WisDOT contract 20250114028 bid tabulation
CTH J - CTH Y; Plover River Bridge, B-37-0468 (CTH C, Marathon County CTH J - CTH Y). Let by Wisconsin DOT on January 14, 2025, Marathon. 6 bids received; low bid $846,890 by Larson Construction Co., Inc..
- Owner
- Wisconsin DOT
- Letting
- 14 JAN 2025
- Pay items
- 79
- Data through
- 10 NOV 2026
5 of the 6 bids matched their published totals to within a dollar and are shown; the others are left out.
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Larson Construction Co., Inc. | $846,890 | Low |
| 3 | Sheet Piling Services LLC | $916,595 | +8.0% |
| 4 | Janke General Contractors, Inc. | $921,142 | +9.0% |
| 5 | Lunda Construction Company | $982,481 | +16% |
| 6 | Radtke Contractors Inc. | $1,027,017 | +21% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Larson Construction Co., Inc. | 2. Sheet Piling Services LLC | 3. Janke General Contractors, Inc. | 4. Lunda Construction Company | 5. Radtke Contractors Inc. |
|---|---|---|---|---|---|---|---|---|
| 1 | Removing small pipe culverts (203.0100) | EACH | 1 | $500.00 | $500.00 | $885.00 | $500.00 | $500.00 |
| 2 | Abatement of asbestos containing material (structure) 01. B-37-016 (203.0211.S) | EACH | 1 | $4,625.80 | $4,580.00 | $4,580.00 | $5,000.00 | $4,580.00 |
| 3 | Removing structure over waterway remove debris (structure) 01. B-37- 016 (203.0250) | EACH | 1 | $58,419 | $85,000 | $45,825 | $242,500 | $118,142 |
| 4 | Removing asphaltic surface (204.0110) | SY | 653 | $4.65 | $4.65 | $9.00 | $4.65 | $4.65 |
| 5 | Excavation common (205.0100) | CY | 641 | $9.58 | $9.58 | $23.00 | $9.58 | $9.58 |
| 6 | Excavation for structures bridges (structure) 01. B-37-468 (206.1001) | EACH | 1 | $19,241 | $55,000 | $41,400 | $12,500 | $24,296 |
| 7 | Cofferdams (structure) 01. B-37-468 (206.5001) | EACH | 1 | $39,140 | $40,000 | $38,600 | $20,000 | $39,605 |
| 8 | Backfill structure type A (210.1500) | TON | 274 | $23.60 | $23.60 | $31.00 | $23.60 | $53.13 |
| 9 | Prepare foundation for asphaltic paving (project) 01. 6653-00-72 (211.0101) | EACH | 1 | $1,500.00 | $1,500.00 | $2,345.00 | $1,500.00 | $1,500.00 |
| 10 | Finishing roadway (project) 01. 6653-00-72 (213.0100) | EACH | 1 | $500.00 | $500.00 | $200.00 | $500.00 | $500.00 |
| 11 | Base aggregate dense 3/4-inch (305.0110) | TON | 94 | $23.48 | $23.48 | $29.00 | $23.48 | $23.48 |
| 12 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 883 | $20.73 | $20.73 | $20.00 | $20.73 | $20.73 |
| 13 | Concrete pavement 6-inch (415.0060) | SY | 29 | $105.00 | $105.00 | $190.00 | $105.00 | $105.00 |
| 14 | Concrete pavement approach slab (415.0410) | SY | 114 | $320.00 | $320.00 | $255.00 | $320.00 | $320.00 |
| 15 | Tack coat (455.0605) | GAL | 96 | $8.14 | $8.14 | $8.14 | $8.14 | $8.14 |
| 16 | Asphaltic surface (465.0105) | TON | 306 | $142.90 | $142.90 | $142.90 | $142.90 | $142.90 |
| 17 | Concrete masonry bridges (502.0100) | CY | 334.80 | $595.00 | $810.00 | $795.00 | $550.00 | $746.91 |
| 18 | Protective surface treatment (502.3200) | SY | 316 | $3.50 | $5.00 | $6.00 | $3.00 | $3.60 |
| 19 | Pigmented surface sealer (502.3210) | SY | 142 | $6.00 | $5.00 | $8.00 | $2.00 | $8.42 |
| 20 | Underwater substructure inspection (structure) 01. B-37-468 (502.9000.S) | EACH | 1 | $4,000.00 | $5,100.00 | $1,000.00 | $7,500.00 | $5,100.00 |
| 21 | Bar steel reinforcement HS structures (505.0400) | LB | 5,750 | $1.25 | $1.15 | $1.85 | $0.96 | $1.28 |
| 22 | Bar steel reinforcement HS coated structures (505.0600) | LB | 64,800 | $1.25 | $1.20 | $1.43 | $1.10 | $1.16 |
| 23 | Rubberized membrane waterproofing (516.0500) | SY | 40 | $24.00 | $30.00 | $35.00 | $25.00 | $74.42 |
| 24 | Culvert pipe reinforced concrete horizontal elliptical class HE-III 14X23-inch (522.2314) | LF | 24 | $192.50 | $192.50 | $200.00 | $192.50 | $192.50 |
| 25 | Apron endwalls for culvert pipe reinforced concrete horizontal elliptical 14X23-inch (522.2614) | EACH | 2 | $1,425.00 | $1,425.00 | $1,600.00 | $1,425.00 | $1,425.00 |
| 26 | Pile points (550.0500) | EACH | 22 | $175.00 | $200.00 | $190.00 | $150.00 | $125.00 |
| 27 | Piling steel HP 10-inch X 42 LB (550.1100) | LF | 1,540 | $50.00 | $40.00 | $53.50 | $40.95 | $34.43 |
| 28 | Concrete curb & gutter 4-inch sloped 30-inch type TBT (601.0584) | LF | 101 | $62.00 | $62.00 | $86.50 | $62.00 | $62.00 |
| 29 | Concrete surface drains (602.3010) | CY | 4 | $1,200.00 | $1,200.00 | $1,450.00 | $1,200.00 | $1,200.00 |
| 30 | Riprap medium (606.0200) | CY | 6 | $105.30 | $105.30 | $176.00 | $105.30 | $105.30 |
| 31 | Riprap heavy (606.0300) | CY | 260 | $78.99 | $86.00 | $80.00 | $78.99 | $88.28 |
| 32 | Pipe underdrain wrapped 6-inch (612.0406) | LF | 120 | $6.50 | $6.50 | $15.00 | $6.50 | $4.20 |
| 33 | Anchor assemblies for steel plate beam guard (614.0150) | EACH | 4 | $200.00 | $250.00 | $500.00 | $175.00 | $225.08 |
| 34 | MGS guardrail 3 (614.2300) | LF | 175 | $28.50 | $28.50 | $26.00 | $28.50 | $28.50 |
| 35 | MGS thrie beam transition (614.2500) | LF | 157.60 | $95.00 | $95.00 | $92.00 | $95.00 | $95.00 |
| 36 | MGS guardrail terminal eat (614.2610) | EACH | 4 | $3,600.00 | $3,600.00 | $4,142.88 | $3,600.00 | $3,600.00 |
| 37 | Maintenance and repair of haul roads (project) 01. 6653-00-72 (618.0100) | EACH | 1 | $1.00 | $0.01 | $200.00 | $0.01 | $500.00 |
| 38 | Mobilization (619.1000) | EACH | 1 | $74,068 | $28,230 | $40,000 | $83,386 | $158,250 |
| 39 | Water (624.0100) | MGAL | 15 | $20.00 | $20.00 | $19.99 | $20.00 | $20.00 |
| 40 | Topsoil (625.0100) | SY | 1,600 | $2.92 | $2.92 | $5.25 | $2.92 | $2.92 |
| 41 | Silt fence (628.1504) | LF | 1,250 | $2.50 | $2.50 | $2.25 | $2.50 | $2.50 |
| 42 | Silt fence maintenance (628.1520) | LF | 1,250 | $0.10 | $0.10 | $0.03 | $0.10 | $0.10 |
| 43 | Mobilizations erosion control (628.1905) | EACH | 5 | $200.00 | $200.00 | $173.00 | $200.00 | $200.00 |
| 44 | Mobilizations emergency erosion control (628.1910) | EACH | 3 | $200.00 | $200.00 | $203.00 | $200.00 | $200.00 |
| 45 | Erosion mat urban class I type A (628.2006) | SY | 1,600 | $1.90 | $1.90 | $2.50 | $1.90 | $1.90 |
| 46 | Turbidity barriers (628.6005) | SY | 451 | $48.50 | $48.50 | $30.00 | $48.50 | $48.50 |
| 47 | Rock bags (628.7570) | EACH | 85 | $12.50 | $12.50 | $12.00 | $12.50 | $12.50 |
| 48 | Fertilizer type B (629.0210) | CWT | 1 | $100.00 | $100.00 | $95.00 | $100.00 | $100.00 |
| 49 | Seeding mixture no. 20 (630.0120) | LB | 43 | $6.00 | $6.00 | $12.00 | $6.00 | $6.00 |
| 50 | Seeding temporary (630.0200) | LB | 43 | $3.00 | $3.00 | $8.00 | $3.00 | $3.00 |
| 51 | Seed water (630.0500) | MGAL | 36 | $20.00 | $20.00 | $20.00 | $20.00 | $20.00 |
| 52 | Posts wood 4X6-inch X 14-FT (634.0614) | EACH | 4 | $120.00 | $120.00 | $95.00 | $120.00 | $120.00 |
| 53 | Posts wood 4X6-inch X 16-FT (634.0616) | EACH | 2 | $125.00 | $125.00 | $100.00 | $125.00 | $125.00 |
| 54 | Signs type II reflective F (637.2230) | SF | 12 | $30.00 | $30.00 | $50.00 | $30.00 | $30.00 |
| 55 | Moving signs type II (638.2102) | EACH | 2 | $15.00 | $15.00 | $150.00 | $15.00 | $15.00 |
| 56 | Removing signs type II (638.2602) | EACH | 6 | $10.00 | $10.00 | $50.00 | $10.00 | $10.00 |
| 57 | Removing small sign supports (638.3000) | EACH | 6 | $10.00 | $10.00 | $50.00 | $10.00 | $10.00 |
| 58 | Field office type B (642.5001) | EACH | 1 | $3,300.00 | $1,000.00 | $1,000.00 | $3,000.00 | $2,142.17 |
| 59 | Traffic control barricades type III (643.0420) | DAY | 1,566 | $0.30 | $0.30 | $0.30 | $1.00 | $0.30 |
| 60 | Traffic control warning lights type A (643.0705) | DAY | 2,436 | $0.10 | $0.10 | $0.10 | $0.15 | $0.10 |
| 61 | Traffic control signs (643.0900) | DAY | 21,896 | $0.28 | $0.28 | $0.28 | $0.25 | $0.28 |
| 62 | Traffic control covering signs type I (643.0910) | EACH | 3 | $40.00 | $40.00 | $40.00 | $200.00 | $40.00 |
| 63 | Traffic control (643.5000) | EACH | 1 | $1,915.00 | $1,915.00 | $4,371.82 | $5,700.00 | $1,915.00 |
| 64 | Geotextile type DF schedule A (645.0111) | SY | 50 | $8.00 | $8.00 | $3.50 | $8.00 | $5.05 |
| 65 | Geotextile type HR (645.0120) | SY | 481 | $6.50 | $5.00 | $4.50 | $6.50 | $5.44 |
| 66 | Marking line epoxy 6-inch (646.2020) | LF | 1,873 | $2.90 | $2.90 | $2.90 | $2.90 | $2.75 |
| 67 | Construction staking subgrade (650.4500) | LF | 609 | $0.01 | $0.01 | $0.01 | $0.01 | $0.01 |
| 68 | Construction staking base (650.5000) | LF | 609 | $0.75 | $0.75 | $0.75 | $0.75 | $0.75 |
| 69 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 101 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 |
| 70 | Construction staking pipe culverts (650.6000) | EACH | 1 | $300.00 | $300.00 | $300.00 | $300.00 | $300.00 |
| 71 | Construction staking structure layout (structure) 01. B-37-468 (650.6501) | EACH | 1 | $2,700.00 | $2,700.00 | $2,700.00 | $2,700.00 | $2,700.00 |
| 72 | Construction staking supplemental control (project) 01. 6653-00-72 (650.9911) | EACH | 1 | $750.00 | $750.00 | $750.00 | $750.00 | $750.00 |
| 73 | Construction staking slope stakes (650.9920) | LF | 609 | $0.75 | $0.75 | $0.75 | $0.75 | $0.75 |
| 74 | Sawing asphalt (690.0150) | LF | 58 | $4.10 | $4.10 | $2.00 | $4.10 | $4.10 |
| 75 | Incentive strength concrete structures (715.0502) | DOL | 2,009 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 76 | Incentive compressive strength concrete pavement (715.0720) | DOL | 500 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 77 | Installing and maintaining bird deterrent system (station) 01. 13+61 (999.2000.S) | EACH | 1 | $1,600.00 | $0.01 | $1,000.00 | $3,000.00 | $0.01 |
| 78 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 1,200 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 |
| 79 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 600 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of January 14, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.