WisDOT contract 20250114042 bid tabulation
1130-66-80. Let by Wisconsin DOT on January 14, 2025, Outagamie. 4 bids received; low bid $6,647,514 by Vinton Construction Company.
- Owner
- Wisconsin DOT
- Letting
- 14 JAN 2025
- Pay items
- 162
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Vinton Construction Company | $6,647,514 | Low |
| 2 | Lunda Construction Company | $6,704,542 | +1.0% |
| 3 | Sheet Piling Services LLC | $6,762,515 | +2.0% |
| 4 | Zenith Tech., Inc. - Waukesha | $7,807,387 | +17% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Vinton Construction Company | 2. Lunda Construction Company | 3. Sheet Piling Services LLC | 4. Zenith Tech., Inc. - Waukesha |
|---|---|---|---|---|---|---|---|
| 1 | Clearing (201.0105) | STA | 7 | $200.00 | $200.00 | $200.00 | $850.00 |
| 2 | Grubbing (201.0205) | STA | 7 | $200.00 | $200.00 | $200.00 | $250.00 |
| 3 | Removing small pipe culverts (203.0100) | EACH | 5 | $690.00 | $690.00 | $690.00 | $375.00 |
| 4 | Removing structure (structure) 01. B-44-33 (203.0220) | EACH | 1 | $330,000 | $542,000 | $200,000 | $250,000 |
| 5 | Removing structure (structure) 02. C-44-19 (203.0220) | EACH | 1 | $22,600 | $38,269 | $22,600 | $30,000 |
| 6 | Removing structure (structure) 03. B-44-34 (203.0220) | EACH | 1 | $330,000 | $542,000 | $200,000 | $250,000 |
| 7 | Removing asphaltic surface (204.0110) | SY | 220 | $10.00 | $10.00 | $10.00 | $17.00 |
| 8 | Removing asphaltic surface milling (204.0120) | SY | 1,780 | $4.50 | $4.50 | $4.50 | $4.50 |
| 9 | Removing curb & gutter (204.0150) | LF | 120 | $7.75 | $7.75 | $7.75 | $12.00 |
| 10 | Removing concrete barrier (204.0157) | LF | 210 | $30.00 | $30.00 | $40.00 | $30.17 |
| 11 | Removing guardrail (204.0165) | LF | 1,956 | $3.00 | $3.00 | $3.00 | $3.00 |
| 12 | Removing cable barrier (204.0167) | LF | 5,625 | $3.00 | $3.00 | $3.75 | $3.00 |
| 13 | Removing delineators and markers (204.0180) | EACH | 26 | $30.00 | $30.00 | $25.00 | $30.00 |
| 14 | Removing surface drains (204.0190) | EACH | 8 | $200.00 | $200.00 | $200.00 | $31.00 |
| 15 | Removing storm sewer (size) 01. 18-inch (204.0245) | LF | 160 | $13.00 | $13.00 | $13.00 | $16.00 |
| 16 | Removing (item description) 01. billboard sign (204.9060.S) | EACH | 1 | $1,120.00 | $1,120.00 | $1,120.00 | $5,000.00 |
| 17 | Excavation common (205.0100) | CY | 4,236 | $11.52 | $11.52 | $11.52 | $11.32 |
| 18 | Excavation for structures bridges (structure) 01. B-44-330 (206.1001) | EACH | 1 | $10,600 | $10,600 | $25,000 | $44,000 |
| 19 | Excavation for structures bridges (structure) 02. B-44-331 (206.1001) | EACH | 1 | $10,600 | $10,600 | $25,000 | $44,000 |
| 20 | Excavation for structures culverts (structure) 01. C-44-153 (206.2001) | EACH | 1 | $83,000 | $83,000 | $83,000 | $63,000 |
| 21 | Borrow (208.0100) | CY | 28,036 | $0.01 | $0.01 | $0.01 | $14.00 |
| 22 | Backfill structure type A (210.1500) | TON | 1,850 | $28.91 | $28.91 | $28.91 | $34.50 |
