WisDOT contract 20250211031 bid tabulation

Appleton, STH 441; IH 41/USH 10 - S Oneida St (STH 441, Winnebago County Appleton, STH 441). Let by Wisconsin DOT on February 11, 2025, Winnebago. 5 bids received; low bid $7,422,298 by Zenith Tech., Inc. - Waukesha.

Owner
Wisconsin DOT
Letting
11 FEB 2025
Pay items
160
Data through
10 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Zenith Tech., Inc. - Waukesha$7,422,298Low
2Michels Road & Stone, Inc.$7,713,294+4.0%
3Vinton Construction Company$7,808,678+5.0%
4Zignego Company, Inc.$8,108,983+9.0%
5Lunda Construction Company$8,913,974+20%
WisDOT contract 20250211031: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Zenith Tech., Inc. - Waukesha2. Michels Road & Stone, Inc.3. Vinton Construction Company4. Zignego Company, Inc.5. Lunda Construction Company
1CPM progress schedule (108.4400)EACH1$10.00$1,500.00$2,000.00$1,000.00$12,000
2Removing structure (structure) 01. B-70-401 (203.0220)EACH1$8,640.28$6,000.00$8,507.11$8,507.11$20,000
3Removing structure (structure) 02. B-70-402 (203.0220)EACH1$18,493$11,000$18,206$18,206$30,000
4Removing structure (structure) 03. B-70-403 (203.0220)EACH1$32,905$25,000$32,395$32,395$55,000
5Removing structure (structure) 04. B-70-410 (203.0220)EACH1$36,993$27,000$36,420$36,420$65,000
6Removing structure (structure) 05. B-70-411 (203.0220)EACH1$34,509$26,000$33,974$33,974$60,000
7Removing structure (structure) 06. B-70-420 (203.0220)EACH1$31,309$25,000$30,823$30,823$55,000
8Removing structure (structure) 07. B-70-421 (203.0220)EACH1$25,631$25,000$25,234$25,234$40,000
9Removing concrete pavement (204.0100)SY16,748$22.60$22.60$9.85$15.50$22.60
10Removing asphaltic surface (204.0110)SY4,585$9.00$9.00$4.73$15.00$9.00
11Removing asphaltic surface milling (204.0120)SY160$15.00$15.00$15.00$15.00$15.00
12Removing concrete barrier (204.0157)LF1,527$30.00$30.00$11.70$40.00$30.00
13Removing guardrail (204.0165)LF876.35$3.50$2.85$2.85$2.85$3.50
14Removing surface drains (204.0190)EACH1$300.00$300.00$280.00$500.00$300.00
15Removing inlets (204.0220)EACH1$750.00$750.00$732.34$500.00$750.00
16Removing storm sewer (size) 01. 12-inch (204.0245)LF50$30.00$30.00$15.64$85.00$30.00
17Removing (item description) 01. temporary crash cushions (204.9060.S)EACH2$1,250.00$1,250.00$1,000.00$400.00$1,250.00
18Excavation common (205.0100)CY253$30.00$30.00$33.70$100.00$30.00
19Excavation for structures bridges (structure) 01. B-70-401 (206.1001)EACH1$1,500.00$1,500.00$4,279.74$4,279.74$1,500.00
20Excavation for structures bridges (structure) 02. B-70-402 (206.1001)EACH1$3,200.00$3,200.00$8,433.59$8,433.59$3,200.00
21Excavation for structures bridges (structure) 03. B-70-403 (206.1001)EACH1$7,600.00$7,600.00$16,552$16,552$7,600.00
22Excavation for structures bridges (structure) 04. B-70-410 (206.1001)EACH1$8,800.00$8,800.00$18,692$18,692$8,800.00
23Excavation for structures bridges (structure) 05. B-70-411 (206.1001)EACH1$8,300.00$8,300.00$17,119$17,119$8,300.00
