WisDOT contract 20250211020 bid tabulation
C Milwaukee - E Mason Street; Over Lincoln Memorial Dr B-40-0524 (LOC STR, Milwaukee County C Milwaukee - E Mason Street). Let by Wisconsin DOT on February 11, 2025, Milwaukee. 4 bids received; low bid $1,085,373 by Lunda Construction Company.
- Owner
- Wisconsin DOT
- Letting
- 11 FEB 2025
- Pay items
- 72
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Lunda Construction Company | $1,085,373 | Low |
| 2 | Kraemer North America, LLC | $1,179,130 | +9.0% |
| 3 | Norcon Corporation | $1,215,885 | +12% |
| 4 | Zenith Tech., Inc. - Waukesha | $1,294,060 | +19% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Lunda Construction Company | 2. Kraemer North America, LLC | 3. Norcon Corporation | 4. Zenith Tech., Inc. - Waukesha |
|---|---|---|---|---|---|---|---|
| 1 | Debris containment (structure) 01. B-40-0524 (203.0330) | EACH | 1 | $15,000 | $26,000 | $14,600 | $1.00 |
| 2 | Removing asphaltic surface milling (204.0120) | SY | 731 | $12.00 | $12.00 | $12.00 | $12.00 |
| 3 | Removing curb & gutter (204.0150) | LF | 130 | $13.65 | $13.65 | $9.00 | $13.65 |
| 4 | Removing concrete sidewalk (204.0155) | SY | 158 | $10.00 | $10.00 | $13.00 | $10.00 |
| 5 | Prepare foundation for asphaltic paving (project) 01. 2984-15-78 (211.0101) | EACH | 1 | $5.00 | $10,000 | $5.00 | $5.00 |
| 6 | Finishing roadway (project) 01. 2984-15-78 (213.0100) | EACH | 1 | $100.00 | $1,000.00 | $3,700.00 | $500.00 |
| 7 | Base aggregate dense 3/4-inch (305.0110) | TON | 28 | $75.00 | $75.00 | $53.00 | $75.00 |
| 8 | Tack coat (455.0605) | GAL | 44 | $3.00 | $3.00 | $3.00 | $3.00 |
| 9 | Incentive density HMA pavement (460.2000) | DOL | 130 | $1.00 | $1.00 | $1.00 | $1.00 |
| 10 | HMA pavement 4 LT 58-28 S (460.5224) | TON | 198 | $130.00 | $130.00 | $130.00 | $130.00 |
| 11 | Bridge deck crack sealing (502.0180.S) | LF | 1,200 | $10.00 | $10.00 | $6.75 | $3.00 |
| 12 | Compression joint sealer preformed elastomeric (width) 01. 2-1/4 inch (502.2000) | LF | 10 | $250.00 | $300.00 | $385.00 | $200.00 |
| 13 | Compression joint sealer preformed elastomeric (width) 02. 2-2/4 inch (502.2000) | LF | 10 | $250.00 | $300.00 | $385.00 | $200.00 |
| 14 | Expansion device (502.3101) | LF | 304 | $350.00 | $500.00 | $427.00 | $400.00 |
| 15 | Protective surface treatment reseal (502.3215) | SY | 7,994 | $6.00 | $5.00 | $2.85 | $7.00 |
| 16 | Adhesive anchors no. 5 bar (502.4205) | EACH | 210 | $15.00 | $45.00 | $34.00 | $30.00 |
| 17 | Bar steel reinforcement HS coated structures (505.0600) | LB | 6,220 | $1.95 | $3.00 | $2.25 | $2.80 |
| 18 | Preparation decks type 1 (509.0301) | SY | 61 | $150.00 | $300.00 | $210.00 | $250.00 |
| 19 | Preparation decks type 2 (509.0302) | SY | 25 | $175.00 | $500.00 | $235.00 | $280.00 |
| 20 | Sawing pavement deck preparation areas (509.0310.S) | LF | 610 | $7.00 | $7.00 | $7.00 | $5.00 |
| 21 | Joint repair (509.1000) | SY | 148 | $910.00 | $1,000.00 | $1,810.00 | $2,300.00 |
| 22 | Concrete surface repair (509.1500) | SF | 110 | $120.00 | $200.00 | $215.00 | $225.00 |
| 23 | Full-depth deck repair (509.2000) | SY | 5 | $700.00 | $700.00 | $425.00 | $1,250.00 |
| 24 | Concrete masonry deck repair (509.2100.S) | CY | 52 | $300.00 | $1,000.00 | $1,340.00 | $800.00 |
| 25 | Concrete curb & gutter 31-inch (601.0331) | LF | 130 | $85.36 | $85.36 | $67.00 | $85.36 |
| 26 | Concrete sidewalk 6-inch (602.0415) | SF | 1,423 | $11.25 | $11.25 | $12.00 | $11.25 |
| 27 | Adjusting manhole covers (611.8110) | EACH | 1 | $4,000.00 | $4,000.00 | $750.00 | $4,000.00 |
| 28 | Maintenance and repair of haul roads (project) 01. 2984-15-78 (618.0100) | EACH | 1 | $1.00 | $1,000.00 | $5.00 | $500.00 |
| 29 | Mobilization (619.1000) | EACH | 1 | $207,579 | $117,525 | $197,827 | $250,000 |
| 30 | Water (624.0100) | MGAL | 0.63 | $1,000.00 | $1,000.00 | $200.00 | $1,000.00 |
| 31 | Mobilizations erosion control (628.1905) | EACH | 4 | $250.00 | $250.00 | $250.00 | $250.00 |
| 32 | Mobilizations emergency erosion control (628.1910) | EACH | 2 | $250.00 | $250.00 | $250.00 | $250.00 |
| 33 | Inlet protection type C (628.7015) | EACH | 8 | $75.00 | $75.00 | $75.00 | $75.00 |