| 23 | Backfill structure type B (210.2500) | TON | 2,156 | $25.11 | $25.11 | $25.11 | $34.60 |
| 24 | Prepare foundation for asphaltic paving (project) 01. 1130-66-80 (211.0101) | EACH | 1 | $5,700.00 | $5,700.00 | $5,700.00 | $5,700.00 |
| 25 | Prepare foundation for asphaltic paving (project) 02. 1130-66-81 (211.0101) | EACH | 1 | $5,700.00 | $5,700.00 | $5,700.00 | $5,700.00 |
| 26 | Prepare foundation for concrete pavement (project) 01. 1130-66-80 (211.0201) | EACH | 1 | $1,000.00 | $1,000.00 | $1,000.00 | $2,500.00 |
| 27 | Prepare foundation for concrete pavement (project) 02. 1130-66-81 (211.0201) | EACH | 1 | $1,000.00 | $1,000.00 | $1,000.00 | $2,500.00 |
| 28 | Prepare foundation for asphaltic shoulders (211.0400) | STA | 43 | $150.00 | $150.00 | $150.00 | $150.00 |
| 29 | Finishing roadway (project) 01. 1130-66-80 (213.0100) | EACH | 1 | $2,500.00 | $2,500.00 | $0.01 | $500.00 |
| 30 | Finishing roadway (project) 02. 1130-66-81 (213.0100) | EACH | 1 | $2,500.00 | $2,500.00 | $0.01 | $500.00 |
| 31 | Base aggregate dense 3/4-inch (305.0110) | TON | 540 | $44.78 | $44.78 | $44.78 | $32.00 |
| 32 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 2,840 | $12.33 | $12.33 | $12.33 | $14.90 |
| 33 | Select crushed material (312.0110) | TON | 4,955 | $16.65 | $16.65 | $16.65 | $14.90 |
| 34 | Concrete pavement 8-inch (415.0080) | SY | 4,665 | $64.99 | $64.99 | $64.99 | $61.54 |
| 35 | Concrete pavement approach slab (415.0410) | SY | 216 | $225.00 | $225.00 | $225.00 | $204.87 |
| 36 | Concrete pavement joint filling (415.4100) | SY | 5,095 | $1.89 | $1.89 | $1.89 | $6.95 |
| 37 | HMA cold weather paving (450.4000) | TON | 370 | $10.35 | $10.35 | $10.35 | $10.35 |
| 38 | Tack coat (455.0605) | GAL | 168 | $9.75 | $9.75 | $9.75 | $9.75 |
| 39 | Incentive density HMA pavement (460.2000) | DOL | 300 | $1.00 | $1.00 | $1.00 | $1.00 |
| 40 | HMA pavement 3 LT 58-28 S (460.5223) | TON | 80 | $184.10 | $184.10 | $184.10 | $184.10 |
| 41 | HMA pavement 4 LT 58-28 S (460.5224) | TON | 380 | $189.90 | $189.90 | $189.90 | $189.90 |
| 42 | Asphaltic flumes (465.0315) | SY | 125 | $67.50 | $67.50 | $67.50 | $67.50 |
| 43 | Asphaltic rumble strips, shoulder divided roadway (465.0510) | LF | 3,900 | $1.85 | $1.85 | $1.85 | $1.85 |
| 44 | Ice hot weather concreting (501.1000.S) | LB | 8,150 | $0.01 | $0.01 | $0.25 | $0.79 |
| 45 | Concrete masonry bridges (502.0100) | CY | 448 | $550.00 | $550.00 | $950.00 | $900.00 |
| 46 | Protective surface treatment (502.3200) | SY | 2,238 | $3.00 | $3.00 | $3.00 | $4.00 |
| 47 | Pigmented surface sealer (502.3210) | SY | 1,128 | $2.00 | $2.00 | $3.00 | $13.00 |
| 48 | Prestressed girder type I 45W-inch (503.0146) | LF | 1,433 | $286.00 | $286.00 | $250.00 | $220.00 |
| 49 | Prestressed girder type I 54W-inch (503.0155) | LF | 1,024 | $302.00 | $302.00 | $275.00 | $240.00 |
