WisDOT contract 20250513038 bid tabulation

T Barron, 14 1/2 Avenue; Barker Creek Bridge B-03-0222 (LOC STR, Barron County T Barron, 14 1/2 Avenue). Let by Wisconsin DOT on May 13, 2025, Barron. 4 bids received; low bid $482,782 by Larson Construction Co., Inc..

Owner
Wisconsin DOT
Letting
13 MAY 2025
Pay items
56
Data through
10 NOV 2026

3 of the 4 bids matched their published totals to within a dollar and are shown; the others are left out.

Bidders

RankBidderTotal bidAgainst the low bid
1Larson Construction Co., Inc.$482,782Low
2Lunda Construction Company$535,931+11%
3Radtke Contractors Inc.$564,549+17%
WisDOT contract 20250513038: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Larson Construction Co., Inc.2. Lunda Construction Company3. Radtke Contractors Inc.
1Grubbing (201.0205)STA2$950.00$950.00$950.00
2Removing structure over waterway minimal debris (structure) 01. P-3- 94 (203.0260)EACH1$26,450$85,000$70,000
3Excavation common (205.0100)CY90$21.10$20.10$20.10
4Excavation, hauling, and disposal of creosote contaminated soil (205.0506.S)TON66$175.00$175.00$109.54
5Excavation for structures bridges (structure) 01. B-3-222 (206.1001)EACH1$21,200$35,000$55,000
6Borrow (208.0100)CY177$20.65$20.65$20.65
7Backfill structure type A (210.1500)TON558$15.44$15.44$31.02
8Finishing roadway (project) 01. 8313-00-70 (213.0100)EACH1$500.00$500.00$500.00
9Base aggregate dense 3/4-inch (305.0110)TON12$103.50$103.50$103.50
10Base aggregate dense 1 1/4-inch (305.0120)TON330$25.50$25.50$25.50
11Tack coat (455.0605)GAL36$12.00$12.00$12.00
12Asphaltic surface (465.0105)TON90$169.07$169.07$169.07
13Concrete masonry bridges (502.0100)CY200$675.00$800.00$650.00
14Protective surface treatment (502.3200)SY183$4.00$3.00$3.72
15Pigmented surface sealer (502.3210)SY50$8.00$5.00$20.61
16Bar steel reinforcement HS structures (505.0400)LB4,360$1.60$1.25$1.38
17Bar steel reinforcement HS coated structures (505.0600)LB29,760$1.60$1.28$1.40
18Rubberized membrane waterproofing (516.0500)SY10$55.00$25.00$73.99
19Piling cip concrete 10 3/4 X 0.365- inch (550.2106)LF955$75.00$60.00$49.44
20Riprap heavy (606.0300)CY140$68.00$100.00$91.19
21Pipe underdrain wrapped 6-inch (612.0406)LF146$8.00$8.00$4.14
22Maintenance and repair of haul roads (project) 01. 8313-00-70 (618.0100)EACH1$1,000.00$0.01$500.00
23Mobilization (619.1000)EACH1$67,150$42,399$99,359
24Water (624.0100)MGAL8$1.00$1.00$1.00
25Salvaged topsoil (625.0500)SY580$3.00$3.00$3.00
26Silt fence (628.1504)LF625$2.50$2.50$2.50
27Silt fence maintenance (628.1520)LF625$0.01$0.01$0.01
28Mobilizations erosion control (628.1905)EACH5$1.00$1.00$1.00
29Mobilizations emergency erosion control (628.1910)EACH3$1.00$1.00$1.00
30Erosion mat urban class I type B (628.2008)SY390$2.50$2.50$2.50
31Erosion mat class III type D (628.2039)SY280$14.30$14.30$14.30
32Turbidity barriers (628.6005)SY210$53.00$53.00$53.00
33Soil stabilizer type A (628.6505)ACRE0.07$11,000$11,000$11,000
34Fertilizer type A (629.0205)CWT0.50$525.00$525.00$525.00
35Seeding mixture no. 20 (630.0120)LB29$35.00$35.00$35.00
36Seeding temporary (630.0200)LB18$13.50$13.50$13.50
37Posts wood 4X6-inch X 14-FT (634.0614)EACH4$130.00$130.00$130.00
38Signs type II reflective F (637.2230)SF12$30.00$30.00$30.00
39Removing signs type II (638.2602)EACH4$15.00$15.00$15.00
40Removing small sign supports (638.3000)EACH4$15.00$15.00$15.00
41Field office type B (642.5001)EACH1$2,900.00$3,000.00$4,000.00
42Traffic control barricades type III (643.0420)DAY1,260$0.40$0.40$0.40
43Traffic control warning lights type A (643.0705)DAY1,960$0.10$0.10$0.10
44Traffic control signs (643.0900)DAY980$0.40$0.40$0.40
45Traffic control (643.5000)EACH1$3,339.00$3,339.00$3,339.00
46Geotextile type DF schedule A (645.0111)SY96$5.00$5.00$4.98
47Geotextile type HR (645.0120)SY240$3.50$5.00$5.17
48Construction staking base (650.5000)LF200$0.01$0.01$0.01
49Construction staking structure layout (structure) 01. B-3-222 (650.6501)EACH1$1,775.00$3,000.00$1,775.00
50Construction staking supplemental control (project) 01. 8313-00-70 (650.9911)EACH1$338.00$1,000.00$838.00
51Construction staking slope stakes (650.9920)LF200$1.40$3.00$1.40
52Incentive strength concrete structures (715.0502)DOL1,200$1.00$1.00$1.00
53Maintaining bird deterrent system (station) 01. 10+00 (999.2005.S)EACH1$500.00$0.01$0.01
54On-the-job training apprentice at $5.00/HR (ASP.1T0A)HRS300$5.00$5.00$5.00
55On-the-job training graduate at $5.00/HR (ASP.1T0G)HRS300$5.00$5.00$5.00
56Special 01. select crush material for travel corridor (SPV.0195)TON20$75.00$125.00$64.74
WisDOT contract 20250513038: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.

Every contract let that day: WisDOT letting of May 13, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy