WisDOT contract 20250311007 bid tabulation
Town of Porter, Caledonia Road; Yahara River Bridge B-53-0096 (LOC STR, Rock County Town of Porter, Caledonia Road). Let by Wisconsin DOT on March 11, 2025, Rock. 4 bids received; low bid $887,052 by Lunda Construction Company.
- Owner
- Wisconsin DOT
- Letting
- 11 MAR 2025
- Pay items
- 89
- Data through
- 10 NOV 2026
3 of the 4 bids matched their published totals to within a dollar and are shown; the others are left out.
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Lunda Construction Company | $887,052 | Low |
| 3 | Concrete Structures, Inc. | $944,183 | +6.0% |
| 4 | Zenith Tech., Inc. - Waukesha | $959,139 | +8.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Lunda Construction Company | 2. Concrete Structures, Inc. | 3. Zenith Tech., Inc. - Waukesha |
|---|---|---|---|---|---|---|
| 1 | Grubbing (201.0205) | STA | 5 | $10.00 | $10.00 | $10.00 |
| 2 | Removing small pipe culverts (203.0100) | EACH | 1 | $650.00 | $650.00 | $650.00 |
| 3 | Removing structure over waterway minimal debris (structure) 01. B-53- 96 (203.0260) | EACH | 1 | $175,000 | $189,000 | $135,000 |
| 4 | Removing guardrail (204.0165) | LF | 170 | $6.00 | $5.00 | $3.33 |
| 5 | Excavation common (205.0100) | CY | 720 | $17.50 | $17.50 | $17.50 |
| 6 | Excavation for structures bridges (structure) 01. B-53-96 (206.1001) | EACH | 1 | $2,500.00 | $3,500.00 | $5,000.00 |
| 7 | Backfill structure type A (210.1500) | TON | 8 | $50.00 | $25.00 | $50.00 |
| 8 | Finishing roadway (project) 01. 5767-00-73 (213.0100) | EACH | 1 | $500.00 | $500.00 | $500.00 |
| 9 | Base aggregate dense 3/4-inch (305.0110) | TON | 700 | $23.00 | $23.00 | $23.00 |
| 10 | Base aggregate dense 3-inch (305.0130) | TON | 701 | $20.00 | $20.00 | $20.00 |
| 11 | Tack coat (455.0605) | GAL | 45 | $0.10 | $0.10 | $0.10 |
| 12 | Incentive density HMA pavement (460.2000) | DOL | 170 | $1.00 | $1.00 | $1.00 |
| 13 | HMA pavement 3 LT 58-28 S (460.5223) | TON | 150 | $115.75 | $115.75 | $115.75 |
| 14 | HMA pavement 4 LT 58-28 S (460.5224) | TON | 113 | $117.50 | $117.50 | $117.50 |
| 15 | Concrete masonry bridges (502.0100) | CY | 185 | $950.00 | $1,250.00 | $1,775.00 |
| 16 | Expansion device (502.3101) | LF | 30 | $550.00 | $400.00 | $325.00 |
| 17 | Protective surface treatment (502.3200) | SY | 509 | $12.00 | $7.00 | $4.00 |
| 18 | Pigmented surface sealer (502.3210) | SY | 168 | $15.00 | $10.00 | $12.50 |
| 19 | Adhesive anchors 3/4-inch (502.4106) | EACH | 4 | $28.00 | $100.00 | $27.50 |
| 20 | Adhesive anchors no. 5 bar (502.4205) | EACH | 64 | $26.00 | $75.00 | $30.00 |
| 21 | Bar steel reinforcement HS coated structures (505.0600) | LB | 48,270 | $1.65 | $1.40 | $1.45 |
| 22 | Bearing pads elastomeric laminated (506.2610) | EACH | 4 | $2,750.00 | $2,500.00 | $1,350.00 |
| 23 | Removing bearings (structure) 01. B-53-96 (506.7050.S) | EACH | 4 | $1,200.00 | $1,000.00 | $1,950.00 |
| 24 | Concrete surface repair (509.1500) | SF | 30 | $165.00 | $200.00 | $500.00 |
| 25 | Preparation and coating of top flanges (structure) 01. B-53-96 (517.0901.S) | EACH | 1 | $4,592.00 | $4,592.00 | $4,592.00 |
| 26 | Structure repainting recycled abrasive (structure) 01. B-53-96 (517.1801.S) | EACH | 1 | $69,600 | $69,600 | $69,600 |
| 27 | Negative pressure containment and collection of waste materials (structure) 01. B-53-96 (517.4501.S) | EACH | 1 | $23,200 | $23,200 | $23,200 |
| 28 | Portable decontamination facility (517.6001.S) | EACH | 1 | $2,000.00 | $2,000.00 | $2,000.00 |
| 29 | Apron endwalls for culvert pipe reinforced concrete 12-inch (522.1012) | EACH | 1 | $1,050.00 | $1,050.00 | $1,050.00 |
| 30 | Apron endwalls for culvert pipe reinforced concrete 24-inch (522.1024) | EACH | 1 | $1,650.00 | $1,650.00 | $1,650.00 |
| 31 | Concrete curb & gutter 4-inch sloped 36-inch type TBT (601.0588) | LF | 115 | $85.00 | $85.00 | $119.26 |
| 32 | Riprap light (606.0100) | CY | 4.30 | $80.00 | $80.00 | $80.00 |
| 33 | Riprap heavy (606.0300) | CY | 3 | $80.00 | $150.00 | $80.00 |
| 34 | Storm sewer pipe reinforced concrete class III 12-inch (608.0312) | LF | 54 | $65.00 | $65.00 | $65.00 |
| 35 | Storm sewer pipe reinforced concrete class III 24-inch (608.0324) | LF | 64 | $85.00 | $85.00 | $85.00 |
| 36 | Inlet covers type MS (611.0642) | EACH | 2 | $775.00 | $775.00 | $775.00 |
| 37 | Inlet covers type V (611.0654) | EACH | 3 | $825.00 | $825.00 | $825.00 |
| 38 | Inlets 2X2-FT (611.3220) | EACH | 2 | $1,375.00 | $1,375.00 | $1,375.00 |
| 39 | Inlets 2X2.5-FT (611.3225) | EACH | 1 | $1,375.00 | $1,375.00 | $1,375.00 |
| 40 | Inlets median 2 grate (611.3902) | EACH | 1 | $4,150.00 | $4,150.00 | $4,150.00 |
| 41 | Anchor assemblies for steel plate beam guard (614.0150) | EACH | 4 | $250.00 | $350.00 | $450.00 |
| 42 | MGS thrie beam transition (614.2500) | LF | 158 | $86.00 | $98.00 | $82.80 |
| 43 | MGS guardrail terminal eat (614.2610) | EACH | 4 | $3,800.00 | $3,450.00 | $3,451.50 |
| 44 | Maintenance and repair of haul roads (project) 01. 5767-00-73 (618.0100) | EACH | 1 | $1.00 | $500.00 | $1,500.00 |
| 45 | Mobilization (619.1000) | EACH | 1 | $122,012 | $106,000 | $80,000 |
| 46 | Water (624.0100) | MGAL | 21 | $0.01 | $0.01 | $0.01 |
| 47 | Salvaged topsoil (625.0500) | SY | 969 | $2.75 | $2.75 | $2.75 |
| 48 | Mulching (627.0200) | SY | 450 | $1.00 | $0.50 | $0.32 |
| 49 | Silt fence (628.1504) | LF | 930 | $2.25 | $3.00 | $2.30 |
| 50 | Silt fence maintenance (628.1520) | LF | 1,365 | $0.01 | $0.10 | $0.07 |
| 51 | Mobilizations erosion control (628.1905) | EACH | 4 | $100.00 | $250.00 | $378.00 |
| 52 | Mobilizations emergency erosion control (628.1910) | EACH | 3 | $100.00 | $300.00 | $225.00 |
| 53 | Erosion mat class II type C (628.2027) | SY | 945 | $3.95 | $5.00 | $3.42 |
| 54 | Inlet protection type A (628.7005) | EACH | 5 | $110.00 | $125.00 | $86.40 |
| 55 | Inlet protection type C (628.7015) | EACH | 4 | $65.00 | $60.00 | $68.40 |
| 56 | Temporary ditch checks (628.7504) | LF | 219 | $10.00 | $9.50 | $8.06 |
| 57 | Tracking pads (628.7560) | EACH | 2 | $50.00 | $50.00 | $50.00 |
| 58 | Fertilizer type A (629.0205) | CWT | 1 | $250.00 | $100.00 | $99.90 |
| 59 | Seeding mixture no. 20 (630.0120) | LB | 51 | $9.95 | $15.00 | $11.70 |
| 60 | Seeding borrow pit (630.0300) | LB | 20 | $5.00 | $15.00 | $11.70 |
| 61 | Seed water (630.0500) | MGAL | 36 | $20.00 | $75.00 | $26.10 |
| 62 | Markers culvert end (633.5200) | EACH | 2 | $75.00 | $60.00 | $63.90 |
| 63 | Posts wood 4X6-inch X 12-FT (634.0612) | EACH | 10 | $90.00 | $75.00 | $90.00 |
| 64 | Posts wood 4X6-inch X 14-FT (634.0614) | EACH | 4 | $95.00 | $85.00 | $97.20 |
| 65 | Posts wood 4X6-inch X 16-FT (634.0616) | EACH | 1 | $100.00 | $100.00 | $104.40 |
| 66 | Posts wood 4X6-inch X 18-FT (634.0618) | EACH | 4 | $120.00 | $120.00 | $116.10 |
| 67 | Signs type II reflective F (637.2230) | SF | 119 | $25.00 | $28.50 | $26.10 |
| 68 | Removing signs type II (638.2602) | EACH | 8 | $30.00 | $35.00 | $28.80 |
| 69 | Removing small sign supports (638.3000) | EACH | 6 | $30.00 | $35.00 | $30.87 |
| 70 | Field office type C (642.5201) | EACH | 1 | $1,500.00 | $2,000.00 | $8,000.00 |
| 71 | Traffic control barricades type III (643.0420) | DAY | 814 | $0.73 | $0.73 | $0.73 |
| 72 | Traffic control warning lights type A (643.0705) | DAY | 1,480 | $0.22 | $0.22 | $0.22 |
| 73 | Traffic control signs (643.0900) | DAY | 1,110 | $0.55 | $0.55 | $0.55 |
| 74 | Traffic control signs fixed message (643.1000) | SF | 40.50 | $25.00 | $25.00 | $25.00 |
| 75 | Traffic control signs PCMS (643.1050) | DAY | 14 | $37.00 | $37.00 | $37.00 |
| 76 | Traffic control (643.5000) | EACH | 1 | $3,180.47 | $3,180.47 | $3,180.47 |
| 77 | Geotextile type R (645.0130) | SY | 21 | $6.00 | $6.00 | $6.00 |
| 78 | Construction staking storm sewer (650.4000) | EACH | 6 | $200.00 | $200.00 | $200.00 |
| 79 | Construction staking subgrade (650.4500) | LF | 305 | $0.01 | $0.01 | $0.01 |
| 80 | Construction staking base (650.5000) | LF | 305 | $1.50 | $1.50 | $1.50 |
| 81 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 115 | $3.00 | $3.00 | $3.00 |
| 82 | Construction staking structure layout (structure) 01. B-53-96 (650.6501) | EACH | 1 | $1,500.00 | $1,500.00 | $1,500.00 |
| 83 | Construction staking supplemental control (project) 01. 5767-00-73 (650.9911) | EACH | 1 | $500.00 | $500.00 | $500.00 |
| 84 | Construction staking slope stakes (650.9920) | LF | 435 | $1.50 | $1.50 | $1.50 |
| 85 | Sawing asphalt (690.0150) | LF | 64 | $6.00 | $6.00 | $6.00 |
| 86 | Maintaining bird deterrent system (station) 01. 19+48 (999.2005.S) | EACH | 1 | $0.01 | $100.00 | $2,000.00 |
| 87 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 1,200 | $5.00 | $5.00 | $5.00 |
| 88 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 600 | $5.00 | $5.00 | $5.00 |
| 89 | Special 01. abutment seat cleaning and sealing (SPV.0180) | SY | 8 | $400.00 | $2,000.00 | $288.32 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of March 11, 2025. Compiled by Mirage Metrics.