WisDOT contract 20250513041 bid tabulation
STH 64 - Ridgeland; Flayton Creek Bridge B-17-0237 (CTH V, Dunn County STH 64 - Ridgeland). Let by Wisconsin DOT on May 13, 2025, Dunn. 3 bids received; low bid $495,530 by Larson Construction Co., Inc..
- Owner
- Wisconsin DOT
- Letting
- 13 MAY 2025
- Pay items
- 66
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Larson Construction Co., Inc. | $495,530 | Low |
| 2 | Lunda Construction Company | $567,466 | +15% |
| 3 | Radtke Contractors Inc. | $577,519 | +17% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Larson Construction Co., Inc. | 2. Lunda Construction Company | 3. Radtke Contractors Inc. |
|---|---|---|---|---|---|---|
| 1 | Clearing (201.0105) | STA | 3 | $1.00 | $1.00 | $1.00 |
| 2 | Grubbing (201.0205) | STA | 3 | $1.00 | $1.00 | $1.00 |
| 3 | Removing structure over waterway minimal debris (structure) 01. P-17- 0925 (203.0260) | EACH | 1 | $31,400 | $100,000 | $51,642 |
| 4 | Removing asphaltic surface butt joints (204.0115) | SY | 50 | $16.20 | $16.20 | $16.20 |
| 5 | Removing asphaltic surface milling (204.0120) | SY | 140 | $16.20 | $16.20 | $16.20 |
| 6 | Excavation common (205.0100) | CY | 495 | $16.85 | $16.85 | $16.85 |
| 7 | Excavation, hauling, and disposal of potential creosote contaminated soil (205.0508.S) | TON | 104 | $165.00 | $150.00 | $110.07 |
| 8 | Excavation for structures bridges (structure) 01. B-17-0237 (206.1001) | EACH | 1 | $26,400 | $35,000 | $55,775 |
| 9 | Backfill structure type A (210.1500) | TON | 396 | $37.30 | $37.30 | $43.85 |
| 10 | Finishing roadway (project) 01. 8932-03-70 (213.0100) | EACH | 1 | $500.00 | $500.00 | $500.00 |
| 11 | Base aggregate dense 3/4-inch (305.0110) | TON | 80 | $33.65 | $33.65 | $33.65 |
| 12 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 490 | $25.35 | $25.35 | $25.35 |
| 13 | Tack coat (455.0605) | GAL | 55 | $9.75 | $9.75 | $9.75 |
| 14 | Asphaltic surface (465.0105) | TON | 190 | $142.15 | $142.15 | $142.15 |
| 15 | Concrete masonry bridges (502.0100) | CY | 137 | $842.00 | $800.00 | $797.01 |
| 16 | Protective surface treatment (502.3200) | SY | 147 | $4.00 | $3.00 | $4.78 |
| 17 | Pigmented surface sealer (502.3210) | SY | 27 | $8.00 | $5.00 | $38.44 |
| 18 | Bar steel reinforcement HS structures (505.0400) | LB | 4,840 | $1.75 | $1.33 | $1.37 |
| 19 | Bar steel reinforcement HS coated structures (505.0600) | LB | 20,510 | $1.75 | $1.37 | $1.37 |
| 20 | Rubberized membrane waterproofing (516.0500) | SY | 12 | $60.00 | $25.00 | $74.42 |
| 21 | Piling steel HP 10-inch X 42 LB (550.1100) | LF | 800 | $50.00 | $40.00 | $27.71 |
| 22 | Riprap heavy (606.0300) | CY | 110 | $72.00 | $80.00 | $94.22 |
| 23 | Pipe underdrain wrapped 6-inch (612.0406) | LF | 150 | $7.00 | $7.00 | $4.47 |
| 24 | Anchor assemblies for steel plate beam guard (614.0150) | EACH | 4 | $275.00 | $250.00 | $236.20 |
| 25 | MGS thrie beam transition (614.2500) | LF | 160 | $89.00 | $89.00 | $89.00 |
| 26 | MGS guardrail terminal eat (614.2610) | EACH | 4 | $3,600.00 | $3,600.00 | $3,600.00 |
| 27 | Maintenance and repair of haul roads (project) 01. 8932-03-70 (618.0100) | EACH | 1 | $1,000.00 | $0.01 | $500.00 |
| 28 | Mobilization (619.1000) | EACH | 1 | $74,300 | $93,312 | $131,326 |
| 29 | Water (624.0100) | MGAL | 22 | $1.00 | $1.00 | $1.00 |
| 30 | Topsoil (625.0100) | SY | 850 | $3.60 | $3.60 | $3.60 |
| 31 | Mulching (627.0200) | SY | 920 | $0.65 | $0.65 | $0.65 |
| 32 | Silt fence (628.1504) | LF | 945 | $0.01 | $0.01 | $0.01 |
| 33 | Silt fence maintenance (628.1520) | LF | 1,890 | $0.01 | $0.01 | $0.01 |
| 34 | Mobilizations erosion control (628.1905) | EACH | 4 | $1.00 | $1.00 | $1.00 |
| 35 | Mobilizations emergency erosion control (628.1910) | EACH | 4 | $1.00 | $1.00 | $1.00 |
| 36 | Erosion mat class II type C (628.2027) | SY | 300 | $5.00 | $5.00 | $5.00 |
| 37 | Turbidity barriers (628.6005) | SY | 125 | $55.00 | $55.00 | $55.00 |
| 38 | Temporary ditch checks (628.7504) | LF | 50 | $8.00 | $8.00 | $8.00 |
| 39 | Fertilizer type B (629.0210) | CWT | 0.90 | $560.00 | $560.00 | $560.00 |
| 40 | Seeding mixture no. 20 (630.0120) | LB | 56 | $21.00 | $21.00 | $21.00 |
| 41 | Seeding temporary (630.0200) | LB | 33 | $7.25 | $7.25 | $7.25 |
| 42 | Seed water (630.0500) | MGAL | 28 | $0.01 | $0.01 | $0.01 |
| 43 | Posts wood 4X6-inch X 14-FT (634.0614) | EACH | 4 | $130.00 | $130.00 | $130.00 |
| 44 | Signs type II reflective F (637.2230) | SF | 12 | $29.90 | $29.90 | $22.90 |
| 45 | Moving signs type II (638.2102) | EACH | 2 | $72.00 | $72.00 | $72.00 |
| 46 | Removing signs type II (638.2602) | EACH | 4 | $15.00 | $15.00 | $15.00 |
| 47 | Removing small sign supports (638.3000) | EACH | 4 | $15.00 | $15.00 | $15.00 |
| 48 | Moving small sign supports (638.4000) | EACH | 2 | $72.00 | $72.00 | $72.00 |
| 49 | Field office type B (642.5001) | EACH | 1 | $3,000.00 | $3,000.00 | $12,730 |
| 50 | Traffic control barricades type III (643.0420) | DAY | 1,728 | $0.40 | $0.40 | $0.40 |
| 51 | Traffic control warning lights type A (643.0705) | DAY | 2,304 | $0.10 | $0.10 | $0.10 |
| 52 | Traffic control signs (643.0900) | DAY | 1,152 | $0.40 | $0.40 | $0.40 |
| 53 | Traffic control (643.5000) | EACH | 1 | $2,600.00 | $2,600.00 | $2,600.00 |
| 54 | Geotextile type DF schedule A (645.0111) | SY | 96 | $5.00 | $5.00 | $5.05 |
| 55 | Geotextile type HR (645.0120) | SY | 240 | $3.50 | $5.00 | $5.26 |
| 56 | Marking line epoxy 4-inch (646.1020) | LF | 365 | $11.00 | $12.85 | $11.00 |
| 57 | Construction staking subgrade (650.4500) | LF | 300 | $0.01 | $0.01 | $0.01 |
| 58 | Construction staking base (650.5000) | LF | 300 | $0.01 | $0.01 | $0.01 |
| 59 | Construction staking structure layout (structure) 01. B-17-0237 (650.6501) | EACH | 1 | $3,000.00 | $3,000.00 | $3,000.00 |
| 60 | Construction staking supplemental control (project) 01. 8932-03-70 (650.9911) | EACH | 1 | $400.00 | $1,300.00 | $400.00 |
| 61 | Construction staking slope stakes (650.9920) | LF | 300 | $0.01 | $1.00 | $0.01 |
| 62 | Sawing asphalt (690.0150) | LF | 44 | $5.00 | $5.00 | $5.00 |
| 63 | Incentive strength concrete structures (715.0502) | DOL | 822 | $1.00 | $1.00 | $1.00 |
| 64 | Maintaining bird deterrent system (station) 01. 10+00 (999.2005.S) | EACH | 1 | $500.00 | $0.01 | $0.01 |
| 65 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 300 | $5.00 | $5.00 | $5.00 |
| 66 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 300 | $5.00 | $5.00 | $5.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of May 13, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.