| 50 | Concrete masonry culverts (504.0100) | CY | 15 | $550.00 | $550.00 | $950.00 | $1,800.00 |
| 51 | Precast concrete wingwalls (structure) 01. C-44-153 (504.1001.S) | EACH | 4 | $0.01 | $0.01 | $0.01 | $7,000.00 |
| 52 | Precast concrete box culvert (FT X FT) 01. 12 FT X 5 FT (504.2000.S) | LF | 168 | $1,740.00 | $1,740.00 | $1,740.00 | $2,150.00 |
| 53 | Bar steel reinforcement HS structures (505.0400) | LB | 21,690 | $0.90 | $0.90 | $1.20 | $1.15 |
| 54 | Bar steel reinforcement HS coated structures (505.0600) | LB | 257,760 | $1.00 | $1.00 | $1.25 | $1.15 |
| 55 | Bearing pads elastomeric non- laminated (506.2605) | EACH | 48 | $150.00 | $150.00 | $125.00 | $170.00 |
| 56 | Steel diaphragms (structure) 01. B- 44-330 (506.4000) | EACH | 24 | $750.00 | $750.00 | $750.00 | $800.00 |
| 57 | Steel diaphragms (structure) 02. B- 44-331 (506.4000) | EACH | 16 | $1,750.00 | $1,750.00 | $1,300.00 | $1,500.00 |
| 58 | Temporary shoring (structure) 01. B-44-330 (511.1200) | SF | 486 | $0.01 | $0.01 | $45.00 | $40.00 |
| 59 | Temporary shoring (structure) 02. B-44.331 (511.1200) | SF | 486 | $0.01 | $0.01 | $45.00 | $40.00 |
| 60 | Temporary shoring (structure) 02. C-44-153 (511.1200) | SF | 400 | $0.01 | $0.01 | $0.01 | $70.00 |
| 61 | Railing tubular screening (513.4091) | LF | 964 | $224.50 | $224.50 | $215.00 | $250.00 |
| 62 | Rubberized membrane waterproofing (516.0500) | SY | 87 | $25.00 | $25.00 | $18.00 | $65.00 |
| 63 | Concrete collars for pipe (520.8000) | EACH | 4 | $615.00 | $615.00 | $615.00 | $550.00 |
| 64 | Culvert pipe corrugated steel 18- inch (521.3118) | LF | 160 | $73.70 | $73.70 | $73.70 | $123.00 |
| 65 | Culvert pipe reinforced concrete class IV 36-inch (522.0436) | LF | 383 | $227.00 | $227.00 | $227.00 | $197.00 |
| 66 | Apron endwalls for culvert pipe reinforced concrete 12-inch (522.1012) | EACH | 10 | $1,130.00 | $1,130.00 | $1,130.00 | $1,276.00 |
| 67 | Apron endwalls for culvert pipe reinforced concrete 36-inch (522.1036) | EACH | 2 | $3,500.00 | $3,500.00 | $3,500.00 | $4,160.00 |
| 68 | Pre-boring unconsolidated materials (550.0010) | LF | 161 | $0.01 | $0.01 | $35.00 | $300.00 |
| 69 | Piling steel HP 12-inch X 53 LB (550.1120) | LF | 5,160 | $42.00 | $42.00 | $40.00 | $45.00 |
| 70 | Concrete curb integral type D (601.0150) | LF | 2,015 | $20.00 | $20.00 | $20.00 | $20.00 |
| 71 | Concrete sidewalk 4-inch (602.0405) | SF | 15,604 | $6.45 | $6.45 | $6.45 | $6.25 |
| 72 | Concrete surface drains (602.3010) | CY | 20 | $0.01 | $0.01 | $0.01 | $750.00 |
| 73 | Concrete barrier type S42 (603.1142) | LF | 464 | $300.00 | $300.00 | $300.00 | $239.00 |
| 74 | Concrete barrier temporary precast delivered (603.8000) | LF | 7,400 | $15.00 | $12.00 | $13.00 | $15.00 |
| 75 | Concrete barrier temporary precast installed (603.8125) | LF | 8,600 | $3.00 | $3.00 | $3.00 | $2.00 |
| 76 | Anchoring concrete barrier temporary precast (603.8500) | LF | 1,200 | $10.00 | $9.25 | $20.00 | $7.00 |
