WisDOT contract 20250513040 bid tabulation
Superior - Wentworth; Bong Bridge B-16-0038-0001 to 0019 (USH 002, Douglas County Superior - Wentworth). Let by Wisconsin DOT on May 13, 2025, Douglas. 2 bids received; low bid $6,383,048 by Lunda Construction Company.
- Owner
- Wisconsin DOT
- Letting
- 13 MAY 2025
- Pay items
- 81
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Lunda Construction Company | $6,383,048 | Low |
| 2 | Northland Constructors of Duluth, Mathy | $6,882,500 | +8.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Lunda Construction Company | 2. Northland Constructors of Duluth, Mathy |
|---|---|---|---|---|---|
| 1 | Removing structure over waterway debris capture (structure) 01. B-16- 0038 (203.0270) | EACH | 1 | $150,000 | $1,582,500 |
| 2 | Removing concrete barrier (204.0157) | LF | 285 | $162.10 | $88.00 |
| 3 | Removing concrete bases (204.0195) | EACH | 18 | $2,916.00 | $2,500.00 |
| 4 | Removing (item description) 01. lighting units (204.9060.S) | EACH | 47 | $572.00 | $600.00 |
| 5 | Removing (item description) 02. luminaires (204.9060.S) | EACH | 41 | $146.00 | $152.00 |
| 6 | Removing (item description) 03. overhead sign luminaires (204.9060.S) | EACH | 2 | $565.00 | $600.00 |
| 7 | Removing (item description) 01. electrical conductors from existing conduit (204.9090.S) | LF | 10,795 | $3.75 | $3.90 |
| 8 | Removing (item description) 02. or abandoning existing conduit (204.9090.S) | LF | 3,160 | $7.20 | $7.50 |
| 9 | Finishing roadway (project) 01. 8680-00-74 (213.0100) | EACH | 1 | $2,500.00 | $4,500.00 |
| 10 | Concrete masonry bridges (502.0100) | CY | 96 | $2,000.00 | $1,600.00 |
| 11 | Pigmented surface sealer reseal (502.3205) | SY | 4,950 | $20.00 | $9.00 |
| 12 | Pigmented surface sealer (502.3210) | SY | 399 | $20.00 | $12.00 |
| 13 | Adhesive anchors no. 5 bar (502.4205) | EACH | 753 | $20.00 | $25.00 |
| 14 | Bar steel reinforcement HS coated structures (505.0600) | LB | 8,430 | $9.15 | $2.50 |
| 15 | Concrete surface repair (509.1500) | SF | 1,860 | $150.00 | $340.00 |
| 16 | Structure overcoating cleaning and priming (structure) 01. B-16-38 (517.3001.S) | EACH | 1 | $600,000 | $625,000 |
| 17 | Containment and collection of waste materials (structure) 01. B- 16-38 (517.4001.S) | EACH | 1 | $300,000 | $315,000 |
| 18 | Portable decontamination facility 01. B-16-38 (517.6001.S) | EACH | 1 | $10,000 | $10,500 |
| 19 | Anchor assemblies poles on structures (531.8990) | EACH | 24 | $449.00 | $600.00 |
| 20 | Concrete barrier single-faced 32- inch (603.0105) | LF | 285 | $384.64 | $300.00 |
| 21 | Concrete barrier temporary precast delivered (603.8000) | LF | 10,260 | $13.78 | $18.00 |
| 22 | Concrete barrier temporary precast installed (603.8125) | LF | 10,260 | $3.18 | $11.25 |
| 23 | Maintenance and repair of haul roads (project) 01. 8680-00-74 (618.0100) | EACH | 1 | $0.02 | $1.00 |
| 24 | Mobilization (619.1000) | EACH | 1 | $2,180,817 | $783,688 |
| 25 | Field office type B (642.5001) | EACH | 1 | $6,000.00 | $30,500 |
| 26 | Traffic control drums (643.0300) | DAY | 28,664 | $0.20 | $0.22 |
| 27 | Traffic control barricades type III (643.0420) | DAY | 2,214 | $1.50 | $1.65 |
| 28 | Traffic control warning lights type A (643.0705) | DAY | 4,043 | $0.40 | $0.45 |
| 29 | Traffic control warning lights type C (643.0715) | DAY | 6,380 | $0.50 | $0.55 |
| 30 | Traffic control arrow boards (643.0800) | DAY | 4 | $25.00 | $27.00 |
| 31 | Connected arrow board (643.0810.S) | DAY | 220 | $45.00 | $49.00 |
| 32 | Traffic control signs (643.0900) | DAY | 7,702 | $1.00 | $1.10 |
| 33 | Traffic control covering signs type I (643.0910) | EACH | 3 | $125.00 | $135.00 |
| 34 | Traffic control covering signs type II (643.0920) | EACH | 3 | $125.00 | $135.00 |
| 35 | Traffic control signs fixed message (643.1000) | SF | 219 | $25.00 | $27.00 |
| 36 | Traffic control signs PCMS (643.1050) | DAY | 21 | $50.00 | $54.00 |
| 37 | Traffic control cones 42-inch (643.1070) | DAY | 19,680 | $0.35 | $0.40 |
| 38 | Connected work zone start and end location markers (643.1220.S) | DAY | 220 | $45.00 | $49.00 |
| 39 | Temporary marking line removable tape 6-inch (643.3180) | LF | 22,320 | $2.10 | $2.25 |
| 40 | Temporary marking line removable tape 10-inch (643.3280) | LF | 710 | $3.60 | $3.90 |
| 41 | Traffic control (643.5000) | EACH | 1 | $42,000 | $55,000 |
| 42 | Marking line epoxy 6-inch (646.2020) | LF | 361 | $0.75 | $0.80 |
| 43 | Marking line grooved black epoxy 6-inch (646.2025) | LF | 6,120 | $1.10 | $1.15 |
| 44 | Marking line grooved wet ref epoxy 6-inch (646.2040) | LF | 71,101 | $1.30 | $1.35 |
| 45 | Marking line epoxy 10-inch (646.4020) | LF | 1,043 | $1.28 | $1.35 |
| 46 | Marking line grooved wet ref epoxy 10-inch (646.4040) | LF | 4,893 | $2.65 | $2.75 |
| 47 | Marking arrow epoxy (646.5020) | EACH | 13 | $275.00 | $290.00 |
| 48 | Marking word epoxy (646.5120) | EACH | 4 | $340.00 | $350.00 |
| 49 | Marking dotted extension epoxy 18-inch (646.6320) | LF | 109 | $17.00 | $17.75 |
| 50 | Marking chevron epoxy 12-inch (646.7320) | LF | 57 | $19.00 | $19.80 |
| 51 | Marking crosswalk epoxy transverse line 6-inch (646.7420) | LF | 108 | $13.00 | $13.50 |
| 52 | Marking removal line water blasting 4-inch (646.9010) | LF | 9,980 | $0.15 | $0.90 |
| 53 | Marking removal line water blasting 8-inch (646.9110) | LF | 1,220 | $0.30 | $1.75 |
| 54 | Construction staking supplemental control (project) 01. 8680-00-74 (650.9911) | EACH | 1 | $15,000 | $13,500 |
| 55 | Conduit rigid nonmetallic schedule 40 2-inch (652.0225) | LF | 3,010 | $15.36 | $16.00 |
| 56 | Conduit rigid nonmetallic schedule 80 1-inch (652.0310) | LF | 38 | $9.00 | $9.40 |
| 57 | Conduit rigid nonmetallic schedule 80 1 1/2-inch (652.0320) | LF | 6 | $15.00 | $15.50 |
| 58 | Conduit rigid nonmetallic schedule 80 2-inch (652.0325) | LF | 547 | $9.55 | $10.00 |
| 59 | Install conduit into existing item (652.0700.S) | EACH | 1 | $1,253.00 | $1,300.00 |
| 60 | Electrical wire lighting 12 AWG (655.0610) | LF | 15,840 | $1.00 | $1.05 |
| 61 | Electrical wire lighting 4 AWG (655.0630) | LF | 48,814 | $2.87 | $3.00 |
| 62 | Transformer bases breakaway 11 1/2-inch bolt circle (657.0255) | EACH | 18 | $1,194.00 | $1,250.00 |
| 63 | Poles type 5-aluminum (657.0322) | EACH | 18 | $2,054.00 | $2,150.00 |
| 64 | Luminaire arms single member 4 1/2-inch clamp 6-FT (657.0610) | EACH | 36 | $533.00 | $555.00 |
| 65 | Luminaires utility LED B (659.1120) | EACH | 77 | $324.00 | $340.00 |
| 66 | Lamp, ballast, LED, switch disposal by contractor (659.5000.S) | EACH | 130 | $52.00 | $54.00 |
| 67 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 990 | $5.00 | $5.00 |
| 68 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 1,500 | $5.00 | $5.00 |
| 69 | Special 01. mndot lighting unit type 1 (SPV.0060) | EACH | 24 | $8,130.00 | $8,500.00 |
| 70 | Special 02. mndot lighting unit type 2 (SPV.0060) | EACH | 5 | $4,779.00 | $5,000.00 |
| 71 | Special 03. concrete bases type 5 - tall (SPV.0060) | EACH | 18 | $3,034.00 | $4,500.00 |
| 72 | Special 05. marking arrows grooved preformed thermoplastic (SPV.0060) | EACH | 2 | $525.00 | $550.00 |
| 73 | Special 06. marking words grooved preformed thermoplastic (SPV.0060) | EACH | 2 | $795.00 | $825.00 |
| 74 | Special 09. junction boxes 8X8X6- inch (SPV.0060) | EACH | 2 | $4,735.00 | $5,000.00 |
| 75 | Special 10. RE-caulk tie girder casting (SPV.0060) | EACH | 22 | $300.00 | $500.00 |
| 76 | Special 11. remove and replace sidewalk cover plate (SPV.0060) | EACH | 1 | $30,000 | $9,500.00 |
| 77 | Special 12. painting pier piles (SPV.0060) | EACH | 1 | $30,000 | $43,500 |
| 78 | Special 02. strip seal gland replacement (SPV.0090) | LF | 166 | $425.00 | $90.00 |
| 79 | Special 05. conduit clean out (SPV.0090) | LF | 7,785 | $3.81 | $4.00 |
| 80 | Special 01. methacrylate flood seal (bridge) (SPV.0180) | SY | 66,770 | $11.50 | $12.50 |
| 81 | Special 02. methacrylate flood seal (ramps) (SPV.0180) | SY | 11,740 | $11.50 | $12.75 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of May 13, 2025. Compiled by Mirage Metrics.