WisDOT contract 20250610001 bid tabulation
1200-02-63. Let by Wisconsin DOT on June 10, 2025, Grant. 3 bids received; low bid $14,277,961 by Michels Road & Stone, Inc..
- Owner
- Wisconsin DOT
- Letting
- 10 JUN 2025
- Pay items
- 179
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Michels Road & Stone, Inc. | $14,277,961 | Low |
| 2 | Zignego Company, Inc. | $14,410,656 | +1.0% |
| 3 | Iverson Construction, A Div. of Mathy Co | $14,421,749 | +1.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Michels Road & Stone, Inc. | 2. Zignego Company, Inc. | 3. Iverson Construction, A Div. of Mathy Co |
|---|---|---|---|---|---|---|
| 1 | Grubbing (201.0205) | STA | 3 | $2,650.00 | $2,650.00 | $2,650.00 |
| 2 | Removing small pipe culverts (203.0100) | EACH | 5 | $400.00 | $500.00 | $400.00 |
| 3 | Removing concrete pavement (204.0100) | SY | 28,278 | $10.00 | $11.50 | $10.00 |
| 4 | Removing concrete pavement butt joints (204.0105) | SY | 4,793 | $20.55 | $20.55 | $20.55 |
| 5 | Removing asphaltic surface (204.0110) | SY | 508 | $22.00 | $11.50 | $22.00 |
| 6 | Removing asphaltic surface butt joints (204.0115) | SY | 3,144 | $17.70 | $17.70 | $17.70 |
| 7 | Removing asphaltic surface milling (204.0120) | SY | 85,544 | $5.40 | $5.40 | $5.40 |
| 8 | Removing curb & gutter (204.0150) | LF | 855 | $10.00 | $8.00 | $10.00 |
| 9 | Removing concrete sidewalk (204.0155) | SY | 212 | $10.00 | $10.00 | $10.00 |
| 10 | Removing concrete barrier (204.0157) | LF | 1,257 | $15.00 | $30.00 | $15.00 |
| 11 | Removing guardrail (204.0165) | LF | 12,836 | $2.50 | $2.50 | $2.50 |
| 12 | Removing surface drains (204.0190) | EACH | 13 | $250.00 | $500.00 | $250.00 |
| 13 | Excavation common (205.0100) | CY | 4,359 | $17.00 | $30.00 | $17.00 |
| 14 | Prepare foundation for asphaltic paving (project) 01. 1202-00-75 (211.0101) | EACH | 1 | $27,960 | $27,960 | $27,960 |
| 15 | Prepare foundation for asphaltic shoulders (211.0400) | STA | 180 | $150.00 | $174.00 | $174.00 |
| 16 | Finishing roadway (project) 01. 1202-00-75 (213.0100) | EACH | 1 | $5,000.00 | $1,000.00 | $1,742.82 |
| 17 | Base aggregate dense 3/4-inch (305.0110) | TON | 14,519 | $26.00 | $20.00 | $27.40 |
| 18 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 6,616 | $19.00 | $15.00 | $19.00 |
| 19 | Removing pavement for base patching (390.0100) | CY | 980 | $102.00 | $55.00 | $102.00 |
| 20 | Base patching concrete hes (390.0305) | CY | 980 | $265.00 | $283.00 | $265.00 |
| 21 | Coloring concrete wisdot red (405.0100) | CY | 14 | $105.00 | $100.00 | $105.00 |
| 22 | Concrete pavement 8-inch (415.0080) | SY | 23,784 | $57.00 | $65.00 | $57.00 |
| 23 | Concrete pavement 9-inch (415.0090) | SY | 4,172 | $60.00 | $67.00 | $60.00 |
| 24 | Concrete pavement 10-inch (415.0100) | SY | 230 | $113.00 | $100.00 | $113.00 |
| 25 | Concrete pavement 11-inch (415.0110) | SY | 123 | $113.00 | $120.00 | $11.00 |
| 26 | Concrete pavement approach slab (415.0410) | SY | 552 | $250.00 | $250.00 | $250.00 |
| 27 | Concrete truck apron 12-inch (415.2010) | SY | 40 | $110.00 | $100.00 | $110.00 |
| 28 | Rout and seal (415.6000.S) | LF | 106,943 | $0.89 | $0.98 | $0.93 |
| 29 | Drilled tie bars (416.0610) | EACH | 5,431 | $7.00 | $30.00 | $7.00 |
| 30 | Drilled dowel bars (416.0620) | EACH | 7,741 | $20.00 | $30.00 | $20.00 |
| 31 | Concrete pavement repair (416.1710) | SY | 5,897 | $94.00 | $94.00 | $64.00 |
| 32 | Concrete pavement replacement (416.1720) | SY | 1,077 | $95.00 | $94.00 | $95.00 |
| 33 | Tack coat (455.0605) | GAL | 17,075 | $3.15 | $3.15 | $3.15 |
| 34 | HMA percent within limits (PWL) test strip volumetrics (460.0105.S) | EACH | 2 | $2,220.00 | $2,220.00 | $2,220.00 |
| 35 | HMA percent within limits (PWL) test strip density (460.0110.S) | EACH | 1 | $2,600.00 | $2,600.00 | $2,600.00 |
| 36 | HMA pavement test strip volumetrics (460.0115.S) | EACH | 1 | $2,220.00 | $2,220.00 | $2,220.00 |
| 37 | HMA pavement test strip density (460.0120.S) | EACH | 1 | $2,600.00 | $2,600.00 | $2,600.00 |
| 38 | Incentive density HMA pavement (460.2000) | DOL | 16,461 | $1.00 | $1.00 | $1.00 |
| 39 | Incentive density PWL HMA pavement (460.2005) | DOL | 10,143 | $1.00 | $1.00 | $1.00 |
| 40 | Incentive density HMA pavement longitudinal joints (460.2007) | DOL | 19,030 | $1.00 | $1.00 | $1.00 |
| 41 | Incentive air voids HMA pavement (460.2010) | DOL | 12,663 | $1.00 | $1.00 | $1.00 |
| 42 | HMA pavement 4 LT 58-28 S (460.5224) | TON | 1,274 | $89.55 | $89.55 | $89.55 |
| 43 | HMA pavement 4 MT 58-28 S (460.6224) | TON | 22,876 | $91.24 | $91.24 | $91.24 |
| 44 | HMA pavement 4 HT 58-28 H (460.7424) | TON | 15,422 | $101.54 | $101.54 | $101.54 |
| 45 | HMA pavement 4 SMA 58-28 V (460.8624) | TON | 12,447 | $121.40 | $121.40 | $121.40 |
| 46 | Material transfer vehicle (460.9000.S) | EACH | 1 | $50,000 | $50,000 | $50,000 |
| 47 | Asphaltic surface (465.0105) | TON | 10 | $250.00 | $250.00 | $250.00 |
| 48 | Asphaltic surface driveways and field entrances (465.0120) | TON | 4 | $250.00 | $250.00 | $250.00 |
| 49 | Asphaltic surface temporary (465.0125) | TON | 64 | $130.00 | $130.00 | $130.00 |
| 50 | Asphaltic curb (465.0310) | LF | 88 | $35.00 | $35.00 | $35.00 |
| 51 | Asphaltic flumes (465.0315) | SY | 453 | $75.00 | $75.00 | $75.00 |
| 52 | Asphaltic rumble strips, shoulder divided roadway (465.0510) | LF | 143,844 | $0.12 | $0.12 | $0.12 |
| 53 | Compression joint sealer preformed elastomeric (width) 01. 4-inch (502.2000) | LF | 45 | $225.00 | $225.00 | $225.00 |
| 54 | Structure overcoating cleaning and priming (structure) 01. B-22-61 (517.3001.S) | EACH | 1 | $119,860 | $119,860 | $119,860 |
| 55 | Containment and collection of waste materials (structure) 01. B- 22-61 (517.4001.S) | EACH | 1 | $23,970 | $23,972 | $23,972 |
| 56 | Portable decontamination facility (517.6001.S) | EACH | 1 | $2,000.00 | $2,000.00 | $2,000.00 |
| 57 | Apron endwalls for culvert pipe steel 12-inch (521.1012) | EACH | 2 | $850.00 | $2,000.00 | $850.00 |
| 58 | Apron endwalls for culvert pipe steel 18-inch (521.1018) | EACH | 1 | $780.00 | $2,000.00 | $780.00 |
| 59 | Culvert pipe corrugated steel 18- inch (521.3118) | LF | 12 | $215.00 | $100.00 | $215.00 |
| 60 | Culvert pipe reinforced concrete class III 18-inch (522.0118) | LF | 92 | $177.00 | $100.00 | $117.00 |
| 61 | Apron endwalls for culvert pipe reinforced concrete 18-inch (522.1018) | EACH | 1 | $1,475.00 | $2,000.00 | $1,475.00 |
| 62 | Culvert pipe corrugated polyethylene 12-inch (530.0112) | LF | 142 | $57.00 | $100.00 | $57.00 |
| 63 | Concrete curb type G (601.0115) | LF | 80 | $44.00 | $40.00 | $44.00 |
| 64 | Concrete curb type J (601.0120) | LF | 15 | $45.00 | $40.00 | $45.00 |
| 65 | Concrete curb & gutter 30-inch type A (601.0409) | LF | 10 | $45.00 | $40.00 | $45.00 |
| 66 | Concrete curb & gutter 30-inch type D (601.0411) | LF | 147 | $45.00 | $40.00 | $45.00 |
| 67 | Concrete curb & gutter 6-inch sloped 30-inch type G (601.0413) | LF | 316 | $52.00 | $40.00 | $52.00 |
| 68 | Concrete curb & gutter 4-inch sloped 36-inch type T (601.0582) | LF | 245 | $52.00 | $40.00 | $52.00 |
| 69 | Concrete curb pedestrian (601.0600) | LF | 72 | $58.00 | $70.00 | $58.00 |
| 70 | Concrete sidewalk 5-inch (602.0410) | SF | 1,530 | $11.00 | $10.00 | $11.00 |
| 71 | Curb ramp detectable warning field yellow (602.0505) | SF | 96 | $40.00 | $60.00 | $40.00 |
| 72 | Concrete surface drains (602.3010) | CY | 81.70 | $1,800.00 | $1.00 | $1,800.00 |
| 73 | Concrete barrier type S42 (603.1142) | LF | 1,232 | $158.00 | $222.00 | $158.00 |
| 74 | Concrete barrier transition type NJ32DF to S36 (603.3313) | EACH | 1 | $19,000 | $15,000 | $19,000 |
| 75 | Concrete barrier transition type S36 to S42 (603.3535) | EACH | 1 | $19,000 | $15,000 | $19,000 |
| 76 | Concrete barrier temporary precast delivered (603.8000) | LF | 863 | $40.00 | $19.00 | $40.00 |
| 77 | Concrete barrier temporary precast installed (603.8125) | LF | 1,688 | $4.00 | $7.00 | $4.00 |
| 78 | Riprap medium (606.0200) | CY | 15 | $250.00 | $300.00 | $250.00 |
| 79 | Inlet covers type BW (611.0610) | EACH | 10 | $1,250.00 | $1,000.00 | $1,250.00 |
| 80 | Inlet covers type S (611.0651) | EACH | 2 | $1,240.00 | $1,000.00 | $1,240.00 |
| 81 | Inlet covers type V (611.0654) | EACH | 3 | $1,200.00 | $1,000.00 | $1,200.00 |
| 82 | Inlets 2X2-FT (611.3220) | EACH | 2 | $4,500.00 | $7,000.00 | $4,500.00 |
| 83 | Inlets 2X2.5-FT (611.3225) | EACH | 1 | $4,500.00 | $7,000.00 | $4,500.00 |
| 84 | Adjusting inlet covers (611.8115) | EACH | 5 | $600.00 | $1,000.00 | $600.00 |
| 85 | Salvaged inlet covers (611.9710) | EACH | 7 | $715.00 | $1,000.00 | $14.00 |
| 86 | Steel thrie beam structure approach (614.0200) | LF | 82.40 | $90.00 | $90.00 | $90.00 |
| 87 | Steel thrie beam bullnose terminal (614.0220) | EACH | 4 | $15,000 | $15,000 | $15,000 |
| 88 | Steel thrie beam (614.0230) | LF | 325 | $40.00 | $40.00 | $40.00 |
| 89 | Steel plate beam guard class A (614.0305) | LF | 1,550 | $25.00 | $25.00 | $25.00 |
| 90 | Steel plate beam guard short radius (614.0345) | LF | 68.75 | $38.00 | $38.00 | $38.00 |
| 91 | Steel plate beam guard energy absorbing terminal (614.0370) | EACH | 5 | $4,000.00 | $4,000.00 | $4,000.00 |
| 92 | Steel plate beam guard short radius terminal (614.0390) | EACH | 1 | $2,500.00 | $2,500.00 | $2,500.00 |
| 93 | Crash cushions permanent (614.0800) | EACH | 1 | $34,500 | $34,500 | $60,000 |
| 94 | MGS guardrail 3 (614.2300) | LF | 9,112.50 | $25.00 | $25.00 | $25.00 |
| 95 | MGS thrie beam transition (614.2500) | LF | 433.40 | $88.00 | $88.00 | $88.00 |
| 96 | MGS guardrail terminal eat (614.2610) | EACH | 14 | $3,750.00 | $3,750.00 | $3,750.00 |
| 97 | MGS guardrail terminal type 2 (614.2620) | EACH | 11 | $2,500.00 | $2,500.00 | $2,500.00 |
| 98 | Fence safety (616.0700.S) | LF | 300 | $4.50 | $4.50 | $4.50 |
| 99 | Maintenance and repair of haul roads (project) 01. 1202-00-75 (618.0100) | EACH | 1 | $1.00 | $1.00 | $1,120.82 |
| 100 | Mobilization (619.1000) | EACH | 1 | $1,297,914 | $1,135,600 | $1,559,500 |
| 101 | Concrete corrugated median (620.0100) | SF | 417 | $14.00 | $16.00 | $217.59 |
| 102 | Concrete median sloped nose (620.0300) | SF | 145 | $18.00 | $14.00 | $18.00 |
| 103 | Water (624.0100) | MGAL | 323 | $50.00 | $50.00 | $20.00 |
| 104 | Salvaged topsoil (625.0500) | SY | 11,815 | $7.00 | $1.00 | $7.00 |
| 105 | Silt fence (628.1504) | LF | 12,503 | $2.00 | $2.00 | $2.00 |
| 106 | Silt fence maintenance (628.1520) | LF | 12,503 | $0.01 | $0.01 | $0.01 |
| 107 | Mobilizations erosion control (628.1905) | EACH | 5 | $100.00 | $100.00 | $100.00 |
| 108 | Mobilizations emergency erosion control (628.1910) | EACH | 5 | $100.00 | $100.00 | $100.00 |
| 109 | Erosion mat class I type A (628.2002) | SY | 11,528 | $1.25 | $1.25 | $1.25 |
| 110 | Erosion mat urban class I type A (628.2006) | SY | 287 | $2.45 | $2.45 | $2.45 |
| 111 | Inlet protection type A (628.7005) | EACH | 3 | $150.00 | $150.00 | $150.00 |
| 112 | Inlet protection type B (628.7010) | EACH | 14 | $50.00 | $50.00 | $50.00 |
| 113 | Inlet protection type C (628.7015) | EACH | 12 | $55.00 | $55.00 | $55.00 |
| 114 | Temporary ditch checks (628.7504) | LF | 480 | $9.00 | $9.00 | $9.00 |
| 115 | Culvert pipe checks (628.7555) | EACH | 13 | $17.00 | $17.00 | $17.00 |
| 116 | Rock bags (628.7570) | EACH | 477 | $17.00 | $17.00 | $17.00 |
| 117 | Fertilizer type B (629.0210) | CWT | 17.40 | $85.00 | $85.00 | $85.00 |
| 118 | Seeding mixture no. 30 (630.0130) | LB | 900.10 | $8.15 | $8.15 | $8.15 |
| 119 | Seeding mixture no. 40 (630.0140) | LB | 30.10 | $15.00 | $15.00 | $15.00 |
| 120 | Seeding temporary (630.0200) | LB | 560.20 | $3.75 | $3.75 | $3.75 |
| 121 | Seed water (630.0500) | MGAL | 1,326.80 | $10.00 | $10.00 | $10.00 |
| 122 | Delineators barrier wall (633.1000) | EACH | 12 | $49.00 | $49.00 | $49.00 |
| 123 | Markers culvert end (633.5200) | EACH | 4 | $69.00 | $69.00 | $69.00 |
| 124 | Field office type B (642.5001) | EACH | 1 | $35,000 | $20,000 | $27,454 |
| 125 | Traffic control drums (643.0300) | DAY | 88,755 | $0.20 | $0.20 | $0.20 |
| 126 | Digital speed reduction system (DSRS) (643.0370.S) | DAY | 356 | $60.00 | $60.00 | $60.00 |
| 127 | Traffic control barricades type III (643.0420) | DAY | 5,077 | $1.00 | $1.00 | $1.00 |
| 128 | Traffic control flexible tubular marker posts (643.0500) | EACH | 154 | $30.00 | $30.00 | $30.00 |
| 129 | Traffic control flexible tubular marker bases (643.0600) | EACH | 154 | $10.00 | $10.00 | $10.00 |
| 130 | Traffic control warning lights type A (643.0705) | DAY | 10,216 | $0.20 | $0.20 | $0.20 |
| 131 | Traffic control warning lights type C (643.0715) | DAY | 24,465 | $0.25 | $0.25 | $0.25 |
| 132 | Traffic control arrow boards (643.0800) | DAY | 263 | $20.00 | $20.00 | $20.00 |
| 133 | Traffic control signs (643.0900) | DAY | 26,639 | $0.50 | $0.50 | $0.50 |
| 134 | Traffic control covering signs type I (643.0910) | EACH | 5 | $250.00 | $250.00 | $250.00 |
| 135 | Traffic control covering signs type II (643.0920) | EACH | 54 | $200.00 | $200.00 | $200.00 |
| 136 | Traffic control signs PCMS (643.1050) | DAY | 135 | $40.00 | $40.00 | $40.00 |
| 137 | Temporary marking line paint 6- inch (643.3165) | LF | 34,772 | $0.60 | $0.60 | $0.60 |
| 138 | Temporary marking arrow paint (643.3505) | EACH | 16 | $100.00 | $100.00 | $100.00 |
| 139 | Temporary marking stop line paint 18-inch (643.3805) | LF | 39 | $4.00 | $4.00 | $4.00 |
| 140 | Traffic control (643.5000) | EACH | 1 | $65,000 | $65,000 | $65,000 |
| 141 | Geotextile type HR (645.0120) | SY | 65.50 | $10.00 | $10.00 | $10.00 |
| 142 | Marking line epoxy 6-inch (646.2020) | LF | 15,385 | $0.90 | $0.90 | $0.70 |
| 143 | Marking line grooved black epoxy 6-inch (646.2025) | LF | 21,383 | $0.69 | $0.69 | $0.95 |
| 144 | Marking line grooved wet ref epoxy 6-inch (646.2040) | LF | 210,780 | $1.35 | $1.35 | $1.45 |
| 145 | Marking line epoxy 10-inch (646.4020) | LF | 1,133 | $1.50 | $1.50 | $1.25 |
| 146 | Marking line grooved wet ref epoxy 10-inch (646.4040) | LF | 15,868 | $2.25 | $2.25 | $2.70 |
| 147 | Marking arrow epoxy (646.5020) | EACH | 44 | $200.00 | $200.00 | $340.00 |
| 148 | Marking word epoxy (646.5120) | EACH | 6 | $350.00 | $350.00 | $345.00 |
| 149 | Marking symbol epoxy (646.5220) | EACH | 2 | $350.00 | $350.00 | $330.00 |
| 150 | Marking stop line epoxy 18-inch (646.6120) | LF | 386 | $14.00 | $14.00 | $25.00 |
| 151 | Marking diagonal epoxy 12-inch (646.7120) | LF | 100 | $11.00 | $11.00 | $20.00 |