| 77 | Slope paving concrete (604.0400) | SY | 708 | $90.00 | $90.00 | $90.00 | $90.00 |
| 78 | Slope paving select crushed material (604.0600) | SY | 208 | $30.00 | $30.00 | $38.00 | $30.00 |
| 79 | Riprap medium (606.0200) | CY | 456 | $79.40 | $79.40 | $79.40 | $84.00 |
| 80 | Riprap heavy (606.0300) | CY | 34 | $90.00 | $90.00 | $90.00 | $105.00 |
| 81 | Storm sewer pipe reinforced concrete class III 12-inch (608.0312) | LF | 178 | $91.80 | $91.80 | $91.80 | $72.00 |
| 82 | Inlet covers type H (611.0624) | EACH | 10 | $725.00 | $725.00 | $725.00 | $770.00 |
| 83 | Inlets 2X3-FT (611.3230) | EACH | 10 | $2,300.00 | $2,300.00 | $2,300.00 | $2,636.00 |
| 84 | Pipe underdrain wrapped 6-inch (612.0406) | LF | 1,180 | $13.85 | $13.85 | $13.85 | $17.25 |
| 85 | Anchorages for steel plate beam guard type 2 (614.0115) | EACH | 4 | $2,500.00 | $2,500.00 | $250.00 | $2,500.00 |
| 86 | Steel plate beam guard class A (614.0305) | LF | 356 | $28.00 | $28.00 | $30.00 | $28.00 |
| 87 | Adjusting steel plate beam guard (614.0400) | LF | 1,413 | $15.00 | $15.00 | $15.00 | $15.00 |
| 88 | Crash cushions temporary (614.0905) | EACH | 8 | $5,500.00 | $3,750.00 | $3,750.00 | $7,500.00 |
| 89 | MGS guardrail 3 (614.2300) | LF | 1,554 | $29.00 | $29.00 | $30.00 | $29.00 |
| 90 | MGS guardrail terminal eat (614.2610) | EACH | 4 | $4,850.00 | $4,850.00 | $4,200.00 | $4,850.00 |
| 91 | MGS guardrail terminal type 2 (614.2620) | EACH | 4 | $3,850.00 | $3,850.00 | $2,750.00 | $3,850.00 |
| 92 | Fence chain link salvaged 5-FT (616.0405) | LF | 705 | $10.00 | $10.00 | $15.00 | $10.00 |
| 93 | Fence chain link salvaged 8-FT (616.0408) | LF | 300 | $10.00 | $10.00 | $20.00 | $10.00 |
| 94 | Fence safety (616.0700.S) | LF | 300 | $9.00 | $9.00 | $4.75 | $9.00 |
| 95 | Maintenance and repair of haul roads (project) 01. 1130-66-80 (618.0100) | EACH | 1 | $0.01 | $0.01 | $0.01 | $250.00 |
| 96 | Maintenance and repair of haul roads (project) 02. 1130-66-81 (618.0100) | EACH | 1 | $0.01 | $0.01 | $0.01 | $250.00 |
| 97 | Mobilization (619.1000) | EACH | 1 | $1,017,000 | $659,621 | $708,850 | $840,000 |
| 98 | Water (624.0100) | MGAL | 185 | $0.01 | $0.01 | $0.01 | $65.00 |
| 99 | Topsoil (625.0100) | SY | 6,205 | $1.87 | $1.87 | $1.87 | $4.75 |
| 100 | Salvaged topsoil (625.0500) | SY | 20,000 | $1.87 | $1.87 | $1.87 | $2.75 |
| 101 | Silt fence (628.1504) | LF | 3,925 | $2.00 | $2.00 | $2.50 | $2.00 |
| 102 | Silt fence maintenance (628.1520) | LF | 7,850 | $0.01 | $0.01 | $0.01 | $0.01 |
| 103 | Mobilizations erosion control (628.1905) | EACH | 16 | $1.00 | $1.00 | $100.00 | $1.00 |
| 104 | Mobilizations emergency erosion control (628.1910) | EACH | 10 | $1.00 | $1.00 | $100.00 | $1.00 |
| 105 | Erosion mat class I type A (628.2002) | SY | 26,205 | $1.65 | $1.65 | $1.10 | $1.65 |
| 106 | Inlet protection type A (628.7005) | EACH | 11 | $50.00 | $50.00 | $75.00 | $50.00 |
| 107 | Inlet protection type C (628.7015) | EACH | 10 | $200.00 | $200.00 | $75.00 | $200.00 |
| 108 | Temporary ditch checks (628.7504) | LF | 525 | $5.00 | $5.00 | $10.00 | $5.00 |
| 109 | Stone ditch checks (628.7515.S) | CY | 65 | $80.00 | $80.00 | $80.00 | $80.00 |
| 110 | Culvert pipe checks (628.7555) | EACH | 75 | $8.00 | $8.00 | $18.00 | $8.00 |
| 111 | Tracking pads (628.7560) | EACH | 4 | $0.01 | $0.01 | $0.01 | $3,200.00 |
| 112 | Rock bags (628.7570) | EACH | 280 | $8.00 | $8.00 | $18.00 | $8.00 |
| 113 | Fertilizer type B (629.0210) | CWT | 17 | $150.00 | $150.00 | $85.00 | $150.00 |
| 114 | Seeding mixture no. 30 (630.0130) | LB | 1,205 | $8.00 | $8.00 | $9.95 | $8.00 |
| 115 | Seeding borrow pit (630.0300) | LB | 80 | $8.00 | $8.00 | $9.95 | $8.00 |
| 116 | Seed water (630.0500) | MGAL | 625 | $0.01 | $0.01 | $20.00 | $0.01 |
| 117 | Markers culvert end (633.5200) | EACH | 12 | $85.00 | $85.00 | $65.00 | $85.00 |
| 118 | Posts wood 4X6-inch X 16-FT (634.0616) | EACH | 1 | $250.00 | $250.00 | $125.00 | $250.00 |
| 119 | Signs type II reflective F (637.2230) | SF | 6.25 | $50.00 | $50.00 | $35.00 | $50.00 |
| 120 | Moving signs type II (638.2102) | EACH | 6 | $200.00 | $200.00 | $250.00 | $200.00 |
| 121 | Removing signs type II (638.2602) | EACH | 6 | $50.00 | $50.00 | $40.00 | $50.00 |
| 122 | Removing small sign supports (638.3000) | EACH | 6 | $100.00 | $100.00 | $40.00 | $100.00 |
| 123 | Moving small sign supports (638.4000) | EACH | 10 | $50.00 | $50.00 | $100.00 | $50.00 |
| 124 | Traffic control drums (643.0300) | DAY | 25,220 | $0.20 | $0.20 | $0.20 | $0.20 |
| 125 | Traffic control barricades type III (643.0420) | DAY | 8,456 | $0.60 | $0.60 | $0.60 | $0.60 |
| 126 | Traffic control warning lights type A (643.0705) | DAY | 16,762 | $0.15 | $0.15 | $0.15 | $0.15 |
| 127 | Traffic control warning lights type C (643.0715) | DAY | 2,850 | $0.40 | $0.40 | $0.40 | $0.40 |
| 128 | Traffic control arrow boards (643.0800) | DAY | 1,068 | $8.25 | $8.25 | $8.25 | $8.25 |
| 129 | Traffic control signs (643.0900) | DAY | 15,132 | $0.25 | $0.25 | $0.25 | $0.25 |
| 130 | Traffic control covering signs type II (643.0920) | EACH | 248 | $25.00 | $25.00 | $25.00 | $25.00 |
| 131 | Traffic control signs PCMS (643.1050) | DAY | 557 | $12.50 | $12.50 | $12.50 | $12.50 |
| 132 | Traffic control (643.5000) | EACH | 1 | $95,925 | $95,925 | $95,925 | $95,925 |
| 133 | Geotextile type C (645.0105) | SY | 859 | $3.00 | $3.00 | $3.00 | $2.75 |
| 134 | Geotextile type DF schedule A (645.0111) | SY | 208 | $3.00 | $3.00 | $3.00 | $6.50 |
| 135 | Geotextile type HR (645.0120) | SY | 1,407 | $4.00 | $4.00 | $4.00 | $6.55 |
| 136 | Geotextile type R (645.0130) | SY | 260 | $8.00 | $8.00 | $3.00 | $5.75 |
| 137 | Marking line epoxy 6-inch (646.2020) | LF | 7,000 | $0.95 | $0.95 | $0.95 | $0.95 |
