WisDOT contract 20250211009 bid tabulation
T Primrose - T Springdale (CTH G); W Br Sugar River Bridge B-13-0903 (CTH G, Dane County T Primrose - T Springdale). Let by Wisconsin DOT on February 11, 2025, Dane. 4 bids received; low bid $901,300 by R.G. Huston Company, Inc..
- Owner
- Wisconsin DOT
- Letting
- 11 FEB 2025
- Pay items
- 68
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | R.G. Huston Company, Inc. | $901,300 | Low |
| 2 | Sheet Piling Services LLC | $1,074,163 | +19% |
| 3 | Concrete Structures, Inc. | $1,178,211 | +31% |
| 4 | Lunda Construction Company | $1,266,424 | +41% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. R.G. Huston Company, Inc. | 2. Sheet Piling Services LLC | 3. Concrete Structures, Inc. | 4. Lunda Construction Company |
|---|---|---|---|---|---|---|---|
| 1 | Removing structure over waterway remove debris (structure) 02. B-13- 0039 (203.0250) | EACH | 1 | $49,400 | $170,000 | $75,000 | $150,000 |
| 2 | Removing guardrail (204.0165) | LF | 169 | $6.00 | $6.00 | $5.00 | $5.00 |
| 3 | Removing delineators and markers (204.0180) | EACH | 4 | $25.00 | $25.00 | $30.00 | $30.00 |
| 4 | Excavation common (205.0100) | CY | 416 | $14.00 | $12.00 | $12.00 | $12.00 |
| 5 | Excavation for structures bridges (structure) 02. B-13-0903 (206.1001) | EACH | 1 | $15,800 | $5,500.00 | $63,000 | $5,500.00 |
| 6 | Borrow (208.0100) | CY | 930 | $24.20 | $13.00 | $13.00 | $13.00 |
| 7 | Backfill structure type A (210.1500) | TON | 430 | $26.30 | $25.00 | $25.00 | $25.00 |
| 8 | Finishing roadway (project) 02. 5889-00-74 (213.0100) | EACH | 1 | $1,400.00 | $500.00 | $500.00 | $500.00 |
| 9 | Base aggregate dense 3/4-inch (305.0110) | TON | 140 | $25.40 | $23.00 | $23.00 | $23.00 |
| 10 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 1,010 | $21.60 | $18.50 | $18.50 | $18.50 |
| 11 | Concrete pavement 12-inch (415.0120) | SY | 40 | $151.52 | $150.00 | $275.00 | $150.00 |
| 12 | Concrete pavement approach slab (415.0410) | SY | 74 | $252.53 | $250.00 | $275.00 | $250.00 |
| 13 | Tack coat (455.0605) | GAL | 112 | $0.10 | $0.10 | $0.10 | $0.10 |
| 14 | Incentive density HMA pavement (460.2000) | DOL | 290 | $1.00 | $1.00 | $1.00 | $1.00 |
| 15 | HMA pavement 3 LT 58-28 S (460.5223) | TON | 243 | $91.00 | $91.00 | $91.00 | $91.00 |
| 16 | HMA pavement 4 LT 58-28 S (460.5224) | TON | 199 | $94.00 | $94.00 | $94.00 | $94.00 |
| 17 | Concrete masonry bridges (502.0100) | CY | 384.60 | $792.00 | $1,050.00 | $950.00 | $950.00 |
| 18 | Protective surface treatment (502.3200) | SY | 440 | $6.00 | $2.50 | $7.00 | $5.00 |
| 19 | Bar steel reinforcement HS structures (505.0400) | LB | 9,780 | $1.21 | $1.20 | $1.10 | $1.00 |
| 20 | Bar steel reinforcement HS coated structures (505.0600) | LB | 37,500 | $1.27 | $1.30 | $1.00 | $1.10 |
| 21 | Railing tubular type M (513.4061) | LF | 177 | $265.00 | $260.00 | $248.00 | $250.00 |
| 22 | Rubberized membrane waterproofing (516.0500) | SY | 32 | $35.00 | $18.00 | $37.00 | $25.00 |
| 23 | Pre-boring rock or consolidated materials (550.0020) | LF | 676 | $91.50 | $50.00 | $105.00 | $75.00 |
| 24 | Piling steel HP 10-inch X 42 LB (550.1100) | LF | 970 | $44.70 | $45.00 | $45.00 | $40.00 |
| 25 | Riprap heavy (606.0300) | CY | 160 | $80.00 | $69.00 | $69.00 | $69.00 |
| 26 | Pipe underdrain wrapped 6-inch (612.0406) | LF | 210 | $6.00 | $9.00 | $9.00 | $9.00 |
| 27 | MGS guardrail 3 (614.2300) | LF | 237.50 | $31.00 | $31.00 | $32.50 | $32.50 |
| 28 | MGS thrie beam transition (614.2500) | LF | 150 | $90.00 | $90.00 | $92.00 | $92.00 |
| 29 | MGS guardrail terminal eat (614.2610) | EACH | 4 | $4,000.00 | $4,000.00 | $3,750.00 | $3,750.00 |
| 30 | Maintenance and repair of haul roads (project) 02. 5889-00-74 (618.0100) | EACH | 1 | $100.00 | $0.01 | $1,000.00 | $1.00 |
| 31 | Mobilization (619.1000) | EACH | 1 | $81,498 | $73,700 | $215,200 | $316,441 |
| 32 | Dust control surface treatment (623.0200) | SY | 2,246 | $0.01 | $0.01 | $1.00 | $0.01 |
| 33 | Water (624.0100) | MGAL | 17 | $75.00 | $0.01 | $0.01 | $0.01 |
| 34 | Salvaged topsoil (625.0500) | SY | 1,840 | $2.20 | $2.50 | $2.50 | $2.50 |
| 35 | Silt fence (628.1504) | LF | 1,085 | $2.25 | $2.25 | $2.50 | $2.50 |
| 36 | Silt fence maintenance (628.1520) | LF | 2,165 | $0.01 | $0.01 | $0.05 | $0.05 |
| 37 | Mobilizations erosion control (628.1905) | EACH | 4 | $100.00 | $100.00 | $250.00 | $250.00 |
| 38 | Mobilizations emergency erosion control (628.1910) | EACH | 4 | $100.00 | $100.00 | $300.00 | $300.00 |
| 39 | Erosion mat urban class I type B (628.2008) | SY | 2,025 | $2.50 | $2.50 | $1.85 | $1.85 |
| 40 | Erosion mat class II type C (628.2027) | SY | 300 | $4.50 | $4.50 | $3.50 | $3.50 |
| 41 | Turbidity barriers (628.6005) | SY | 290 | $0.01 | $55.00 | $65.00 | $65.00 |
| 42 | Fertilizer type B (629.0210) | CWT | 1.50 | $200.00 | $200.00 | $100.00 | $100.00 |
| 43 | Seeding mixture no. 70 (630.0170) | LB | 8 | $250.00 | $250.00 | $100.00 | $100.00 |
| 44 | Seeding temporary (630.0200) | LB | 62 | $4.00 | $4.00 | $3.50 | $3.50 |
| 45 | Seed water (630.0500) | MGAL | 53 | $10.00 | $10.00 | $25.00 | $25.00 |
| 46 | Posts wood 4X6-inch X 14-FT (634.0614) | EACH | 4 | $100.00 | $100.00 | $75.00 | $75.00 |
| 47 | Signs type II reflective F (637.2230) | SF | 12 | $25.00 | $25.00 | $35.00 | $35.00 |
| 48 | Removing signs type II (638.2602) | EACH | 8 | $40.00 | $40.00 | $35.00 | $35.00 |
| 49 | Removing small sign supports (638.3000) | EACH | 6 | $40.00 | $40.00 | $35.00 | $35.00 |
| 50 | Field office type B (642.5001) | EACH | 1 | $1,100.00 | $3,000.00 | $1,500.00 | $4,000.00 |
| 51 | Traffic control barricades type III (643.0420) | DAY | 1,800 | $1.00 | $1.00 | $0.60 | $0.60 |
| 52 | Traffic control warning lights type A (643.0705) | DAY | 2,160 | $0.20 | $0.20 | $0.15 | $0.15 |
| 53 | Traffic control signs (643.0900) | DAY | 9,990 | $0.25 | $0.25 | $0.22 | $0.22 |
| 54 | Traffic control (643.5000) | EACH | 1 | $3,000.00 | $3,000.00 | $7,450.00 | $7,450.00 |
| 55 | Geotextile type DF schedule A (645.0111) | SY | 130 | $2.40 | $7.00 | $7.00 | $7.00 |
| 56 | Geotextile type HR (645.0120) | SY | 350 | $3.80 | $6.00 | $6.00 | $6.00 |
| 57 | Marking line paint 6-inch (646.2005) | LF | 2,100 | $1.90 | $1.90 | $1.50 | $1.50 |
| 58 | Construction staking subgrade (650.4500) | LF | 440 | $0.01 | $0.01 | $0.01 | $0.01 |
| 59 | Construction staking base (650.5000) | LF | 440 | $1.30 | $1.30 | $0.01 | $1.50 |
| 60 | Construction staking structure layout (structure) 02. B-13-0903 (650.6501) | EACH | 1 | $2,800.00 | $2,800.00 | $3,000.00 | $3,000.00 |
| 61 | Construction staking supplemental control (project) 02. 5889-00-74 (650.9911) | EACH | 1 | $500.00 | $500.00 | $1,000.00 | $500.00 |
| 62 | Construction staking slope stakes (650.9920) | LF | 440 | $1.30 | $1.30 | $0.01 | $1.50 |
| 63 | Sawing asphalt (690.0150) | LF | 56 | $2.95 | $2.95 | $4.00 | $4.00 |
| 64 | Incentive strength concrete structures (715.0502) | DOL | 2,308 | $1.00 | $1.00 | $1.00 | $1.00 |
| 65 | Incentive compressive strength concrete pavement (715.0720) | DOL | 500 | $1.00 | $1.00 | $1.00 | $1.00 |
| 66 | Maintaining bird deterrent system (station) 02. 10+00 (999.2005.S) | EACH | 1 | $1.00 | $0.01 | $500.00 | $1.00 |
| 67 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 1,200 | $5.00 | $5.00 | $5.00 | $5.00 |
| 68 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 600 | $5.00 | $5.00 | $5.00 | $5.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of February 11, 2025. Compiled by Mirage Metrics.