10,420 | $1.00 | $1.00 |
| 145 | Special 01. concrete barrier wall surface repair (SPV.0060) | EACH | 48 | $965.00 | $1,574.46 |
| 146 | Special 02. sawing concrete barrier wall (SPV.0060) | EACH | 96 | $150.00 | $163.80 |
| 147 | Special 03. inlets median 4 grate modified (SPV.0060) | EACH | 2 | $3,438.62 | $3,576.16 |
| 148 | Special 04. inlet covers, type MS modified (SPV.0060) | EACH | 16 | $1,222.00 | $2,625.83 |
| 149 | Special 05. inlet covers, type B modified (SPV.0060) | EACH | 4 | $2,314.79 | $2,407.38 |
| 150 | Special 06. cleaning inlets (SPV.0060) | EACH | 2 | $1,200.28 | $1,248.29 |
| 151 | Special 07. landmark reference monuments special (SPV.0060) | EACH | 6 | $250.00 | $546.00 |
| 152 | Special 08. verify landmark reference monuments (SPV.0060) | EACH | 6 | $250.00 | $546.00 |
| 153 | Special 09. box culvert joint repair C-12-0027 (SPV.0060) | EACH | 1 | $19,685 | $21,496 |
| 154 | Special 10. grading and shaping ditches (SPV.0060) | EACH | 6 | $1,922.15 | $1,999.04 |
| 155 | Special 11. site mowing project 5160-07-70 (SPV.0060) | EACH | 1 | $143,190 | $16,380 |
| 156 | Special 01. sprayed asphaltic surface treatment (SPV.0070) | GAL | 9,759 | $8.90 | $14.31 |
| 157 | Special 01. concrete barrier special (SPV.0090) | LF | 555 | $505.00 | $435.79 |
| 158 | Special 02. flashing stainless steel B-12-45 (SPV.0090) | LF | 98 | $174.00 | $190.01 |
| 159 | Special 03. concrete curb and gutter 36-inch type L special (SPV.0090) | LF | 15 | $60.00 | $72.85 |
| 160 | Special 04. concrete barrier transition section 32-inch to MGS (SPV.0090) | LF | 156 | $505.00 | $672.91 |
| 161 | Special 01. removing distressed pavement milling (SPV.0180) | SY | 2,075 | $21.25 | $26.82 |
| 162 | Special 01. shot rock (SPV.0195) | TON | 37,575 | $14.92 | $15.52 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of January 14, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.