| 138 | Marking line same day epoxy 4- inch (646.4520) | LF | 4,600 | $0.70 | $0.70 | $0.70 | $0.70 |
| 139 | Cold weather marking epoxy 4-inch (646.6464) | LF | 4,300 | $0.20 | $0.20 | $0.20 | $0.20 |
| 140 | Cold weather marking epoxy 6-inch (646.6466) | LF | 3,600 | $0.30 | $0.30 | $0.30 | $0.30 |
| 141 | Conduit rigid metallic 2-inch (652.0125) | LF | 48 | $165.00 | $165.00 | $165.00 | $165.00 |
| 142 | Conduit rigid nonmetallic schedule 40 2-inch (652.0225) | LF | 2,138 | $10.00 | $10.00 | $10.00 | $10.00 |
| 143 | Pull boxes non-conductive 24X42- inch (653.0164) | EACH | 8 | $1,950.00 | $1,950.00 | $1,950.00 | $1,950.00 |
| 144 | Junction boxes 18X12X6-inch (653.0222) | EACH | 2 | $1,950.00 | $1,950.00 | $1,950.00 | $1,950.00 |
| 145 | Concrete bases type 5 (654.0105) | EACH | 8 | $1,750.00 | $1,750.00 | $1,750.00 | $1,750.00 |
| 146 | Sawing asphalt (690.0150) | LF | 450 | $2.99 | $2.25 | $1.15 | $1.15 |
| 147 | Incentive strength concrete structures (715.0502) | DOL | 9,294 | $1.00 | $1.00 | $1.00 | $1.00 |
| 148 | Incentive strength concrete barrier (715.0603) | DOL | 232 | $1.00 | $1.00 | $1.00 | $1.00 |
| 149 | Incentive compressive strength concrete pavement (715.0720) | DOL | 1,465 | $1.00 | $1.00 | $1.00 | $1.00 |
| 150 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 2,400 | $5.00 | $5.00 | $5.00 | $5.00 |
| 151 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 2,100 | $5.00 | $5.00 | $5.00 | $5.00 |
| 152 | Special 01. HPC masonry structures (SPV.0035) | CY | 1,086 | $550.00 | $550.00 | $950.00 | $1,000.00 |
| 153 | Special 01. existing footing opening (efo) (SPV.0060) | EACH | 16 | $250.00 | $250.00 | $500.00 | $1,250.00 |
| 154 | Special 02. covering and locating storm sewer (SPV.0060) | EACH | 2 | $950.00 | $950.00 | $950.00 | $300.00 |
| 155 | Special 03. emergency response to traffic involving concrete barrier temporary (SPV.0060) | EACH | 10 | $0.01 | $325.00 | $2,000.00 | $1,950.80 |
| 156 | Special 04. emergency response to traffic involving crash cushion temporary (SPV.0060) | EACH | 10 | $325.00 | $325.00 | $325.00 | $325.00 |
| 157 | Special 05. construction staking survey project 1130-66-80 (SPV.0060) | EACH | 1 | $9,950.00 | $9,950.00 | $9,950.00 | $9,950.00 |
| 158 | Special 06. construction staking survey project 1130-66-81 (SPV.0060) | EACH | 1 | $9,950.00 | $9,950.00 | $9,950.00 | $9,950.00 |
| 159 | Special 07. temporary water diversion C-44-153 (SPV.0060) | EACH | 1 | $27,000 | $27,000 | $27,000 | $95,000 |
| 160 | Special 01. street sweeping (SPV.0075) | HRS | 70 | $0.01 | $0.01 | $150.00 | $225.00 |
| 161 | Special 01. longitudinal grooving bridge deck (SPV.0165) | SF | 14,868 | $0.77 | $1.37 | $0.77 | $0.74 |
| 162 | Special 01. external joint sealer (SPV.0180) | SY | 168 | $50.00 | $50.00 | $50.00 | $150.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of January 14, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.