24Excavation for structures bridges (structure) 06. B-70-420 (206.1001)EACH1$7,800.00$7,800.00$15,420$15,420$7,800.00
25Excavation for structures bridges (structure) 07. B-70-421 (206.1001)EACH1$8,200.00$8,200.00$12,336$12,336$8,200.00
26Backfill structure type B (210.2100)CY253$58.00$58.00$109.92$109.92$58.00
27Prepare foundation for concrete pavement (project) 01. 4685-34-71 (211.0201)EACH1$10,000$10,000$1,000.00$1.00$10,000
28Finishing roadway (project) 01. 4685-34-71 (213.0100)EACH1$2,632.39$7,500.00$5,000.00$1,000.00$5,000.00
29Base aggregate dense 3/4-inch (305.0110)TON170$66.00$66.00$51.00$100.00$66.00
30Base aggregate dense 1 1/4-inch (305.0120)TON4,588$19.30$19.30$0.01$20.00$19.30
31Concrete base 4-inch (320.0105)SY1,080$40.00$40.00$57.50$66.00$40.00
32Concrete base 8-inch (320.0145)SY500$52.65$52.65$79.67$80.00$52.65
33Concrete pavement hes 10-inch (415.1100)SY673$81.63$81.63$102.45$89.00$81.63
34Concrete pavement hes 11-inch (415.1110)SY15,301$90.36$90.36$102.45$84.00$90.36
35Concrete pavement approach slab hes (415.1410)SY3,316$175.47$200.01$235.00$206.00$200.01
36Drilled tie bars (416.0610)EACH1,202$9.64$9.64$9.00$15.00$9.64
37Drilled dowel bars (416.0620)EACH889$14.29$14.29$17.50$20.00$14.29
38HMA cold weather paving (450.4000)TON74$14.25$14.25$14.25$14.25$14.25
39Tack coat (455.0605)GAL118$8.75$8.75$8.75$8.75$8.75
40Incentive density HMA pavement (460.2000)DOL270$1.00$1.00$1.00$1.00$1.00
41HMA pavement 3 LT 58-28 S (460.5223)TON217$138.90$138.90$138.90$138.90$138.90
42HMA pavement 4 LT 58-28 S (460.5224)TON175$178.45$178.45$178.45$178.45$178.45
43Asphaltic flumes (465.0315)SY9$68.00$68.00$68.00$68.00$68.00
44Asphaltic rumble strips, shoulder divided roadway (465.0510)LF36,154$0.45$0.45$0.45$0.45$0.45
45Concrete masonry bridges (502.0100)CY1,297$451.95$509.28$509.28$509.28$650.00
46Protective surface treatment (502.3200)SY2,279$2.82$2.77$2.77$2.77$2.00
47Pigmented surface sealer reseal (502.3205)SY4,396$7.19$10.97$10.97$10.97$6.00
48Pigmented surface sealer (502.3210)SY274$7.02$28.71$28.71$28.71$3.00
49Adhesive anchors no. 4 bar (502.4204)EACH496$14.15$14.18$14.18$14.18$25.00
50Adhesive anchors no. 5 bar (502.4205)EACH278$14.14$14.17$25.00$14.17$38.00
51Bar steel reinforcement HS coated structures (505.0600)LB235,810$1.04$1.04$1.04$1.04$1.17
52Bar couplers no. 5 (505.0905)EACH588$47.17$47.17$47.17$47.17$52.25
53Bar couplers no. 8 (505.0908)EACH168$135.32$135.32$135.32$135.32$148.50
54Temporary shoring (structure) 01. B-70-401 (511.1200)SF55$252.59$248.05$248.05$248.05$25.00
55Concrete staining (structure) 01. B- 70-401 (517.1010.S)SF140$14.13$14.13$14.13$14.13$14.00
56Concrete staining (structure) 02. B- 70-402 (517.1010.S)SF247$14.13$14.13$14.13$14.13$14.00
57Concrete staining (structure) 03. B- 70-403 (517.1010.S)SF152$14.13$14.13$14.13$14.13$14.00
58Concrete staining (structure) 04. B- 70-411 (517.1010.S)SF166$14.13$14.13$14.13$14.13$14.00
59Concrete staining (structure) 05. B- 70-420 (517.1010.S)SF140$14.13$14.13$14.13$14.13$14.00
60Concrete staining (structure) 06. B- 70-421 (517.1010.S)SF140$14.13$14.13$14.13$14.13$14.00
61Concrete staining (structure) 07. concrete staining B-70-410 (517.1010.S)SF146$14.13$14.13$14.13$14.13$14.00
62Architectural surface treatment (structure) 01. B-70-401 (517.1050.S)SF92$9.87$9.69$9.69$9.69$20.00
63Architectural surface treatment (structure) 02. B-70-402 (517.1050.S)SF152$9.87$9.69$9.69$9.69$20.00
64Architectural surface treatment (structure) 03. B-70-403 (517.1050.S)SF100$9.87$9.69$9.69$9.69$20.00
65Architectural surface treatment (structure) 04. B-70-411 (517.1050.S)SF69$9.87$9.69$9.69$9.69$20.00
66Architectural surface treatment (structure) 05. B-70-420 (517.1050.S)SF100$9.87$9.69$9.69$9.69$20.00
67Architectural surface treatment (structure) 06. B-70-421 (517.1050.S)SF100$9.87$9.69$9.69$9.69$20.00
68Apron endwalls for culvert pipe 12- inch (520.1012)EACH1$880.00$880.00$479.55$1,500.00$880.00
69Culvert pipe class III-A 12-inch (520.3312)LF38$91.00$91.00$75.44$150.00$91.00
70Concrete surface drains (602.3010)CY19$561.47$875.00$250.00$1,000.00$950.00
71Concrete barrier temporary precast delivered (603.8000)LF16,862.50$19.31$18.96$18.96$18.96$12.00
72Concrete barrier temporary precast installed (603.8125)LF27,062.50$1.87$1.83$1.83$1.83$7.00
73Anchoring concrete barrier temporary precast (603.8500)LF19,993$7.00$6.88$6.88$6.88$6.00
74Anchoring concrete barrier temporary precast on bridge decks (603.8505)LF7,069.50$7.00$6.88$6.88$6.88$7.00
75Riprap medium (606.0200)CY40$225.00$145.00$96.16$200.00$145.00
76Inlet covers type V (611.0654)EACH1$950.00$950.00$717.40$1,200.00$950.00
77Inlets 2X2-FT (611.3220)EACH1$3,020.00$3,020.00$3,388.84$5,000.00$3,020.00
78Adjusting manhole covers (611.8110)EACH3$700.00$700.00$553.33$800.00$700.00
79Adjusting inlet covers (611.8115)EACH29$800.00$800.00$250.00$750.00$800.00
80Anchor assemblies for steel plate beam guard (614.0150)EACH8$278.80$273.78$273.78$273.78$150.00
81Crash cushions permanent (614.0800)EACH2$35,500$35,500$35,500$30,500$35,500
82Crash cushions temporary (614.0905)EACH22$3,450.00$3,450.00$3,450.00$3,200.00$3,450.00
83MGS guardrail 3 (614.2300)LF514$32.00$26.00$26.00$26.00$32.00
84MGS thrie beam transition (614.2500)LF362.75$98.00$93.00$93.00$93.00$98.00
85Maintenance and repair of haul roads (project) 01. 4685-34-71 (618.0100)EACH1$100.00$1.00$0.01$1,200.00$250.00
86Mobilization (619.1000)EACH1$706,436$516,990$522,000$591,000$1,316,852
87Water (624.0100)MGAL11$120.00$120.00$40.00$100.00$120.00
88Topsoil (625.0100)SY160$25.00$7.00$15.00$25.00$25.00
89Silt fence (628.1504)LF96$5.00$10.00$10.00$10.00$5.00
90Silt fence maintenance (628.1520)LF96$5.00$0.03$0.03$0.03$5.00
91Mobilizations erosion control (628.1905)EACH4$300.00$395.00$395.00$395.00$300.00
92Mobilizations emergency erosion control (628.1910)EACH2$150.00$425.00$425.00$425.00$150.00
93Erosion mat class I type B (628.2004)SY230$2.50$8.00$8.00$8.00$2.50
94Inlet protection type B (628.7010)EACH35$70.00$65.00$65.00$65.00$70.00
95Rock bags (628.7570)EACH400$15.00$3.00$3.00$3.00$15.00
96Fertilizer type B (629.0210)CWT0.10$250.00$1,250.00$1,250.00$1,250.00$250.00
97Seeding mixture no. 30 (630.0130)LB3$50.00$70.00$70.00$70.00$50.00
98Seed water (630.0500)MGAL4$100.00$5.00$5.00$5.00$100.00
99Signs type II reflective H (637.2210)SF4.29$75.00$75.00$75.00$75.00$75.00
100Traffic control drums (643.0300)DAY141,636$0.12$0.12$0.12$0.22$0.12
101Traffic control barricades type III (643.0420)DAY6,504$0.48$0.48$0.48$0.60$0.48
102Traffic control warning lights type A (643.0705)DAY14,484$0.09$0.09$0.09$0.21$0.09
103Traffic control warning lights type C (643.0715)DAY56,379$0.12$0.12$0.12$0.11$0.12
104Traffic control arrow boards (643.0800)DAY639$8.25$8.25$8.25$10.50$8.25
105Traffic control signs (643.0900)DAY42,323$0.18$0.18$0.18$0.36$0.18
106Traffic control covering signs type I (643.0910)EACH60$325.00$325.00$325.00$100.00$325.00
107Traffic control covering signs type II (643.0920)EACH48$90.00$90.00$90.00$50.00$90.00
108Traffic control signs fixed message (643.1000)SF234.75$40.00$40.00$40.00$20.00$40.00
109Traffic control signs PCMS (643.1050)DAY97$18.00$18.00$18.00$35.00$18.00
110Basic traffic queue warning system (643.1205.S)DAY490$55.00$55.00$55.00$106.68$55.00
111Temporary marking line paint 6- inch (643.3165)LF236,495$0.18$0.18$0.18$0.20$0.18
112Temporary marking line removable tape 6-inch (643.3180)LF995$2.50$2.50$2.50$2.75$2.50
113Temporary marking line paint 10- inch (643.3265)LF23,125$0.38$0.38$0.38$0.40$0.38
114Traffic control (643.5000)EACH1$165,000$165,000$165,000$48,000$165,000
115Geotextile type HR (645.0120)SY72$10.00$10.00$5.00$10.00$10.00
116Marking line epoxy 6-inch (646.2020)LF28,925$1.00$1.00$1.00$0.75$1.00
117Marking line grooved black epoxy 6-inch (646.2025)LF25,970$1.80$1.80$1.80$1.20$1.80
118Marking line grooved wet ref epoxy 6-inch (646.2040)LF89,030$1.20$1.20$1.20$1.40$1.20
119Marking line grooved permanent tape 6-inch (646.2050)LF20,390$7.00$7.00$7.00$8.00$7.00
120Marking line epoxy 10-inch (646.4020)LF4,465$0.96$0.96$0.96$1.50$0.96
121Marking line grooved black epoxy 10-inch (646.4025)LF3,405$3.62$3.62$3.62$2.50$3.62
122Marking line grooved permanent tape 10-inch (646.4050)LF25,815$13.00$13.00$13.00$12.25$13.00
123Cold weather marking epoxy 6-inch (646.6466)LF164,315$0.29$0.29$0.29$0.38$0.29
124Cold weather marking epoxy 10- inch (646.6470)LF33,685$0.63$0.63$0.63$0.58$0.63
125Marking chevron epoxy 24-inch (646.7220)LF163$20.08$20.08$20.08$13.00$20.08
126Marking removal line 4-inch (646.9000)LF8,675$0.25$0.25$0.25$0.35$0.25
127Marking removal line water blasting 4-inch (646.9010)LF55,695$0.27$0.27$0.27$0.40$0.27
128Marking removal line water blasting 6-inch (646.9012)LF218,875$0.27$0.27$0.27$0.42$0.27
129Marking removal line 8-inch (646.9100)LF1,635$0.70$0.70$0.70$0.45$0.70
130Marking removal line water blasting 8-inch (646.9110)LF9,955$0.75$0.75$0.75$0.50$0.75
131Marking removal line water blasting 10-inch (646.9112)LF20,465$0.80$0.80$0.80$0.55$0.80
132Construction staking storm sewer (650.4000)EACH2$435.00$40.11$40.11$40.11$40.11
133Construction staking subgrade (650.4500)LF6,312$0.72$0.01$0.01$0.01$0.01
134Construction staking curb gutter and curb & gutter (650.5500)LF112$11.66$0.63$0.63$0.63$0.63
135Construction staking concrete pavement (650.7000)LF6,312$1.31$1.30$1.30$1.30$1.30
136Construction staking supplemental control (project) 01. 4685-34-71 (650.9911)EACH1$2,030.00$412.00$412.00$412.00$412.00
137Conduit rigid metallic 2-inch (652.0125)LF406$86.20$485.00$485.00$485.00$485.00
138Conduit rigid nonmetallic schedule 40 2-inch (652.0225)LF1,706$10.30$10.00$10.00$10.00$10.00
139Sawing asphalt (690.0150)LF181$1.95$1.95$1.95$1.69$1.95
140Sawing concrete (690.0250)LF6,975$2.35$2.35$2.35$2.65$2.35
141Incentive strength concrete structures (715.0502)DOL7,910$1.00$1.00$1.00$1.00$1.00
142On-the-job training apprentice at $5.00/HR (ASP.1T0A)HRS2,400$5.00$5.00$5.00$5.00$5.00
143On-the-job training graduate at $5.00/HR (ASP.1T0G)HRS3,040$5.00$5.00$5.00$5.00$5.00
144Special 01. combination work zone digital speed limit-speed feedback sign trailer (SPV.0045)DAY310$9.50$9.50$9.50$203.49$9.50
145Special 03. saw cutting concrete barrier single slope (SPV.0060)EACH26$125.00$125.00$125.00$150.00$125.00
146Special 04. concrete barrier transition hes type S36 to S42 (SPV.0060)EACH1$8,519.02$6,056.00$4,985.00$15,000$6,056.00
147Special 05. concrete barrier transition hes type S42 to S56 (SPV.0060)EACH1$11,399$7,056.00$7,490.00$20,000$7,056.00
148Special 06. pulling and reconnecting electrical wiring (SPV.0060)EACH25$424.40$4,850.00$4,850.00$4,850.00$4,850.00
149Special 07. anchor assemblies noise barriers structures (SPV.0060)EACH13$601.93$655.64$655.64$655.64$135.00
150Special 08. parapet cover plates replacement (SPV.0060)EACH4$6,200.00$6,789.74$6,789.74$6,789.74$10,500
151Special 09. removing & resetting noise barrier N-40-100 (SPV.0060)EACH1$13,063$13,278$13,278$13,278$9,350.00
152Special 10. removing and resetting noise barrier N-70-101 (SPV.0060)EACH1$14,736$14,921$14,921$14,921$9,350.00
153Special 01. removing rumble strips (SPV.0090)LF35,106$4.75$4.75$4.75$4.75$4.75
154Special 02. concrete curb hes type A (SPV.0090)LF25$44.36$150.00$85.00$100.00$150.00
155Special 03. concrete curb and gutter hes 4-inch sloped 36-inch type TBT (SPV.0090)LF124$57.12$62.00$65.00$100.00$80.00
156Special 04. concrete curb and gutter hes 4-inch slope 36-inch type TBTT (SPV.0090)LF80$66.44$58.00$65.00$100.00$65.00
157Special 05. concrete barrier hes type S32 (SPV.0090)LF181$164.65$239.71$235.40$350.00$239.71
158Special 06. concrete barrier hes type S42 (SPV.0090)LF371$174.45$245.39$238.50$400.00$245.39
159Special 07. concrete barrier hes type S56 (SPV.0090)LF718$179.34$252.97$244.55$450.00$252.97
160Special 08. concrete barrier hes type S36C (SPV.0090)LF258$291.64$302.63$465.00$450.00$302.63
WisDOT contract 20250211031: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.

Every contract let that day: WisDOT letting of February 11, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy