WisDOT contract 20250513034 bid tabulation
T Edson, 370th Street; Br Wolf River Bridge B-09-0310 (LOC STR, Chippewa County T Edson, 370th Street). Let by Wisconsin DOT on May 13, 2025, Chippewa. 4 bids received; low bid $423,070 by Larson Construction Co., Inc..
- Owner
- Wisconsin DOT
- Letting
- 13 MAY 2025
- Pay items
- 60
- Data through
- 10 NOV 2026
3 of the 4 bids matched their published totals to within a dollar and are shown; the others are left out.
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Larson Construction Co., Inc. | $423,070 | Low |
| 2 | Lunda Construction Company | $462,869 | +9.0% |
| 3 | Radtke Contractors Inc. | $491,309 | +16% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Larson Construction Co., Inc. | 2. Lunda Construction Company | 3. Radtke Contractors Inc. |
|---|---|---|---|---|---|---|
| 1 | Grubbing (201.0205) | STA | 2 | $1.00 | $1.00 | $1.00 |
| 2 | Removing structure over waterway minimal debris (structure) 01. P-9- 932 (203.0260) | EACH | 1 | $28,700 | $115,000 | $65,000 |
| 3 | Excavation common (205.0100) | CY | 79 | $25.00 | $25.00 | $25.00 |
| 4 | Excavation, hauling, and disposal of creosote contaminated soil (205.0506.S) | TON | 100 | $166.00 | $70.00 | $104.55 |
| 5 | Excavation for structures bridges (structure) 01. B-9-310 (206.1001) | EACH | 1 | $24,600 | $15,000 | $45,000 |
| 6 | Borrow (208.0100) | CY | 96 | $29.50 | $29.50 | $29.50 |
| 7 | Backfill structure type A (210.1500) | TON | 354 | $23.00 | $23.00 | $23.00 |
| 8 | Base aggregate dense 3/4-inch (305.0110) | TON | 25 | $59.40 | $59.40 | $59.40 |
| 9 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 200 | $24.85 | $24.85 | $24.85 |
| 10 | HMA cold weather paving (450.4000) | TON | 60 | $4.30 | $4.30 | $4.30 |
| 11 | Tack coat (455.0605) | GAL | 20 | $11.93 | $11.93 | $11.93 |
| 12 | Asphaltic surface (465.0105) | TON | 60 | $183.59 | $183.59 | $183.59 |
| 13 | Asphaltic flumes (465.0315) | SY | 24 | $55.43 | $55.43 | $55.43 |
| 14 | Concrete masonry bridges (502.0100) | CY | 116 | $695.00 | $750.00 | $764.84 |
| 15 | Protective surface treatment (502.3200) | SY | 157 | $4.00 | $5.00 | $3.60 |
| 16 | Bar steel reinforcement HS structures (505.0400) | LB | 4,300 | $1.75 | $1.40 | $1.36 |
| 17 | Bar steel reinforcement HS coated structures (505.0600) | LB | 15,460 | $1.75 | $1.45 | $1.51 |
| 18 | Railing tubular type M (513.4061) | LF | 74 | $375.00 | $300.00 | $310.25 |
| 19 | Rubberized membrane waterproofing (516.0500) | SY | 10 | $75.00 | $25.00 | $74.42 |
| 20 | Pile points (550.0500) | EACH | 14 | $250.00 | $125.00 | $110.78 |
| 21 | Piling steel HP 10-inch X 42 LB (550.1100) | LF | 1,015 | $54.00 | $45.00 | $35.67 |
| 22 | Riprap heavy (606.0300) | CY | 147 | $68.00 | $50.00 | $99.71 |
| 23 | Pipe underdrain wrapped 6-inch (612.0406) | LF | 142 | $8.00 | $8.00 | $8.00 |
| 24 | Maintenance and repair of haul roads (project) 01. 7861-00-70 (618.0100) | EACH | 1 | $1,000.00 | $0.01 | $500.00 |
| 25 | Mobilization (619.1000) | EACH | 1 | $72,500 | $62,794 | $109,110 |
| 26 | Water (624.0100) | MGAL | 5 | $1.00 | $1.00 | $1.00 |
| 27 | Topsoil (625.0100) | SY | 400 | $5.00 | $5.00 | $5.00 |
| 28 | Silt fence (628.1504) | LF | 360 | $2.50 | $2.50 | $2.50 |
| 29 | Silt fence maintenance (628.1520) | LF | 360 | $0.01 | $0.01 | $0.01 |
| 30 | Mobilizations erosion control (628.1905) | EACH | 4 | $615.00 | $615.00 | $615.00 |
| 31 | Mobilizations emergency erosion control (628.1910) | EACH | 2 | $1.00 | $1.00 | $1.00 |
| 32 | Erosion mat urban class I type B (628.2008) | SY | 400 | $2.15 | $2.15 | $2.15 |
| 33 | Turbidity barriers (628.6005) | SY | 120 | $59.00 | $59.00 | $59.00 |
| 34 | Temporary ditch checks (628.7504) | LF | 20 | $8.00 | $8.00 | $8.00 |
| 35 | Rock bags (628.7570) | EACH | 80 | $15.00 | $15.00 | $15.00 |
| 36 | Fertilizer type B (629.0210) | CWT | 5 | $110.00 | $110.00 | $110.00 |
| 37 | Seeding mixture no. 20 (630.0120) | LB | 14 | $50.00 | $50.00 | $50.00 |
| 38 | Seeding temporary (630.0200) | LB | 14 | $17.00 | $17.00 | $17.00 |
| 39 | Seed water (630.0500) | MGAL | 7 | $1.00 | $1.00 | $1.00 |
| 40 | Posts wood 4X6-inch X 12-FT (634.0612) | EACH | 4 | $130.00 | $130.00 | $130.00 |
| 41 | Signs type II reflective F (637.2230) | SF | 12 | $30.00 | $30.00 | $30.00 |
| 42 | Removing signs type II (638.2602) | EACH | 6 | $15.00 | $15.00 | $15.00 |
| 43 | Removing small sign supports (638.3000) | EACH | 7 | $15.00 | $15.00 | $15.00 |
| 44 | Field office type B (642.5001) | EACH | 1 | $3,000.00 | $3,500.00 | $2,887.82 |
| 45 | Traffic control barricades type III (643.0420) | DAY | 1,500 | $0.45 | $0.55 | $0.45 |
| 46 | Traffic control warning lights type A (643.0705) | DAY | 2,200 | $0.25 | $0.25 | $0.25 |
| 47 | Traffic control signs (643.0900) | DAY | 1,100 | $0.45 | $0.40 | $0.45 |
| 48 | Traffic control (643.5000) | EACH | 1 | $1,520.00 | $3,025.00 | $1,520.00 |
| 49 | Geotextile type DF schedule A (645.0111) | SY | 88 | $5.00 | $5.00 | $5.00 |
| 50 | Geotextile type HR (645.0120) | SY | 252 | $3.50 | $5.00 | $5.38 |
| 51 | Construction staking subgrade (650.4500) | LF | 116 | $0.01 | $0.25 | $0.01 |
| 52 | Construction staking base (650.5000) | LF | 116 | $0.01 | $1.25 | $0.01 |
| 53 | Construction staking structure layout (structure) 01. B-09-0310 (650.6501) | EACH | 1 | $2,300.00 | $2,350.00 | $2,300.00 |
| 54 | Construction staking supplemental control (project) 01. 7861-00-70 (650.9911) | EACH | 1 | $400.00 | $463.50 | $400.00 |
| 55 | Construction staking slope stakes (650.9920) | LF | 116 | $0.01 | $5.00 | $0.01 |
| 56 | Sawing asphalt (690.0150) | LF | 40 | $5.00 | $5.00 | $5.00 |
| 57 | Incentive strength concrete structures (715.0502) | DOL | 696 | $1.00 | $1.00 | $1.00 |
| 58 | Installing and maintaining bird deterrent system (station) 01. station 10+00 (999.2000.S) | EACH | 1 | $750.00 | $0.01 | $1.00 |
| 59 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 300 | $5.00 | $5.00 | $5.00 |
| 60 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 600 | $5.00 | $5.00 | $5.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of May 13, 2025. Compiled by Mirage Metrics.