| 152 | Marking crosswalk epoxy transverse line 6-inch (646.7420) | LF | 72 | $10.50 | $10.50 | $25.00 |
| 153 | Marking crosswalk epoxy block style 24-inch (646.7520) | LF | 48 | $17.00 | $17.00 | $45.00 |
| 154 | Marking parking stall epoxy (646.8320) | LF | 2,537 | $3.50 | $3.50 | $5.00 |
| 155 | Marking removal line 4-inch (646.9000) | LF | 62 | $0.60 | $0.60 | $0.60 |
| 156 | Marking removal line 6-inch (646.9002) | LF | 5,224 | $0.90 | $0.90 | $0.90 |
| 157 | Marking removal line wide (646.9200) | LF | 13 | $3.00 | $3.00 | $3.00 |
| 158 | Construction staking base (650.5000) | LF | 504 | $4.00 | $0.01 | $1.00 |
| 159 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 512 | $4.00 | $5.00 | $3.00 |
| 160 | Construction staking pipe culverts (650.6000) | EACH | 4 | $250.00 | $500.00 | $100.00 |
| 161 | Construction staking concrete pavement (650.7000) | LF | 14,099 | $0.25 | $5.00 | $1.00 |
| 162 | Construction staking concrete barrier (650.7500) | LF | 1,257 | $2.50 | $5.00 | $3.00 |
| 163 | Construction staking resurfacing reference (650.8000) | LF | 118,068 | $0.50 | $0.60 | $0.25 |
| 164 | Construction staking curb ramps (650.9000) | EACH | 8 | $250.00 | $1,000.00 | $250.00 |
| 165 | Construction staking supplemental control (project) 01. 1202-00-75 (650.9911) | EACH | 1 | $15,000 | $1.00 | $1.00 |
| 166 | Construction staking supplemental control (project) 02. 1200-02-63 (650.9911) | EACH | 1 | $2,500.00 | $1.00 | $1.00 |
| 167 | Temporary traffic signals for bridges (structure) 01. 53+00V (661.0101) | EACH | 1 | $6,000.00 | $6,000.00 | $6,000.00 |
| 168 | Sawing concrete (690.0250) | LF | 71,631 | $2.35 | $2.35 | $1.69 |
| 169 | Incentive strength concrete barrier (715.0603) | DOL | 615 | $1.00 | $1.00 | $1.00 |
| 170 | Incentive compressive strength concrete pavement (715.0720) | DOL | 8,125 | $1.00 | $1.00 | $1.00 |
| 171 | Incentive iri ride (740.0440) | DOL | 27,808 | $1.00 | $1.00 | $1.00 |
| 172 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 2,100 | $5.00 | $5.00 | $5.00 |
| 173 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 6,480 | $5.00 | $5.00 | $5.00 |
| 174 | Special 01. cleaning and painting bearings (SPV.0060) | EACH | 15 | $750.00 | $750.00 | $750.00 |
| 175 | Special 02. bearing maintenance (SPV.0060) | EACH | 6 | $5,000.00 | $5,000.00 | $5,000.00 |
| 176 | Special 03. locate and clean 6-inch PVC outfall (SPV.0060) | EACH | 1 | $7,500.00 | $3,000.00 | $7,500.00 |
| 177 | Special 01. remove, salvage and reinstall landscaping rocks (SPV.0165) | SF | 40 | $20.00 | $20.00 | $20.00 |
| 178 | Special 01. scale approach pavement reinforcement (SPV.0180) | SY | 123 | $100.00 | $100.00 | $100.00 |
| 179 | Special 02. reprocess and relay (SPV.0180) | SY | 41,961 | $7.30 | $7.30 | $7.30 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of June 10, 2025. Compiled by Mirage Metrics.