WisDOT contract 20250408023 bid tabulation
South County Line - USH 10; South County Line to V Schuh Lane (CTH PP, Pepin County South County Line - USH 10). Let by Wisconsin DOT on April 8, 2025, Pepin. 4 bids received; low bid $1,130,766 by James Peterson Sons, Inc..
- Owner
- Wisconsin DOT
- Letting
- 08 APR 2025
- Pay items
- 71
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | James Peterson Sons, Inc. | $1,130,766 | Low |
| 2 | McCabe Construction, Inc. | $1,159,750 | +3.0% |
| 3 | A-1 Excavating LLC | $1,329,712 | +18% |
| 4 | Haas Sons, Inc. | $1,353,044 | +20% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. James Peterson Sons, Inc. | 2. McCabe Construction, Inc. | 3. A-1 Excavating LLC | 4. Haas Sons, Inc. |
|---|---|---|---|---|---|---|---|
| 1 | Grubbing (201.0205) | STA | 11 | $700.00 | $623.04 | $630.00 | $1,000.00 |
| 2 | Removing small pipe culverts (203.0100) | EACH | 3 | $700.00 | $394.34 | $660.00 | $650.00 |
| 3 | Removing asphaltic surface butt joints (204.0115) | SY | 500 | $5.00 | $5.64 | $8.00 | $7.00 |
| 4 | Removing guardrail (204.0165) | LF | 2,150 | $2.10 | $2.18 | $2.20 | $2.10 |
| 5 | Excavation common (205.0100) | CY | 25,058 | $8.74 | $13.85 | $15.50 | $15.20 |
| 6 | Excavation rock (205.0200) | CY | 2,207 | $35.02 | $32.52 | $15.50 | $28.95 |
| 7 | Finishing roadway (project) 01. 7868-03-70 (213.0100) | EACH | 1 | $2,500.00 | $2,490.18 | $700.00 | $1.00 |
| 8 | Obliterating old road (214.0100) | STA | 9.60 | $750.00 | $719.32 | $1,000.00 | $2,212.00 |
| 9 | Base aggregate dense 3/4-inch (305.0110) | TON | 990 | $22.85 | $24.38 | $27.00 | $23.25 |
| 10 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 3,694 | $16.29 | $17.64 | $20.00 | $16.75 |
| 11 | Pulverize and relay (325.0100) | SY | 11,640 | $2.15 | $1.85 | $3.50 | $1.91 |
| 12 | Tack coat (455.0605) | GAL | 790 | $4.01 | $4.17 | $4.00 | $4.01 |
| 13 | Incentive density HMA pavement (460.2000) | DOL | 1,880 | $1.00 | $1.00 | $1.00 | $1.00 |
| 14 | HMA pavement 3 LT 58-28 S (460.5223) | TON | 1,650 | $88.16 | $91.70 | $93.00 | $99.00 |
| 15 | HMA pavement 4 LT 58-34 S (460.5244) | TON | 1,280 | $98.01 | $101.94 | $103.00 | $99.00 |
| 16 | Asphaltic surface driveways and field entrances (465.0120) | TON | 9 | $283.75 | $295.14 | $330.00 | $285.00 |
| 17 | Asphaltic curb (465.0310) | LF | 1,780 | $3.36 | $3.49 | $3.50 | $3.50 |
| 18 | Asphaltic flumes (465.0315) | SY | 18 | $62.13 | $64.62 | $66.00 | $63.00 |
| 19 | Apron endwalls for culvert pipe steel 12-inch (521.1012) | EACH | 2 | $220.00 | $226.24 | $550.00 | $500.00 |
| 20 | Culvert pipe corrugated steel 12- inch (521.3112) | LF | 22 | $70.00 | $63.72 | $112.00 | $147.00 |
| 21 | Culvert pipe reinforced concrete class IV 12-inch (522.0412) | LF | 46 | $77.00 | $61.15 | $90.00 | $118.00 |
| 22 | Culvert pipe reinforced concrete class IV 18-inch (522.0418) | LF | 42 | $91.00 | $73.93 | $108.00 | $127.00 |
| 23 | Culvert pipe reinforced concrete class IV 30-inch (522.0430) | LF | 36 | $171.00 | $141.57 | $207.00 | $213.00 |
| 24 | Apron endwalls for culvert pipe reinforced concrete 12-inch (522.1012) | EACH | 2 | $775.00 | $994.15 | $1,500.00 | $1,350.00 |
| 25 | Apron endwalls for culvert pipe reinforced concrete 18-inch (522.1018) | EACH | 2 | $950.00 | $1,171.95 | $1,700.00 | $1,500.00 |
| 26 | Apron endwalls for culvert pipe reinforced concrete 30-inch (522.1030) | EACH | 2 | $1,400.00 | $1,594.57 | $2,700.00 | $2,050.00 |
| 27 | Culvert pipe reinforced concrete horizontal elliptical class HE-IV 24X38-inch (522.2424) | LF | 46 | $195.00 | $173.84 | $225.00 | $222.00 |
| 28 | Apron endwalls for culvert pipe reinforced concrete horizontal elliptical 24X38-inch (522.2624) | EACH | 2 | $1,800.00 | $1,820.68 | $2,600.00 | $2,400.00 |
| 29 | Riprap medium (606.0200) | CY | 29 | $125.00 | $91.62 | $130.00 | $120.00 |
| 30 | MGS guardrail 3 (614.2300) | LF | 175 | $22.45 | $23.35 | $24.00 | $22.45 |
| 31 | MGS guardrail 3 K (614.2330) | LF | 1,375 | $36.55 | $38.02 | $38.00 | $36.55 |
| 32 | MGS guardrail terminal eat (614.2610) | EACH | 4 | $3,405.00 | $3,541.65 | $3,600.00 | $3,405.00 |
| 33 | Maintenance and repair of haul roads (project) 01. 7868-03-70 (618.0100) | EACH | 1 | $1,000.00 | $1.00 | $100.00 | $1.00 |
| 34 | Mobilization (619.1000) | EACH | 1 | $176,180 | $68,086 | $120,000 | $165,860 |
| 35 | Water (624.0100) | MGAL | 73 | $20.00 | $43.84 | $40.00 | $1.00 |
| 36 | Topsoil (625.0100) | SY | 18,095 | $3.26 | $3.35 | $6.00 | $4.03 |
| 37 | Mulching (627.0200) | SY | 3,930 | $0.49 | $0.51 | $0.50 | $0.49 |
| 38 | Silt fence (628.1504) | LF | 3,838 | $1.85 | $1.92 | $2.00 | $1.85 |
| 39 | Silt fence maintenance (628.1520) | LF | 3,838 | $0.01 | $0.01 | $0.01 | $0.01 |
| 40 | Mobilizations erosion control (628.1905) | EACH | 2 | $75.00 | $78.01 | $100.00 | $75.00 |
| 41 | Mobilizations emergency erosion control (628.1910) | EACH | 2 | $75.00 | $78.01 | $100.00 | $75.00 |
| 42 | Erosion mat class I type B (628.2004) | SY | 14,337 | $0.90 | $0.94 | $1.00 | $0.90 |
| 43 | Temporary ditch checks (628.7504) | LF | 75 | $7.00 | $7.28 | $8.00 | $7.00 |
| 44 | Culvert pipe checks (628.7555) | EACH | 23 | $17.00 | $17.68 | $18.00 | $17.00 |
| 45 | Fertilizer type B (629.0210) | CWT | 12 | $92.00 | $95.69 | $97.00 | $92.00 |
| 46 | Seeding mixture no. 20 (630.0120) | LB | 497 | $6.40 | $6.66 | $7.00 | $6.40 |
| 47 | Seeding temporary (630.0200) | LB | 497 | $2.65 | $2.76 | $3.00 | $2.65 |
| 48 | Posts wood 4X6-inch X 16-FT (634.0616) | EACH | 1 | $90.00 | $93.61 | $100.00 | $90.00 |
| 49 | Posts wood 4X6-inch X 18-FT (634.0618) | EACH | 7 | $91.00 | $94.65 | $100.00 | $91.00 |
| 50 | Signs type II reflective F (637.2230) | SF | 64.50 | $19.75 | $20.54 | $21.00 | $19.75 |
| 51 | Removing signs type II (638.2602) | EACH | 12 | $20.00 | $20.80 | $21.00 | $20.00 |
| 52 | Removing small sign supports (638.3000) | EACH | 12 | $20.00 | $20.80 | $21.00 | $20.00 |
| 53 | Field office type B (642.5001) | EACH | 1 | $10,000 | $8,000.00 | $11,550 | $19,100 |
| 54 | Traffic control barricades type III (643.0420) | DAY | 1,080 | $0.70 | $0.74 | $1.00 | $0.65 |
| 55 | Traffic control warning lights type A (643.0705) | DAY | 1,680 | $0.20 | $0.21 | $0.20 | $0.15 |
| 56 | Traffic control signs (643.0900) | DAY | 840 | $0.50 | $0.53 | $1.50 | $1.25 |
| 57 | Traffic control (643.5000) | EACH | 1 | $3,500.00 | $3,676.87 | $6,800.00 | $2,100.00 |
| 58 | Geotextile type HR (645.0120) | SY | 93 | $20.00 | $5.00 | $15.00 | $8.00 |
| 59 | Marking line epoxy 4-inch (646.1020) | LF | 9,746 | $0.60 | $0.63 | $0.70 | $0.84 |
| 60 | Locating no-passing zones (648.0100) | MI | 0.93 | $500.00 | $525.27 | $525.00 | $2,700.00 |
| 61 | Construction staking subgrade (650.4500) | LF | 2,856 | $0.01 | $0.01 | $0.01 | $2.00 |
| 62 | Construction staking base (650.5000) | LF | 2,856 | $0.75 | $0.78 | $1.00 | $0.75 |
| 63 | Construction staking pipe culverts (650.6000) | EACH | 5 | $300.00 | $312.04 | $315.00 | $300.00 |
| 64 | Construction staking resurfacing reference (650.8000) | LF | 4,046 | $0.10 | $0.10 | $0.20 | $0.10 |
| 65 | Construction staking supplemental control (project) 01. 7868-03-70 (650.9911) | EACH | 1 | $1,500.00 | $1,560.20 | $3,150.00 | $1,500.00 |
| 66 | Construction staking slope stakes (650.9920) | LF | 2,856 | $0.75 | $0.78 | $1.00 | $0.75 |
| 67 | Sawing asphalt (690.0150) | LF | 141 | $1.95 | $2.03 | $3.00 | $1.95 |
| 68 | Incentive iri ride (740.0440) | DOL | 3,692 | $1.00 | $1.00 | $1.00 | $1.00 |
| 69 | Crack and damage survey (999.1501.S) | EACH | 1 | $2,000.00 | $3,120.40 | $1,500.00 | $10,000 |
| 70 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 300 | $5.00 | $5.00 | $5.00 | $5.00 |
| 71 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 300 | $5.00 | $5.00 | $5.00 | $5.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of April 8, 2025. Compiled by Mirage Metrics.