| 34 | Posts wood 4X6-inch X 12-FT (634.0612) | EACH | 1 | $75.00 | $75.00 | $75.00 | $75.00 |
| 35 | Posts tubular steel 2X2-inch X 9.5- FT (634.0809) | EACH | 10 | $200.00 | $200.00 | $200.00 | $200.00 |
| 36 | Signs type II reflective H (637.2210) | SF | 50 | $35.00 | $35.00 | $35.00 | $35.00 |
| 37 | Signs type II reflective F (637.2230) | SF | 12 | $35.00 | $35.00 | $35.00 | $35.00 |
| 38 | Field office type C (642.5201) | EACH | 1 | $4,000.00 | $11,000 | $5,700.00 | $8,000.00 |
| 39 | Traffic control drums (643.0300) | DAY | 652 | $1.00 | $1.00 | $1.00 | $1.00 |
| 40 | Traffic control barricades type II (643.0410) | DAY | 1,358 | $1.00 | $1.00 | $0.42 | $1.00 |
| 41 | Traffic control barricades type III (643.0420) | DAY | 873 | $1.00 | $1.00 | $1.00 | $1.00 |
| 42 | Traffic control warning lights type A (643.0705) | DAY | 3,104 | $0.25 | $0.25 | $0.25 | $0.25 |
| 43 | Traffic control warning lights type C (643.0715) | DAY | 101 | $1.50 | $1.50 | $1.00 | $1.50 |
| 44 | Traffic control arrow boards (643.0800) | DAY | 12 | $25.00 | $25.00 | $30.00 | $25.00 |
| 45 | Traffic control signs (643.0900) | DAY | 4,111 | $1.50 | $1.50 | $0.25 | $1.50 |
| 46 | Traffic control signs fixed message (643.1000) | SF | 15 | $45.00 | $45.00 | $18.00 | $45.00 |
| 47 | Traffic control (643.5000) | EACH | 1 | $7,500.00 | $12,500 | $3,500.00 | $12,500 |
| 48 | Marking line epoxy 6-inch (646.2020) | LF | 7,036 | $1.10 | $1.10 | $1.10 | $1.10 |
| 49 | Marking line epoxy 8-inch (646.3020) | LF | 2,053 | $1.95 | $1.95 | $1.95 | $1.95 |
| 50 | Marking arrow epoxy (646.5020) | EACH | 6 | $180.00 | $180.00 | $180.00 | $180.00 |
| 51 | Marking symbol epoxy (646.5220) | EACH | 10 | $180.00 | $180.00 | $180.00 | $180.00 |
| 52 | Marking diagonal epoxy 6-inch (646.7020) | LF | 574 | $12.25 | $12.25 | $12.25 | $12.25 |
| 53 | Marking removal line water blasting 6-inch (646.9012) | LF | 7,491 | $0.65 | $0.65 | $0.45 | $0.65 |
| 54 | Marking removal special marking water blasting (646.9310) | EACH | 4 | $145.00 | $145.00 | $100.00 | $145.00 |
| 55 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 130 | $7.00 | $7.00 | $0.01 | $8.93 |
| 56 | Construction staking resurfacing reference (650.8000) | LF | 145 | $6.00 | $6.00 | $0.01 | $4.00 |
| 57 | Construction staking sidewalk (project) 01. 2984-15-78 (650.9500) | EACH | 1 | $3,000.00 | $3,000.00 | $0.01 | $1,015.00 |
| 58 | Construction staking supplemental control (project) 01. 2984-15-78 (650.9911) | EACH | 1 | $3,000.00 | $3,000.00 | $10,000 | $725.00 |
| 59 | Sawing asphalt (690.0150) | LF | 90 | $1.95 | $1.15 | $1.95 | $1.15 |
| 60 | Sawing concrete (690.0250) | LF | 60 | $2.95 | $2.25 | $2.95 | $2.25 |
| 61 | Installing and maintaining bird deterrent system (station) sta 15+63 (999.2000.S) | EACH | 1 | $0.01 | $0.01 | $100.00 | $1.00 |
| 62 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 400 | $5.00 | $5.00 | $5.00 | $5.00 |
| 63 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 2,700 | $5.00 | $5.00 | $5.00 | $5.00 |
| 64 | Special 01. removing and reinstalling flag pole (SPV.0060) | EACH | 4 | $1,500.00 | $700.00 | $425.00 | $3,000.00 |
| 65 | Special 02. cleaning and painting bearing (SPV.0060) | EACH | 4 | $2,000.00 | $1,500.00 | $4,500.00 | $1,500.00 |
| 66 | Special 03. clean drain systems (SPV.0060) | EACH | 5 | $800.00 | $7,000.00 | $1,100.00 | $500.00 |
| 67 | Special 04. partially remove existing cover plate (SPV.0060) | EACH | 1 | $1,200.00 | $2,000.00 | $3,000.00 | $1,000.00 |
| 68 | Special 05. embedded galvanic anodes (SPV.0060) | EACH | 305 | $14.00 | $30.00 | $37.00 | $45.00 |
| 69 | Special 01. reseal joints (SPV.0090) | LF | 238 | $28.00 | $90.00 | $23.00 | $12.00 |
| 70 | Special 01. high friction green surfacing (SPV.0165) | SF | 13,165 | $6.80 | $6.80 | $6.80 | $6.80 |
| 71 | Special 02. removing loose concrete (SPV.0165) | SF | 720 | $65.00 | $40.00 | $27.00 | $30.00 |
| 72 | Special 03. protective netting (SPV.0165) | SF | 23,840 | $7.27 | $7.00 | $5.55 | $3.80 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of February 11, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.