WisDOT contract 20250408028 bid tabulation
STH 107 - CTH O; Little Rib River Bridge, B-37-0473 (CTH L, Marathon County STH 107 - CTH O). Let by Wisconsin DOT on April 8, 2025, Marathon. 6 bids received; low bid $639,962 by Janke General Contractors, Inc..
- Owner
- Wisconsin DOT
- Letting
- 08 APR 2025
- Pay items
- 69
- Data through
- 10 NOV 2026
5 of the 6 bids matched their published totals to within a dollar and are shown; the others are left out.
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Janke General Contractors, Inc. | $639,962 | Low |
| 3 | Radtke Contractors Inc. | $667,554 | +4.0% |
| 4 | Lunda Construction Company | $676,475 | +6.0% |
| 5 | Larson Construction Co., Inc. | $769,403 | +20% |
| 6 | Zenith Tech., Inc. - Waukesha | $822,693 | +29% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Janke General Contractors, Inc. | 2. Radtke Contractors Inc. | 3. Lunda Construction Company | 4. Larson Construction Co., Inc. | 5. Zenith Tech., Inc. - Waukesha |
|---|---|---|---|---|---|---|---|---|
| 1 | Clearing (201.0105) | STA | 3 | $200.00 | $50.00 | $50.00 | $50.00 | $50.00 |
| 2 | Grubbing (201.0205) | STA | 3 | $215.00 | $150.00 | $150.00 | $150.00 | $150.00 |
| 3 | Removing structure over waterway minimal debris (structure) 01. B-37- 0038 (203.0260) | EACH | 1 | $17,500 | $45,226 | $125,000 | $45,940 | $45,000 |
| 4 | Excavation common (205.0100) | CY | 382 | $15.50 | $9.19 | $9.19 | $9.19 | $9.19 |
| 5 | Excavation, hauling, and disposal of creosote contaminated soil (205.0506.S) | TON | 150 | $121.00 | $88.64 | $97.00 | $97.00 | $97.00 |
| 6 | Excavation for structures bridges (structure) 01. B-37-0473 (206.1001) | EACH | 1 | $38,350 | $59,642 | $10,000 | $37,600 | $40,000 |
| 7 | Borrow (208.0100) | CY | 437 | $20.50 | $29.89 | $29.89 | $29.89 | $29.89 |
| 8 | Backfill structure type A (210.1500) | TON | 615 | $22.00 | $28.50 | $19.78 | $29.78 | $19.78 |
| 9 | Finishing roadway (project) 01. 9478-03-71 (213.0100) | EACH | 1 | $350.00 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 |
| 10 | Base aggregate dense 3/4-inch (305.0110) | TON | 155 | $31.00 | $23.45 | $23.45 | $23.45 | $23.45 |
| 11 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 860 | $24.75 | $20.31 | $20.31 | $20.31 | $27.40 |
| 12 | Tack coat (455.0605) | GAL | 105 | $7.20 | $7.20 | $7.20 | $7.20 | $7.20 |
| 13 | Asphaltic surface (465.0105) | TON | 340 | $132.50 | $132.50 | $132.50 | $132.50 | $132.50 |
| 14 | Concrete masonry bridges (502.0100) | CY | 243 | $575.00 | $549.52 | $650.00 | $712.00 | $821.01 |
| 15 | Protective surface treatment (502.3200) | SY | 288 | $4.00 | $3.60 | $5.00 | $3.50 | $4.00 |
| 16 | Bar steel reinforcement HS structures (505.0400) | LB | 5,550 | $1.70 | $1.23 | $0.95 | $1.55 | $1.20 |
| 17 | Bar steel reinforcement HS coated structures (505.0600) | LB | 30,740 | $1.70 | $1.32 | $1.12 | $1.50 | $1.30 |
| 18 | Railing tubular type M (513.4061) | LF | 110 | $360.00 | $295.18 | $275.00 | $265.00 | $280.00 |
| 19 | Rubberized membrane waterproofing (516.0500) | SY | 17 | $32.00 | $74.42 | $25.00 | $62.50 | $60.00 |
| 20 | Pre-boring unconsolidated materials (550.0010) | LF | 304 | $232.00 | $152.84 | $100.00 | $371.00 | $300.00 |
| 21 | Pile points (550.0500) | EACH | 16 | $158.00 | $110.78 | $105.00 | $125.00 | $111.00 |
| 22 | Piling steel HP 10-inch X 42 LB (550.1100) | LF | 480 | $67.00 | $32.81 | $33.75 | $50.00 | $66.00 |
| 23 | Riprap heavy (606.0300) | CY | 125 | $91.00 | $129.99 | $78.68 | $83.68 | $78.68 |
| 24 | Pipe underdrain wrapped 6-inch (612.0406) | LF | 195 | $11.00 | $4.20 | $6.10 | $6.10 | $6.10 |
| 25 | MGS guardrail 3 (614.2300) | LF | 137.50 | $27.00 | $25.80 | $25.80 | $25.80 | $25.80 |
| 26 | MGS thrie beam transition (614.2500) | LF | 120 | $96.00 | $88.75 | $88.75 | $88.75 | $88.75 |
| 27 | MGS guardrail terminal eat (614.2610) | EACH | 3 | $4,000.00 | $3,500.00 | $3,500.00 | $3,500.00 | $3,500.00 |
| 28 | Maintenance and repair of haul roads (project) 01. 9478-03-71 (618.0100) | EACH | 1 | $349.18 | $250.00 | $0.01 | $2,500.00 | $1,800.00 |
| 29 | Mobilization (619.1000) | EACH | 1 | $26,000 | $75,257 | $59,987 | $73,450 | $121,150 |
| 30 | Water (624.0100) | MGAL | 37 | $14.00 | $25.00 | $25.00 | $25.00 | $25.00 |
| 31 | Topsoil (625.0100) | SY | 1,045 | $5.00 | $5.89 | $5.89 | $5.89 | $5.89 |
| 32 | Mulching (627.0200) | SY | 1,230 | $0.50 | $0.75 | $0.75 | $0.75 | $0.75 |
| 33 | Silt fence (628.1504) | LF | 1,575 | $2.20 | $2.80 | $2.80 | $2.80 | $2.80 |
| 34 | Silt fence maintenance (628.1520) | LF | 3,150 | $0.01 | $0.10 | $0.10 | $0.10 | $0.10 |
| 35 | Mobilizations erosion control (628.1905) | EACH | 4 | $320.00 | $100.00 | $100.00 | $100.00 | $100.00 |
| 36 | Mobilizations emergency erosion control (628.1910) | EACH | 4 | $200.00 | $100.00 | $100.00 | $100.00 | $100.00 |
| 37 | Erosion mat class II type C (628.2027) | SY | 395 | $4.00 | $3.28 | $3.28 | $3.28 | $3.28 |
| 38 | Turbidity barriers (628.6005) | SY | 55 | $45.00 | $47.90 | $47.90 | $47.90 | $47.90 |
| 39 | Temporary ditch checks (628.7504) | LF | 50 | $11.00 | $12.50 | $12.50 | $12.50 | $12.50 |
| 40 | Fertilizer type B (629.0210) | CWT | 1 | $80.00 | $100.00 | $100.00 | $100.00 | $100.00 |
| 41 | Seeding mixture no. 20 (630.0120) | LB | 74 | $7.00 | $8.10 | $8.10 | $8.10 | $8.10 |
| 42 | Seeding temporary (630.0200) | LB | 45 | $4.00 | $3.00 | $3.00 | $3.00 | $3.00 |
| 43 | Seed water (630.0500) | MGAL | 36 | $1.00 | $25.00 | $25.00 | $25.00 | $25.00 |
| 44 | Posts wood 4X6-inch X 14-FT (634.0614) | EACH | 5 | $77.00 | $125.00 | $125.00 | $125.00 | $125.00 |
| 45 | Signs type II reflective H (637.2210) | SF | 5.18 | $22.90 | $28.15 | $28.15 | $28.15 | $28.15 |
| 46 | Signs type II reflective F (637.2230) | SF | 12 | $24.80 | $28.10 | $28.10 | $28.10 | $28.10 |
| 47 | Moving signs type II (638.2102) | EACH | 2 | $100.00 | $25.00 | $25.00 | $25.00 | $25.00 |
| 48 | Removing signs type II (638.2602) | EACH | 5 | $25.00 | $10.00 | $10.00 | $10.00 | $10.00 |
| 49 | Removing small sign supports (638.3000) | EACH | 5 | $25.00 | $10.00 | $10.00 | $10.00 | $10.00 |
| 50 | Moving small sign supports (638.4000) | EACH | 1 | $100.00 | $65.00 | $65.00 | $65.00 | $65.00 |
| 51 | Field office type B (642.5001) | EACH | 1 | $4,960.00 | $2,489.56 | $3,500.00 | $3,200.00 | $4,700.00 |
| 52 | Traffic control barricades type III (643.0420) | DAY | 2,860 | $0.35 | $0.35 | $0.40 | $0.35 | $0.40 |
| 53 | Traffic control warning lights type A (643.0705) | DAY | 4,030 | $0.05 | $0.05 | $0.10 | $0.05 | $0.10 |
| 54 | Traffic control signs (643.0900) | DAY | 2,120 | $0.35 | $0.35 | $0.25 | $0.35 | $0.25 |
| 55 | Traffic control (643.5000) | EACH | 1 | $900.00 | $900.00 | $5,195.00 | $900.00 | $5,195.00 |
| 56 | Geotextile type DF schedule A (645.0111) | SY | 125 | $2.34 | $5.05 | $8.44 | $8.44 | $8.44 |
| 57 | Geotextile type HR (645.0120) | SY | 265 | $3.25 | $5.26 | $5.98 | $5.98 | $5.98 |
| 58 | Marking line epoxy 4-inch (646.1020) | LF | 1,020 | $4.85 | $4.85 | $5.25 | $4.85 | $5.25 |
| 59 | Construction staking subgrade (650.4500) | LF | 467 | $0.01 | $0.01 | $0.01 | $0.01 | $0.01 |
| 60 | Construction staking base (650.5000) | LF | 401 | $0.01 | $0.01 | $0.01 | $0.01 | $0.01 |
| 61 | Construction staking structure layout (structure) 01. B-37-0473 (650.6501) | EACH | 1 | $3,000.00 | $3,000.00 | $3,000.00 | $3,000.00 | $3,000.00 |
| 62 | Construction staking supplemental control (project) 01. 9478-03-71 (650.9911) | EACH | 1 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 |
| 63 | Construction staking slope stakes (650.9920) | LF | 467 | $1.20 | $1.20 | $1.20 | $1.20 | $1.20 |
| 64 | Sawing asphalt (690.0150) | LF | 48 | $2.45 | $5.00 | $5.00 | $5.00 | $5.00 |
| 65 | Incentive strength concrete structures (715.0502) | DOL | 1,458 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 66 | Maintaining bird deterrent system (station) 01. 10+00 (999.2005.S) | EACH | 1 | $1,125.00 | $0.01 | $1.00 | $1,100.00 | $1,000.00 |
| 67 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 300 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 |
| 68 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 600 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 |
| 69 | Special 01. removing existing timber piling (SPV.0090) | LF | 150 | $31.00 | $37.36 | $35.00 | $75.00 | $30.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of April 8, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.