WisDOT contract 20250114033 bid tabulation

Galesville - Melrose; Wilson Cr & Mill Cr Br B270175,0235 (STH 054, Jackson County Galesville - Melrose). Let by Wisconsin DOT on January 14, 2025, Jackson. 4 bids received; low bid $2,794,848 by Lunda Construction Company.

Owner
Wisconsin DOT
Letting
14 JAN 2025
Pay items
118
Data through
10 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Lunda Construction Company$2,794,848Low
2Sheet Piling Services LLC$2,892,259+3.0%
3Kraemer North America, LLC$3,326,710+19%
4Zenith Tech., Inc. - Waukesha$4,024,391+44%
WisDOT contract 20250114033: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Lunda Construction Company2. Sheet Piling Services LLC3. Kraemer North America, LLC4. Zenith Tech., Inc. - Waukesha
1Clearing (201.0105)STA9$450.00$450.00$450.00$1,521.52
2Grubbing (201.0205)STA9$450.00$450.00$450.00$855.65
3Removing small pipe culverts (203.0100)EACH2$500.00$500.00$500.00$566.36
4Removing structure over waterway minimal debris (structure) 01. B-27- 0175 (203.0260)EACH1$175,000$250,000$250,000$148,000
5Removing structure over waterway minimal debris (structure) 02. B-27- 0235 (203.0260)EACH1$100,000$175,000$175,000$112,000
6Removing curb & gutter (204.0150)LF236$7.50$7.50$7.50$5.67
7Excavation common (205.0100)CY4,000$12.50$12.50$12.50$19.35
8Excavation for structures bridges (structure) 01. B-27-0175 (206.1001)EACH1$50,000$7,500.00$7,500.00$9,779.70
9Excavation for structures bridges (structure) 02. B-27-0235 (206.1001)EACH1$50,000$12,000$12,000$18,613
10Borrow (208.0100)CY10,000$15.50$15.50$15.50$24.10
11Backfill structure type A (210.1500)TON1,612$22.00$22.00$22.00$44.21
12Finishing roadway (project) 01. 7550-00-75 (213.0100)EACH1$500.00$500.00$500.00$2,350.00
13Base aggregate dense 3/4-inch (305.0110)TON455$29.00$29.00$29.00$32.64
14Base aggregate dense 1 1/4-inch (305.0120)TON3,210$21.50$21.50$21.50$19.53
15Concrete pavement 7-inch (415.0070)SY66$114.44$114.44$114.44$114.44
16Concrete pavement approach slab (415.0410)SY133$254.77$254.77$254.77$254.77
17Tack coat (455.0605)GAL188$4.48$4.48$4.48$4.48
18Asphaltic surface (465.0105)TON1,240$117.88$117.88$117.88$117.88
19Asphaltic surface detours (465.0115)TON50$251.06$251.06$251.06$251.06
20Asphaltic surface temporary (465.0125)TON500$119.27$119.27$119.27$119.27
21Concrete masonry bridges (502.0100)CY675$600.00$900.00$1,000.00$1,065.00
22Protective surface treatment (502.3200)SY841$3.00$3.00$3.00$4.00
23Pigmented surface sealer (502.3210)SY258$5.00$3.00$15.00$12.30
24Prestressed girder type I 36W-inch (503.0137)LF304$250.00$250.00$300.00$295.00
25Prestressed girder type I 72W-inch (503.0172)LF484$300.00$275.00$400.00$370.00
26Bar steel reinforcement HS structures (505.0400)LB15,500$1.25$1.00$1.40$1.20
27Bar steel reinforcement HS coated structures (505.0600)LB80,600$1.45$1.10$1.55$1.40
28Bearing pads elastomeric non- laminated (506.2605)EACH16$150.00$250.00$120.00$183.00
29Steel diaphragms (structure) 01. B- 27-0175 (506.4000)EACH6$2,000.00$3,000.00$2,800.00$2,650.00
30Steel diaphragms (structure) 02. B- 27-0235 (506.4000)EACH3$1,000.00$1,500.00$1,100.00$1,625.00
31Temporary shoring (structure) 01. B-27-0235 (511.1200)SF300$25.00$25.00$50.00$163.50
32Rubberized membrane waterproofing (516.0500)SY52$20.00$25.00$10.00$60.00
33Apron endwalls for culvert pipe 18- inch (520.1018)EACH2$265.00$265.00$265.00$393.32
34Apron endwalls for culvert pipe 24- inch (520.1024)EACH2$285.00$285.00$285.00$462.62
35Culvert pipe class III-B 18-inch (520.3518)LF54$40.00$40.00$40.00$49.01
36Culvert pipe class III-B 24-inch (520.3524)LF156$50.00$50.00$50.00$57.92
37Concrete collars for pipe (520.8000)EACH1$1,000.00$1,000.00$1,000.00$1,236.04
38Culvert pipe liners (size) 01. 30- inch (520.9700.S)LF58$168.00$168.00$168.00$231.00
39Cleaning culvert pipes for liner verification 01. 172+85 (520.9750.S)EACH1$400.00$400.00$400.00$1,800.00
40Temporary structure (station) 01. 3+50 (526.0101)EACH1$300,000$150,000$275,000$600,000
41Pre-boring rock or consolidated materials (550.0020)LF230$175.00$125.00$200.00$560.00
42Piling steel HP 10-inch X 42 LB (550.1100)LF300$40.00$45.00$75.00$80.00
43Piling cip concrete 10 3/4 X 0.365- inch (550.2106)LF2,480$45.00$44.00$65.00$55.00
44Concrete curb & gutter 30-inch type D (601.0411)LF126$39.19$39.19$39.19$39.19
45Concrete curb & gutter 4-inch sloped 30-inch type TBT (601.0584)LF181$39.19$39.19$39.19$39.19
46Concrete curb & gutter 4-inch sloped 36-inch type TBT (601.0588)LF39$89.08$89.08$89.08$89.08
47Concrete curb & gutter 4-inch sloped 36-inch type TBTT (601.0590)LF12$89.08$89.08$89.08$89.08
48Concrete surface drains (602.3010)CY4$1,490.66$1,490.66$1,490.66$1,490.66
49Concrete barrier temporary precast delivered (603.8000)LF210$10.00$20.00$21.00$21.00
50Concrete barrier temporary precast installed (603.8125)LF210$5.00$9.00$13.50$13.50
51Riprap medium (606.0200)CY17$110.00$110.00$110.00$100.06
52Riprap heavy (606.0300)CY690$70.00$70.00$70.00$80.61
53Reconstructing inlets (611.0430)EACH1$1,750.00$1,750.00$1,750.00$1,386.20
54Inlet covers type H-S (611.0639)EACH1$950.00$950.00$950.00$1,087.83
55Pipe underdrain wrapped 6-inch (612.0406)LF430$8.00$8.00$8.00$8.22
56Anchor assemblies for steel plate beam guard (614.0150)EACH8$200.00$500.00$30.93$300.00
57Steel thrie beam structure approach (614.0200)LF19$88.00$88.00$88.00$90.00
58Steel plate beam guard class A (614.0305)LF47$25.00$25.00$25.00$28.00
59Steel plate beam guard short radius (614.0345)LF32$30.00$30.00$30.00$28.00
60Steel plate beam guard short radius terminal (614.0390)EACH1$2,265.00$2,265.00$2,265.00$1,953.00
61Salvaged rail (614.0920)LF803$2.10$2.10$2.10$2.50
62MGS guardrail 3 (614.2300)LF525$21.25$21.25$21.25$25.00
63MGS thrie beam transition (614.2500)LF280$86.00$86.00$86.00$85.00
64MGS guardrail terminal eat (614.2610)EACH6$3,280.00$3,280.00$3,280.00$3,133.00
65Maintenance and repair of haul roads (project) 01. 7550-00-75 (618.0100)EACH1$0.01$0.01$1,000.00$3,150.00
66Mobilization (619.1000)EACH1$255,553$279,220$299,700$535,000
67Water (624.0100)MGAL30$25.00$25.00$25.00$42.92
68Salvaged topsoil (625.0500)SY5,980$1.25$1.25$1.25$1.77
69Silt fence (628.1504)LF2,150$1.80$1.80$1.50$1.75
70Silt fence maintenance (628.1520)LF1,075$0.01$0.01$0.10$0.03
71Mobilizations erosion control (628.1905)EACH7$200.00$200.00$100.00$153.00
72Mobilizations emergency erosion control (628.1910)EACH7$100.00$100.00$100.00$203.00
73Erosion mat class II type B (628.2023)SY5,980$1.75$1.75$1.75$2.25
74Turbidity barriers (628.6005)SY250$41.25$41.25$35.00$44.00
75Inlet protection type A (628.7005)EACH1$175.00$175.00$150.00$150.00
76Inlet protection type C (628.7015)EACH1$65.00$65.00$175.00$75.00
77Temporary ditch checks (628.7504)LF400$5.95$5.95$8.00$7.00
78Culvert pipe checks (628.7555)EACH11$18.00$18.00$25.00$50.00
79Rock bags (628.7570)EACH50$15.00$15.00$25.00$9.00
80Fertilizer type B (629.0210)CWT4$85.00$85.00$120.00$100.00
81Seeding mixture no. 20 (630.0120)LB160$8.50$8.50$6.00$9.00
82Seeding temporary (630.0200)LB70$3.20$3.20$5.00$7.00
83Seed water (630.0500)MGAL150$0.01$0.01$10.00$5.00
84Markers culvert end (633.5200)EACH4$53.00$53.00$40.00$75.00
85Posts wood 4X6-inch X 14-FT (634.0614)EACH10$82.00$82.00$110.00$95.00
86Signs type II reflective H (637.2210)SF34.36$20.00$20.00$30.00$30.00
87Field office type B (642.5001)EACH1$6,000.00$3,500.00$10,000$7,000.00
88Traffic control drums (643.0300)DAY5,000$0.23$0.23$0.23$0.23
89Traffic control barricades type III (643.0420)DAY3,000$0.67$0.67$0.67$0.67
90Traffic control warning lights type A (643.0705)DAY1,800$0.32$0.32$0.32$0.32
91Traffic control warning lights type C (643.0715)DAY1,800$0.19$0.19$0.19$0.19
92Traffic control signs (643.0900)DAY37,000$0.33$0.33$0.33$0.33
93Traffic control covering signs type II (643.0920)EACH15$41.36$41.36$41.36$41.36
94Temporary marking line paint 6- inch (643.3165)LF2,800$0.40$0.40$0.40$0.40
95Temporary marking line removable tape 6-inch (643.3180)LF1,400$1.67$1.67$1.67$1.67
96Temporary marking stop line removable tape 18-inch (643.3850)LF57$5.26$5.26$5.26$5.26
97Traffic control (643.5000)EACH1$12,214$12,214$12,214$12,214
98Geotextile type DF schedule A (645.0111)SY137$3.50$3.50$3.50$3.10
99Geotextile type HR (645.0120)SY1,158$3.50$3.50$3.50$2.50
100Marking line epoxy 6-inch (646.2020)LF1,838$1.50$0.86$0.86$0.86
101Marking line grooved wet ref epoxy 6-inch (646.2040)LF2,490$3.25$2.37$2.37$2.37
102Marking line same day epoxy 6- inch (646.4720)LF1,838$2.20$2.25$2.25$2.25
103Marking removal line 4-inch (646.9000)LF700$0.44$0.44$0.44$0.44
104Construction staking subgrade (650.4500)LF800$0.01$0.01$0.01$0.01
105Construction staking base (650.5000)LF800$0.75$0.75$0.75$0.75
106Construction staking curb gutter and curb & gutter (650.5500)LF305$2.00$2.00$2.00$2.00
107Construction staking pipe culverts (650.6000)EACH2$200.00$200.00$200.00$200.00
108Construction staking structure layout (structure) 01. B-27-0175 (650.6501)EACH1$2,250.00$2,250.00$2,250.00$2,250.00
109Construction staking structure layout (structure) 02. B-27-0235 (650.6501)EACH1$2,250.00$2,250.00$2,250.00$2,250.00
110Construction staking supplemental control (project) 01. 7550-00-75 (650.9911)EACH1$1,000.00$1,000.00$1,000.00$1,000.00
111Construction staking slope stakes (650.9920)LF1,150$0.75$0.75$0.75$0.75
112Temporary traffic signals for bridges (structure) 01. B-27-0235 (661.0101)EACH1$31,395$31,395$31,395$31,395
113Sawing asphalt (690.0150)LF120$2.95$2.95$4.00$2.95
114Incentive strength concrete structures 01. B-27-0175 (715.0502)DOL2,454$1.00$1.00$1.00$1.00
115Incentive strength concrete structures 02. B-27-0235 (715.0502)DOL1,596$1.00$1.00$1.00$1.00
116Incentive compressive strength concrete pavement (715.0720)DOL500$1.00$1.00$1.00$1.00
117Installing and maintaining bird deterrent system (station) 01. 170+50 (999.2000.S)EACH1$0.01$0.01$10,000$9,000.00
118Installing and maintaining bird deterrent system (station) 02. 210+50 (999.2000.S)EACH1$0.01$0.01$4,000.00$3,750.00
WisDOT contract 20250114033: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.

Every contract let that day: WisDOT letting of January 14, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy