WisDOT contract 20250513020 bid tabulation

Appleton - De Pere; Sbc Interchange (LOC STR, Brown County Appleton - De Pere). Let by Wisconsin DOT on May 13, 2025, Brown. 4 bids received; low bid $17,329,415 by Vinton Construction Company.

Owner
Wisconsin DOT
Letting
13 MAY 2025
Pay items
302
Data through
10 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Vinton Construction Company$17,329,415Low
2Zignego Company, Inc.$17,405,3850.0%
3Michels Road & Stone, Inc.$17,632,592+2.0%
4Hoffman Construction Company$19,826,483+14%
WisDOT contract 20250513020: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Vinton Construction Company2. Zignego Company, Inc.3. Michels Road & Stone, Inc.4. Hoffman Construction Company
1Removing small pipe culverts (203.0100)EACH7$2,540.00$150.00$2,540.00$3,000.00
2Removing structure (structure) 01. C-05-0800 (203.0220)EACH1$6,500.00$10,000$14,000$15,000
3Removing concrete pavement (204.0100)SY1,515$2.00$6.65$5.00$10.00
4Removing asphaltic surface butt joints (204.0115)SY15$89.70$89.70$89.70$89.70
5Removing curb & gutter (204.0150)LF162$5.00$5.00$6.00$10.00
6Removing fence (204.0170)LF4,070$2.50$2.50$2.50$2.50
7Removing delineators and markers (204.0180)EACH19$50.00$50.00$50.00$50.00
8Removing manholes (204.0210)EACH3$510.00$1,050.00$510.00$300.00
9Removing inlets (204.0220)EACH3$353.00$575.00$353.00$300.00
10Removing storm sewer (size) 01. 21-inch (204.0245)LF30$27.00$72.50$27.00$15.00
11Removing storm sewer (size) 02. 24-inch (204.0245)LF139$27.00$33.00$27.00$20.00
12Removing storm sewer (size) 03. 30-inch (204.0245)LF40$27.00$30.50$27.00$25.00
13Removing (item description) 01. communication vault (204.9060.S)EACH2$250.00$250.00$250.00$250.00
14Removing (item description) 01. electrical conductors from existing conduit (204.9090.S)LF350$2.00$2.00$2.00$2.00
15Excavation common (205.0100)CY103,970$16.10$13.90$10.00$20.00
16Excavation for structures bridges (structure) 01. B-5-696 (206.1001)EACH1$54,000$20,000$57,000$550,000
17Excavation for structures culverts (structure) 01. C-05-0800 (206.2001)EACH1$16,300$20,000$87,000$45,000
18Backfill structure type A (210.1500)TON1,216$30.78$40.00$42.10$45.00
19Backfill structure type B (210.2500)TON256$33.04$40.00$73.00$45.00
20Finishing roadway (project) 01. 1130-68-77 (213.0100)EACH1$7,500.00$1,000.00$4,500.00$100.00
21Obliterating old road (214.0100)STA6$0.01$1,500.00$800.00$500.00
22Base aggregate dense 3/4-inch (305.0110)TON1,890$29.35$29.00$30.30$35.14
23Base aggregate dense 1 1/4-inch (305.0120)TON31,388$13.77$13.50$18.70$25.14
24Base aggregate open-graded (310.0115)CY73.70$59.40$100.00$100.00$50.00
25Breaker run (311.0115)CY331$50.00$50.00$75.00$80.00
26Select crushed material (312.0110)TON66,280$13.08$13.30$15.00$25.00
27Coloring concrete wisdot red (405.0100)CY888$75.00$150.00$75.00$75.00
28Coloring concrete custom (405.0200)CY117$80.00$200.00$50.00$80.00
29Concrete pavement 9-inch (415.0090)SY6,264$64.83$63.66$60.82$64.83
30Concrete pavement 9 1/2-inch (415.0095)SY21,975$68.47$58.65$65.07$68.47
31Concrete pavement approach slab (415.0410)SY211$225.00$215.00$225.57$225.00
32Concrete truck apron 12-inch (415.2010)SY1,863$82.50$85.00$84.00$82.50
33Concrete pavement joint filling (415.4100)SY34,264$2.00$1.60$1.60$2.00
34Drilled tie bars (416.0610)EACH1,828$9.00$10.00$11.59$9.00
35Drilled dowel bars (416.0620)EACH22$16.50$50.00$45.12$16.50
36HMA cold weather paving (450.4000)TON539$3.30$3.30$3.30$3.30
37Tack coat (455.0605)GAL1,828$3.20$3.20$3.20$3.20
38Incentive density HMA pavement (460.2000)DOL4,390$1.00$1.00$1.00$1.00
39HMA pavement 3 LT 58-28 S (460.5223)TON3,823$96.30$96.30$96.30$96.30
40HMA pavement 4 LT 58-28 S (460.5224)TON2,899$98.40$98.40$98.40$98.40
41Asphaltic surface (465.0105)TON734$137.00$137.00$137.00$137.00
42Asphaltic surface temporary (465.0125)TON77$182.90$182.90$182.90$182.90
43Asphaltic flumes (465.0315)SY66$89.70$89.70$89.70$89.70
44Asphaltic rumble strips, shoulder divided roadway (465.0510)LF3,240$1.67$1.90$1.25$1.65
45Ice hot weather concreting (501.1000.S)LB10,875$0.75$0.75$0.75$0.75
46Concrete masonry bridges (502.0100)CY456$730.00$730.00$900.00$700.00
47Protective surface treatment (502.3200)SY2,124$2.30$2.30$3.65$3.00
48Pigmented surface sealer (502.3210)SY440$14.00$14.00$9.50$3.50
49Adhesive anchors no. 5 bar (502.4205)EACH47$27.00$27.00$27.00$27.00
50Prestressed girder type I 45W-inch (503.0146)LF2,818$220.00$220.00$210.00$245.00
51Concrete masonry culverts (504.0100)CY36$1,126.00$1,126.00$1,126.00$1,126.00
52Bar steel reinforcement HS structures (505.0400)LB23,120$1.14$0.96$1.17$1.12
53Bar steel reinforcement HS coated structures (505.0600)LB238,000$1.05$1.04$1.31$1.30
54Bar steel reinforcement HS stainless structures (505.0800.S)LB2,990$3.14$3.14$3.56$4.00
55Bar couplers no. 5 (505.0905)EACH19$50.00$43.50$50.00$50.00
56Bearing pads elastomeric non- laminated (506.2605)EACH52$74.00$74.00$205.78$150.00
57Steel diaphragms (structure) 01. B- 5-696 (506.4000)EACH48$820.00$820.00$681.89$840.00
58Temporary shoring (structure) 01. C-05-0800 (511.1200)SF1,682$45.00$45.00$45.00$45.00
59Railing tubular screening (513.4091)LF516$305.50$280.00$268.30$285.00
60Rubberized membrane waterproofing (516.0500)SY67$60.00$60.00$64.11$33.24
61Concrete staining (structure) 01. B- 5-696 (517.1010.S)SF9,108$2.49$2.49$2.33$2.00
62Concrete staining multi-color (structure) 01. B-5-696 (517.1015.S)SF1,514$5.24$5.24$3.60$4.00
63Architectural surface treatment (structure) 01. B-5-696 (517.1050.S)SF1,514$13.00$13.00$19.00$25.00
64Concrete collars for pipe (520.8000)EACH1$915.00$2,280.00$915.00$1,000.00
65Apron endwalls for culvert pipe reinforced concrete 18-inch (522.1018)EACH15$1,360.00$1,710.00$1,360.00$2,000.00
66Apron endwalls for culvert pipe reinforced concrete 21-inch (522.1021)EACH2$1,527.00$1,790.00$1,527.00$2,100.00
67Apron endwalls for culvert pipe reinforced concrete 24-inch (522.1024)EACH3$1,793.00$1,890.00$1,793.00$2,200.00
68Concrete masonry ancillary structures type NS (531.1100)CY36.40$800.00$800.00$800.00$800.00
69Steel reinforcement HS ancillary structures type NS (531.1140)LB3,480$4.00$4.00$4.00$4.00
70Steel reinforcement HS coated ancillary structures type NS (531.1160)LB2,280$4.00$4.00$4.00$4.00
71Drilling shaft 24-inch (531.2024)LF20$75.00$75.00$75.00$75.00
72Drilling shaft 36-inch (531.2036)LF254$200.83$190.00$190.00$190.00
73Drilling shaft 42-inch (531.2042)LF151$225.00$225.00$225.00$225.00
74Foundation camera pole 50-FT (531.4050)EACH1$2,500.00$2,500.00$2,500.00$2,500.00
75Foundation single-shaft type MC-III (structure) 01. S-05-0438 (531.5130)EACH1$7,420.00$7,420.00$7,420.00$7,420.00
76Foundation single-shaft type MC-III (structure) 02. S-05-0446 (531.5130)EACH1$7,420.00$7,420.00$7,420.00$7,420.00
77Foundation single-shaft type MC- IV (structure) 01. S-05-0441 (531.5140)EACH1$9,490.00$9,490.00$9,490.00$9,490.00
78Foundation single-shaft type TF-II (structure) 01. S-05-0443 (531.5420)EACH2$6,250.00$6,250.00$6,250.00$6,250.00
79Foundation two-shaft type FC-II (structure) 01. S-05-0432 (531.6020)EACH1$19,630$19,630$19,630$19,630
80Foundation two-shaft type FC-II (structure) 02. S-05-0442 (531.6020)EACH1$23,320$23,320$23,320$23,320
81Foundation two-shaft type FF-I (structure) 01. S-05-0439 (531.6110)EACH1$57,925$57,925$57,925$57,925
82Foundation two-shaft type FF-IV (structure) 01. S-05-0440 (531.6140)EACH1$61,965$61,965$61,965$61,965
83Anchor assemblies poles on structures (531.8990)EACH2$675.00$675.00$1,795.00$675.00
84Monotube cantilever type III (structure) 01. S-05-0438 (532.5130)EACH1$24,000$24,000$24,000$24,000
85Monotube cantilever type III (structure) 02. S-05-0446 (532.5130)EACH1$28,000$28,000$28,000$28,000
86Monotube cantilever type IV (structure) 01. S-05-0441 (532.5140)EACH1$28,000$28,000$28,000$28,000
87Truss full span 2-chord type NS (structure) 01. S-05-0423 (532.5400)EACH1$118,000$118,000$118,000$118,000
88Truss full span 2-chord type II (structure) 01. S-05-0443 (532.5420)EACH1$76,000$76,000$76,000$76,000
89Truss cantilever 4-chord type NS (structure) 01. S-05-0431 (532.6000)EACH1$70,000$70,000$70,000$70,000
90Truss cantilever 4-chord type NS (structure) 02. S-05-0433 (532.6000)EACH1$70,000$70,000$70,000$70,000
91Truss cantilever 4-chord type II (structure) 01. S-05-0432 (532.6020)EACH1$61,000$61,000$61,000$61,000
92Truss cantilever 4-chord type II (structure) 02. S-05-0442 (532.6020)EACH1$61,000$61,000$61,000$61,500
93Truss full span 4-chord type I (structure) 01. S-05-0439 (532.6110)EACH1$73,000$73,000$73,000$73,000
94Truss full span 4-chord type IV (structure) 01. S-05-0440 (532.6140)EACH1$141,500$141,500$141,500$141,500
95Piling steel HP 12-inch X 53 LB (550.1120)LF5,120$15.00$15.00$71.00$55.00
96Concrete curb & gutter 18-inch type A (601.0405)LF960$21.00$19.00$19.00$21.00
97Concrete curb & gutter 30-inch type A (601.0409)LF9,586$19.75$23.00$23.00$19.75
98Concrete curb & gutter 30-inch type D (601.0411)LF1,300$17.25$20.00$20.00$17.25
99Concrete curb & gutter 4-inch sloped 36-inch type A (601.0551)LF525$38.45$25.00$25.00$38.45
100Concrete curb & gutter 6-inch sloped 36-inch type D (601.0557)LF384$23.00$22.00$22.00$23.00
101Concrete curb & gutter 4-inch sloped 30-inch type R (601.0581)LF1,059$22.00$24.00$24.00$22.00
102Concrete curb pedestrian (601.0600)LF369$48.00$45.00$45.00$48.00
103Concrete sidewalk 4-inch (602.0405)SF34,408$6.50$5.25$5.25$6.20
104Curb ramp detectable warning field natural patina (602.0515)SF520$34.00$34.00$34.00$34.00
105Curb ramp detectable warning field radial natural patina (602.0615)SF101$55.00$50.00$50.00$55.00
106Concrete rumble strips, shoulder divided roadway (602.3210)LF3,310$1.67$1.65$1.25$1.65
107Concrete barrier temporary precast delivered (603.8000)LF10,935$10.00$9.82$13.00$11.76
108Concrete barrier temporary precast installed (603.8125)LF12,235$3.00$5.60$4.00$4.31
109Anchoring concrete barrier temporary precast (603.8500)LF500$7.00$20.00$12.50$11.25
110Slope paving concrete (604.0400)SY594$45.00$45.00$45.00$45.00
111Slope paving select crushed material (604.0600)SY224$45.00$50.00$45.00$45.00
112Riprap medium (606.0200)CY106.70$98.17$84.00$140.00$175.00
113Riprap heavy (606.0300)CY14$125.00$82.25$400.00$225.00
114Storm sewer pipe reinforced concrete class III 12-inch (608.0312)LF293$76.80$121.00$76.80$75.00
115Storm sewer pipe reinforced concrete class III 15-inch (608.0315)LF37$89.80$130.00$89.80$85.00
116Storm sewer pipe reinforced concrete class III 18-inch (608.0318)LF3,113$86.45$128.00$86.45$80.00
117Storm sewer pipe reinforced concrete class III 21-inch (608.0321)LF185$98.15$174.00$98.15$90.00
118Storm sewer pipe reinforced concrete class III 24-inch (608.0324)LF2,346$103.75$122.00$103.75$100.00
119Storm sewer pipe reinforced concrete class III 30-inch (608.0330)LF66$144.70$253.00$144.70$145.00
120Storm sewer pipe reinforced concrete class IV 24-inch (608.0424)LF508$109.40$264.00$109.40$115.00
121Storm sewer pipe class III-A 12- inch (608.3012)LF25$73.15$161.00$73.15$75.00
122Reconstructing inlets (611.0430)EACH2$1,050.00$834.00$1,050.00$1,500.00
123Manhole covers type J (611.0530)EACH3$467.00$911.00$467.00$900.00
124Inlet covers type A (611.0600)EACH86$675.00$1,100.00$675.00$1,200.00
125Inlet covers type BW (611.0610)EACH16$708.00$1,180.00$708.00$1,200.00
126Inlet covers type C (611.0612)EACH4$490.00$1,020.00$490.00$900.00
127Inlet covers type MS (611.0642)EACH1$478.00$1,000.00$478.00$900.00
128Inlet covers type T (611.0652)EACH6$944.00$1,450.00$944.00$1,500.00
129Catch basins 5-FT diameter (611.1005)EACH20$6,080.00$4,780.00$6,080.00$6,000.00
130Manholes 4-FT diameter (611.2004)EACH4$4,732.00$3,570.00$4,732.00$4,000.00
131Manholes 5-FT diameter (611.2005)EACH2$6,324.00$4,120.00$6,324.00$7,000.00
132Manholes 8-FT diameter (611.2008)EACH1$15,984$15,600$15,984$20,000
133Inlets 4-FT diameter (611.3004)EACH88$4,437.00$2,990.00$4,437.00$4,000.00
134Inlets median 1 grate (611.3901)EACH1$3,185.00$2,790.00$3,185.00$3,000.00
135Cover plates temporary (611.8120.S)EACH2$435.00$1,000.00$435.00$750.00
136Pipe underdrain 6-inch (612.0106)LF4,100$20.30$15.00$13.00$25.00
137Pipe underdrain wrapped 6-inch (612.0406)LF472$8.50$30.00$5.00$10.00
138Steel thrie beam bullnose terminal (614.0220)EACH2$15,500$15,500$15,500$15,500
139Steel thrie beam (614.0230)LF300$39.00$39.00$39.00$39.00
140Crash cushions temporary (614.0905)EACH3$7,250.00$7,250.00$7,250.00$4,750.00
141MGS guardrail 3 (614.2300)LF1,038$29.00$29.00$29.00$29.00
142MGS thrie beam transition (614.2500)LF39$98.00$98.00$98.00$98.00
143MGS guardrail terminal eat (614.2610)EACH5$4,700.00$4,700.00$4,700.00$4,700.00
144MGS guardrail terminal type 2 (614.2620)EACH4$3,600.00$3,600.00$3,600.00$3,600.00
145Fence chain link 6-FT (616.0206)LF7,650$23.00$23.00$23.00$23.00
146Fence safety (616.0700.S)LF1,000$7.00$7.00$7.00$7.00
147Maintenance and repair of haul roads (project) 01. 1130-68-77 (618.0100)EACH1$0.01$1.00$1.00$100.00
148Mobilization (619.1000)EACH1$1,668,000$1,727,000$1,671,390$1,827,210
149Concrete median sloped nose (620.0300)SF1,666$14.00$14.50$14.50$14.00
150Water (624.0100)MGAL447$0.01$50.00$60.00$100.00
151Salvaged topsoil (625.0500)SY109,165$0.01$0.75$2.00$0.01
152Mulching (627.0200)SY3,802$0.65$0.65$0.65$0.65
153Silt fence (628.1504)LF8,044$2.00$2.00$2.00$2.00
154Silt fence maintenance (628.1520)LF8,044$0.01$0.01$0.01$0.01
155Mobilizations erosion control (628.1905)EACH9$1.00$1.00$1.00$1.00
156Mobilizations emergency erosion control (628.1910)EACH9$1.00$1.00$1.00$1.00
157Erosion mat class I type A (628.2002)SY105,363$1.10$1.10$1.10$1.10
158Inlet protection type A (628.7005)EACH3$200.00$200.00$200.00$200.00
159Inlet protection type B (628.7010)EACH16$70.00$70.00$70.00$70.00
160Inlet protection type C (628.7015)EACH83$70.00$70.00$70.00$70.00
161Inlet protection type D (628.7020)EACH10$125.00$125.00$125.00$125.00
162Temporary ditch checks (628.7504)LF400$8.00$8.00$8.00$8.00
163Culvert pipe checks (628.7555)EACH27$16.00$16.00$16.00$16.00
164Tracking pads (628.7560)EACH8$0.01$1,150.00$1,500.00$100.00
165Rock bags (628.7570)EACH90$16.00$16.00$16.00$16.00
166Fertilizer type B (629.0210)CWT69.50$125.00$125.00$125.00$125.00
167Seeding mixture no. 20 (630.0120)LB103$6.75$6.75$6.75$6.75
168Seeding mixture no. 30 (630.0130)LB4,742$6.75$6.75$6.75$6.75
169Seeding temporary (630.0200)LB1,748$2.00$2.00$2.00$2.00
170Seed water (630.0500)MGAL2,371$0.01$0.01$0.01$0.01
171Trees (species, root, size) 01. cole'S select serviceberry, B&B, 5-FT (632.0101)EACH9$50.00$50.00$50.00$50.00
172Shrubs (species, root, size) 01. hydrangea limelight, shrubs cont, 3-FT (632.0201)EACH27$50.00$50.00$50.00$50.00
173Shrubs (species, root, size) 02. weigela florida verweig, cont, 1-FT (632.0201)EACH63$50.00$50.00$50.00$50.00
174Landscape planting surveillance and care cycles (632.9101)EACH72$200.00$200.00$200.00$200.00
175Delineator posts steel (633.0100)EACH18$75.00$75.00$75.00$75.00
176Delineator reflectors (633.0500)EACH18$15.00$15.00$15.00$15.00
177Delineators barrier wall (633.1000)EACH12$100.00$100.00$100.00$100.00
178Markers culvert end (633.5200)EACH20$85.00$85.00$85.00$85.00
179Posts wood 4X6-inch X 14-FT (634.0614)EACH78$125.00$125.00$125.00$125.00
180Posts wood 4X6-inch X 16-FT (634.0616)EACH2$145.00$145.00$145.00$145.00
181Posts tubular steel 2X2-inch X 8-FT (634.0808)EACH4$300.00$300.00$300.00$300.00
182Posts tubular steel 2X2-inch X 14- FT (634.0814)EACH8$300.00$300.00$300.00$300.00
183Sign supports structural steel HS (635.0200)LB1,338$7.00$7.00$7.00$7.00
184Signs type I reflective SH (637.1220)SF2,744.83$26.00$26.00$26.00$26.00
185Signs type II reflective H (637.2210)SF1,095.64$24.50$24.50$24.50$24.50
186Signs type II reflective F (637.2230)SF88.75$29.00$29.00$29.00$29.00
187Removing signs type I (638.2601)EACH2$500.00$500.00$500.00$500.00
188Field office type D (642.5401)EACH1$5,000.00$20,000$27,000$100.00
189Traffic control drums (643.0300)DAY29,907$0.17$0.17$0.17$0.17
190Traffic control barricades type III (643.0420)DAY11,300$0.55$0.55$0.55$0.55
191Traffic control flexible tubular marker posts (643.0500)EACH16$39.95$39.95$39.95$39.95
192Traffic control flexible tubular marker bases (643.0600)EACH16$13.15$13.15$13.15$13.15
193Traffic control warning lights type A (643.0705)DAY20,950$0.14$0.14$0.14$0.14
194Traffic control warning lights type C (643.0715)DAY6,811$0.18$0.18$0.18$0.18
195Traffic control arrow boards (643.0800)DAY84$15.00$15.00$15.00$15.00
196Connected arrow board (643.0810.S)DAY248$17.50$17.50$17.50$17.50
197Traffic control signs (643.0900)DAY10,139$0.35$0.35$0.35$0.35
198Traffic control covering signs type I (643.0910)EACH5$240.00$240.00$240.00$240.00
199Traffic control covering signs type II (643.0920)EACH29$98.00$98.00$98.00$98.00
200Traffic control signs PCMS (643.1050)DAY86$32.50$32.50$32.50$32.50
201Connected work zone start and end location markers (643.1220.S)DAY324$7.75$7.75$7.75$7.75
202Temporary marking line paint 6- inch (643.3165)LF23,005$0.20$0.20$0.20$0.20
203Temporary marking line removable tape 6-inch (643.3180)LF2,408$2.20$2.20$2.20$2.20
204Traffic control (643.5000)EACH1$138,525$138,525$138,525$138,525
205Temporary pedestrian barricade (644.1810)LF90$15.00$15.00$15.00$15.00
206Geotextile type C (645.0105)SY392$3.50$10.00$10.00$5.00
207Geotextile type DF schedule A (645.0111)SY2,051$5.00$10.00$5.00$3.00
208Geotextile type HR (645.0120)SY375.20$5.00$2.60$11.00$5.00
209Marking line epoxy 6-inch (646.2020)LF24,592$0.64$0.64$0.64$0.64
210Marking line epoxy 10-inch (646.4020)LF6,342$1.38$1.38$1.38$1.38
211Marking arrow epoxy (646.5020)EACH65$421.00$421.00$421.00$421.00
212Marking word epoxy (646.5120)EACH4$483.00$483.00$483.00$483.00
213Marking dotted extension epoxy 18-inch (646.6320)LF279$17.50$17.50$17.50$17.50
214Marking diagonal epoxy 12-inch (646.7120)LF319$17.25$17.25$17.25$17.25
215Marking chevron epoxy 24-inch (646.7220)LF182$29.00$29.00$29.00$29.00
216Marking chevron epoxy 12-inch (646.7320)LF223$28.00$28.00$28.00$28.00
217Marking crosswalk epoxy transverse line 6-inch (646.7420)LF910$16.75$16.75$16.75$16.75
218Marking curb epoxy (646.8120)LF168$8.50$8.50$8.50$8.50
219Marking island nose epoxy (646.8220)EACH8$331.70$331.70$331.70$331.70
220Marking removal line 4-inch (646.9000)LF5,406$0.45$0.45$0.45$0.45
221Marking removal line 6-inch (646.9002)LF5,406$0.50$0.50$0.50$0.50
222Marking removal special marking water blasting (646.9310)EACH2$825.00$825.00$825.00$825.00
223Conduit rigid metallic 2-inch (652.0125)LF24$475.00$475.00$475.00$475.00
224Conduit rigid nonmetallic schedule 40 2-inch (652.0225)LF8,273$10.00$10.00$10.00$10.00
225Conduit rigid nonmetallic schedule 40 3-inch (652.0235)LF2,441$14.00$14.00$14.00$14.00
226Conduit rigid nonmetallic schedule 80 3-inch (652.0335)LF1,672$16.00$16.00$16.00$16.00
227Conduit special 3-inch (652.0615)LF221$32.00$32.00$32.00$32.00
228Install conduit into existing item (652.0700.S)EACH4$250.00$250.00$250.00$250.00
229Pull boxes non-conductive 24X36- inch (653.0154)EACH4$2,100.00$2,100.00$2,100.00$2,100.00
230Pull boxes non-conductive 24X42- inch (653.0164)EACH42$2,200.00$2,200.00$2,200.00$2,200.00
231Junction boxes 18X12X6-inch (653.0222)EACH2$2,950.00$2,950.00$2,950.00$2,950.00
232Removing pull boxes (653.0905)EACH1$75.00$75.00$75.00$75.00
233Concrete bases type 5 (654.0105)EACH57$1,575.00$1,575.00$1,575.00$1,575.00
234Concrete bases type 7 (654.0107)EACH4$1,750.00$1,750.00$1,750.00$1,750.00
235Concrete control cabinet bases type L30 (654.0230)EACH2$2,200.00$2,200.00$2,200.00$2,200.00
236Electrical wire lighting 12 AWG (655.0610)LF17,775$0.90$0.90$0.90$0.90
237Electrical wire lighting 8 AWG (655.0620)LF19,880$1.30$1.30$1.30$1.30
238Electrical wire lighting 6 AWG (655.0625)LF40,532$2.00$2.00$2.00$2.00
239Electrical service meter breaker pedestal (location) 01. CB2400 (656.0201)EACH1$1,950.00$1,950.00$1,950.00$1,950.00
240Electrical service meter breaker pedestal (location) 02. CB100 (656.0201)EACH1$1,950.00$1,950.00$1,950.00$1,950.00
241Electrical service breaker disconnect box (location) 01. CB12- 1 (656.0501)EACH1$800.00$800.00$800.00$800.00
242Transformer bases breakaway 11 1/2-inch bolt circle (657.0255)EACH57$645.00$645.00$645.00$645.00
243Poles type 5-aluminum (657.0322)EACH55$2,060.00$2,060.00$2,060.00$2,060.00
244Luminaire arms truss type 4-inch clamp 12-FT (657.0709)EACH2$790.00$790.00$790.00$790.00
245Luminaire arms truss type 4 1/2- inch clamp 12-FT (657.0710)EACH58$790.00$790.00$790.00$790.00
246Luminaires utility LED B (659.1120)EACH60$400.00$400.00$400.00$400.00
247Lighting control cabinets 120/240 30-inch (659.2130)EACH2$8,600.00$8,600.00$8,600.00$8,600.00
248Ramp closure gates 26-FT (662.1026.S)EACH2$25,345$25,345$25,345$25,345
249Ramp closure gates 37-FT (662.1037.S)EACH1$26,145$26,145$26,145$26,145
250Ramp closure gates 40-FT (662.1040.S)EACH1$26,345$26,345$26,345$26,345
251Field system integrator (670.0101)EACH1$22,425$22,425$22,425$22,425
252ITS documentation (670.0201)EACH1$6,500.00$6,500.00$6,500.00$6,500.00
253Conduit HDPE 3-duct 2-inch (671.0132)LF4,829$10.00$10.00$10.00$10.00
254Conduit HDPE directional bore 3- duct 2-inch (671.0232)LF461$30.00$30.00$30.00$30.00
255Fiber optic cable marker (671.0300)EACH16$75.00$75.00$75.00$75.00
256Communication vault type 1 (673.0105)EACH5$2,250.00$2,250.00$2,250.00$2,250.00
257Tracer wire marker posts (673.0200)EACH10$125.00$125.00$125.00$125.00
258Install pole mounted cabinet (673.1225.S)EACH3$2,655.00$2,655.00$2,655.00$2,655.00
259Cable microwave detector (674.0200)LF2,943$3.50$3.50$3.50$3.50
260Remove cable (674.0300)LF4,342$2.00$2.00$2.00$2.00
261Install mounted controller microwave detector assembly (675.0300)EACH2$3,400.00$3,400.00$3,400.00$3,400.00
262Install camera pole 50-FT (677.0150)EACH1$4,404.00$4,404.00$4,404.00$4,404.00
263Install camera assembly (677.0200)EACH1$2,505.00$2,505.00$2,505.00$2,505.00
264Install fiber optic cable outdoor plant 12-CT (678.0012)LF1,844$2.00$2.00$2.00$2.00
265Install fiber optic cable outdoor plant 72-CT (678.0072)LF4,716$2.00$2.00$2.00$2.00
266Fiber optic splice enclosure (678.0200)EACH3$1,450.00$1,450.00$1,450.00$1,450.00
267Fiber optic splice (678.0300)EACH148$55.00$55.00$55.00$55.00
268Fiber optic termination (678.0400)EACH4$230.00$230.00$230.00$230.00
269Communication system testing (678.0501)EACH1$6,300.00$6,300.00$6,300.00$6,300.00
270Install ethernet switches (678.0600)EACH1$975.00$975.00$975.00$975.00
271Sawing asphalt (690.0150)LF5,073$2.00$1.65$1.65$1.65
272Sawing concrete (690.0250)LF5,889$3.00$2.35$2.35$2.35
273Incentive strength concrete structures (715.0502)DOL6,180$1.00$1.00$1.00$1.00
274Incentive strength concrete barrier (715.0603)DOL1,874$1.00$1.00$1.00$1.00
275Incentive flexural strength concrete pavement (715.0715)DOL5,410$1.00$1.00$1.00$1.00
276Incentive compressive strength concrete pavement (715.0720)DOL18,050$1.00$1.00$1.00$1.00
277Incentive iri ride (740.0440)DOL7,150$1.00$1.00$1.00$1.00
278On-the-job training apprentice at $5.00/HR (ASP.1T0A)HRS2,100$5.00$5.00$5.00$5.00
279On-the-job training graduate at $5.00/HR (ASP.1T0G)HRS5,760$5.00$5.00$5.00$5.00
280Special 01. HPC masonry structures (SPV.0035)CY994$980.00$980.00$900.00$700.00
281Special 02. planting mixture (SPV.0035)CY370$70.00$70.00$70.00$70.00
282Special 01. anchor bolt cover shroud (SPV.0060)EACH4$375.00$375.00$375.00$375.00
283Special 02. temporary street lighting system (SPV.0060)EACH1$3,500.00$3,500.00$3,500.00$3,500.00
284Special 03. install ethernet extender (SPV.0060)EACH4$450.00$450.00$450.00$450.00
285Special 04. baseline CPM progress schedule (SPV.0060)EACH1$3,000.00$1,000.00$3,500.00$100.00
286Special 05. CPM progress schedule and accepted revisions (SPV.0060)EACH12$200.00$100.00$100.00$1.00
287Special 06. construction staking survey project 1130-68-77 (SPV.0060)EACH1$102,757$102,757$100,000$132,757
288Special 07. decorative silhouette (SPV.0060)EACH2$5,600.00$5,600.00$3,800.00$2,500.00
289Special 08. adjusting sanitary manhole covers (SPV.0060)EACH4$1,100.00$855.00$1,100.00$1,500.00
290Special 09. adjusting water valve boxes (SPV.0060)EACH6$300.00$1,500.00$300.00$750.00
291Special 10. maintain and remove crash cushions temporary left in place (SPV.0060)EACH2$750.00$750.00$750.00$500.00
292Special 11. emergency response to traffic involving crash cushion temporary (SPV.0060)EACH12$300.00$300.00$300.00$800.00
293Special 12. emergency response to traffic involving concrete barrier temporary (SPV.0060)EACH24$300.00$300.00$2,800.00$800.00
294Special 01. street sweeping (SPV.0075)HRS152$150.00$210.00$225.00$250.00
295Special 01. concrete curb and gutter 36-inch special (SPV.0090)LF3,441$27.48$28.00$28.00$27.48
296Special 02. removal and salvage of high tension cableguard and posts (SPV.0090)LF2,642$5.00$5.00$5.00$5.00
297Special 03. maintain and remove concrete barrier temporary precast left in place (SPV.0090)LF2,063$0.01$5.00$6.50$6.62
298Special 04. concrete barrier type S42 special (SPV.0090)LF3,748$74.39$87.00$80.81$74.39
299Special 01. longitudinal grooving bridge deck (SPV.0165)SF15,515$0.68$0.67$1.11$0.76
300Special 01. double shredded hardwood mulch (SPV.0180)SY555$11.50$11.50$11.50$11.50
301Special 02. concrete pavement 10 1/2-inch special (SPV.0180)SY11,506$62.27$65.75$57.13$62.27
302Special 03. concrete stamping (SPV.0180)SY1,392$22.50$15.00$18.90$22.50
WisDOT contract 20250513020: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.

Every contract let that day: WisDOT letting of May 13, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy