WisDOT contract 20250909022 bid tabulation
Rhinelander - Monico; STH 47 to STH 17 North (USH 008, Oneida County Rhinelander - Monico). Let by Wisconsin DOT on September 9, 2025, Oneida. 3 bids received; low bid $6,156,658 by Musson Bros., Inc..
- Owner
- Wisconsin DOT
- Letting
- 09 SEP 2025
- Pay items
- 205
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Musson Bros., Inc. | $6,156,658 | Low |
| 2 | Northeast Asphalt, Inc | $6,306,561 | +2.0% |
| 3 | James Peterson Sons, Inc. | $6,794,113 | +10% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Musson Bros., Inc. | 2. Northeast Asphalt, Inc | 3. James Peterson Sons, Inc. |
|---|---|---|---|---|---|---|
| 1 | Clearing (201.0105) | STA | 12 | $680.84 | $680.84 | $400.00 |
| 2 | Grubbing (201.0205) | STA | 12 | $608.75 | $608.75 | $630.00 |
| 3 | Removing small pipe culverts (203.0100) | EACH | 5 | $1,145.36 | $1,145.36 | $1,327.00 |
| 4 | Removing concrete pavement (204.0100) | SY | 51,100 | $1.00 | $1.00 | $3.57 |
| 5 | Removing asphaltic surface (204.0110) | SY | 2,050 | $2.12 | $2.12 | $4.05 |
| 6 | Removing asphaltic surface butt joints (204.0115) | SY | 480 | $5.10 | $5.10 | $5.10 |
| 7 | Removing asphaltic surface milling (204.0120) | SY | 26,960 | $1.40 | $1.40 | $1.40 |
| 8 | Removing curb & gutter (204.0150) | LF | 1,730 | $7.38 | $7.38 | $2.00 |
| 9 | Removing guardrail (204.0165) | LF | 370 | $5.00 | $4.00 | $5.00 |
| 10 | Removing concrete bases (204.0195) | EACH | 25 | $565.00 | $565.00 | $565.00 |
| 11 | Removing ancillary structure (structure) 01. S-43-11 (204.0246) | EACH | 1 | $650.00 | $650.00 | $7,500.00 |
| 12 | Removing advance flasher assemblies type 2 (204.9002.S) | EACH | 3 | $2,357.00 | $2,357.00 | $2,357.00 |
| 13 | Removing (item description) 01. traffic signal wire, loop detector wire & lead-in cable, ush 8 & STH 17S (204.9060.S) | EACH | 1 | $1,755.00 | $1,755.00 | $1,755.00 |
| 14 | Removing (item description) 02. traffic signal wire, loop detector wire & lead-in cable, ush 8 & CTH G (204.9060.S) | EACH | 1 | $1,755.00 | $1,755.00 | $1,755.00 |
| 15 | Removing (item description) 03. traffic signal wire, loop detector wire & lead-in cable, ush 8 & STH 17N (204.9060.S) | EACH | 1 | $1,755.00 | $1,755.00 | $1,755.00 |
| 16 | Excavation common (205.0100) | CY | 64,445 | $7.03 | $7.03 | $9.50 |
| 17 | Excavation marsh (205.0400) | CY | 19 | $40.42 | $40.42 | $25.00 |
| 18 | Borrow (208.0100) | CY | 11,020 | $6.54 | $6.54 | $0.01 |
| 19 | Select borrow (208.1100) | CY | 29 | $82.57 | $82.57 | $23.32 |
| 20 | Prepare foundation for asphaltic shoulders (211.0400) | STA | 4 | $669.46 | $800.00 | $100.00 |
| 21 | Finishing roadway (project) 01. 1590-12-75 (213.0100) | EACH | 1 | $1,000.00 | $2,500.00 | $3,000.00 |
| 22 | Base aggregate dense 3/4-inch (305.0110) | TON | 9,100 | $15.14 | $15.14 | $18.27 |
| 23 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 67,700 | $12.01 | $12.01 | $13.24 |
| 24 | Base aggregate open-graded (310.0115) | CY | 50 | $66.74 | $66.74 | $39.79 |
| 25 | Coloring concrete wisdot red (405.0100) | CY | 530 | $92.45 | $92.45 | $92.45 |
| 26 | Concrete truck apron 12-inch (415.2010) | SY | 1,640 | $106.80 | $106.80 | $106.80 |
| 27 | HMA cold weather paving (450.4000) | TON | 1,406 | $3.00 | $3.00 | $3.00 |
| 28 | Tack coat (455.0605) | GAL | 10,450 | $2.80 | $2.80 | $2.80 |
| 29 | Incentive density HMA pavement (460.2000) | DOL | 16,730 | $1.00 | $1.00 | $1.00 |
| 30 | HMA pavement 3 MT 58-28 S (460.6223) | TON | 17,460 | $65.20 | $65.20 | $65.20 |
| 31 | HMA pavement 4 MT 58-34 S (460.6244) | TON | 6,500 | $77.10 | $77.10 | $77.10 |
| 32 | HMA pavement 4 MT 58-34 H (460.6444) | TON | 2,170 | $92.95 | $92.95 | $92.95 |
| 33 | Asphaltic surface (465.0105) | TON | 155 | $230.00 | $230.00 | $230.00 |
| 34 | Asphaltic surface patching (465.0110) | TON | 120 | $143.00 | $143.00 | $143.00 |
| 35 | Asphaltic surface driveways and field entrances (465.0120) | TON | 37 | $164.00 | $164.00 | $164.00 |
| 36 | Asphaltic surface temporary (465.0125) | TON | 1,197 | $83.60 | $83.60 | $83.60 |
| 37 | Asphaltic flumes (465.0315) | SY | 132 | $62.00 | $62.00 | $72.00 |
| 38 | Culvert pipe temporary 18-inch (520.2018) | LF | 120 | $25.88 | $25.88 | $81.00 |
| 39 | Culvert pipe reinforced concrete class III 30-inch (522.0130) | LF | 123 | $210.08 | $210.08 | $283.00 |
| 40 | Apron endwalls for culvert pipe reinforced concrete 12-inch (522.1012) | EACH | 1 | $1,185.85 | $1,185.85 | $1,301.00 |
| 41 | Apron endwalls for culvert pipe reinforced concrete 15-inch (522.1015) | EACH | 6 | $1,259.48 | $1,259.48 | $1,367.00 |
| 42 | Apron endwalls for culvert pipe reinforced concrete 30-inch (522.1030) | EACH | 3 | $2,102.74 | $2,102.74 | $2,029.00 |
| 43 | Apron endwalls for culvert pipe reinforced concrete 36-inch (522.1036) | EACH | 2 | $2,912.65 | $2,912.65 | $2,810.00 |
| 44 | Apron endwalls for culvert pipe reinforced concrete horizontal elliptical 24X38-inch (522.2624) | EACH | 2 | $2,456.16 | $2,456.16 | $2,400.00 |
| 45 | Concrete curb & gutter 18-inch type A (601.0405) | LF | 573 | $48.31 | $48.31 | $48.31 |
| 46 | Concrete curb & gutter 30-inch type D (601.0411) | LF | 4,597 | $31.02 | $31.02 | $31.02 |
| 47 | Concrete curb & gutter 6-inch sloped 36-inch type D (601.0557) | LF | 2,019 | $29.99 | $29.99 | $29.99 |
| 48 | Concrete curb & gutter 4-inch sloped 30-inch type R (601.0581) | LF | 815 | $40.19 | $40.19 | $40.19 |
| 49 | Concrete curb pedestrian (601.0600) | LF | 265 | $46.45 | $46.45 | $46.45 |
| 50 | Concrete sidewalk 4-inch (602.0405) | SF | 14,800 | $8.07 | $8.07 | $8.07 |
| 51 | Concrete sidewalk 6-inch (602.0415) | SF | 3,420 | $9.12 | $9.12 | $9.12 |
| 52 | Curb ramp detectable warning field yellow (602.0505) | SF | 456 | $60.32 | $60.32 | $60.32 |
| 53 | Riprap light (606.0100) | CY | 174 | $148.17 | $148.17 | $112.80 |
| 54 | Riprap medium (606.0200) | CY | 82 | $172.26 | $172.26 | $106.86 |
| 55 | Storm sewer pipe reinforced concrete class III 12-inch (608.0312) | LF | 74 | $128.26 | $128.26 | $196.00 |
| 56 | Storm sewer pipe reinforced concrete class III 15-inch (608.0315) | LF | 240 | $114.79 | $114.79 | $127.90 |
| 57 | Storm sewer pipe reinforced concrete class III 30-inch (608.0330) | LF | 98 | $201.00 | $201.00 | $254.04 |
| 58 | Storm sewer pipe reinforced concrete class IV 12-inch (608.0412) | LF | 147 | $133.57 | $133.57 | $196.00 |
| 59 | Storm sewer pipe reinforced concrete class IV 15-inch (608.0415) | LF | 36 | $112.41 | $112.41 | $127.90 |
| 60 | Storm sewer pipe reinforced concrete class IV 36-inch (608.0436) | LF | 77 | $307.99 | $307.99 | $353.87 |
| 61 | Storm sewer pipe reinforced concrete horizontal elliptical class HE-IV 24X38-inch (608.2424) | LF | 104 | $250.84 | $250.84 | $279.18 |
| 62 | Manhole covers type J-special (611.0535) | EACH | 2 | $1,093.79 | $1,093.79 | $524.00 |
| 63 | Inlet covers type H (611.0624) | EACH | 6 | $1,120.06 | $1,120.06 | $805.00 |
| 64 | Inlet covers type HM (611.0627) | EACH | 10 | $1,125.34 | $1,125.34 | $812.00 |
| 65 | Inlet covers type H-S (611.0639) | EACH | 4 | $1,120.06 | $1,120.06 | $805.00 |
| 66 | Inlet covers type MS (611.0642) | EACH | 1 | $615.86 | $615.86 | $565.00 |
| 67 | Inlet covers type T (611.0652) | EACH | 4 | $1,454.54 | $1,454.54 | $1,429.00 |
| 68 | Manholes 5-FT diameter (611.2005) | EACH | 1 | $7,753.10 | $7,753.10 | $9,101.00 |
| 69 | Manholes 7-FT diameter (611.2007) | EACH | 1 | $9,930.13 | $9,930.13 | $10,596 |
| 70 | Inlets 2X2.5-FT (611.3225) | EACH | 4 | $2,489.07 | $2,489.07 | $2,989.00 |
| 71 | Inlets 2X3-FT (611.3230) | EACH | 18 | $2,670.50 | $2,670.50 | $2,952.00 |
| 72 | Inlets median 2 grate (611.3902) | EACH | 1 | $5,955.93 | $5,955.93 | $5,200.00 |
| 73 | Pipe underdrain 6-inch (612.0106) | LF | 880 | $16.07 | $16.07 | $14.02 |
| 74 | MGS guardrail 3 (614.2300) | LF | 200 | $32.50 | $32.00 | $32.50 |
| 75 | MGS thrie beam transition (614.2500) | LF | 78.80 | $115.00 | $99.00 | $115.00 |
| 76 | MGS guardrail terminal eat (614.2610) | EACH | 2 | $3,785.00 | $5,200.00 | $3,785.00 |
| 77 | Maintenance and repair of haul roads (project) 01. 1590-12-75 (618.0100) | EACH | 1 | $1.00 | $1.00 | $100.00 |
| 78 | Mobilization (619.1000) | EACH | 1 | $275,000 | $383,460 | $411,960 |
| 79 | Concrete median sloped nose (620.0300) | SF | 490 | $13.67 | $13.67 | $13.67 |
| 80 | Water (624.0100) | MGAL | 1,200 | $0.01 | $0.01 | $45.00 |
| 81 | Topsoil (625.0100) | SY | 44,800 | $0.25 | $0.25 | $2.03 |
| 82 | Mulching (627.0200) | SY | 36,600 | $0.35 | $0.25 | $0.35 |
| 83 | Silt fence (628.1504) | LF | 6,590 | $1.85 | $2.00 | $1.85 |
| 84 | Silt fence maintenance (628.1520) | LF | 13,180 | $0.03 | $0.01 | $0.03 |
| 85 | Mobilizations erosion control (628.1905) | EACH | 11 | $151.00 | $400.00 | $151.00 |
| 86 | Mobilizations emergency erosion control (628.1910) | EACH | 6 | $201.00 | $200.00 | $201.00 |
| 87 | Erosion mat urban class I type B (628.2008) | SY | 2,390 | $2.75 | $2.40 | $2.75 |
| 88 | Erosion mat class II type C (628.2027) | SY | 5,180 | $4.25 | $4.00 | $4.25 |
| 89 | Inlet protection type A (628.7005) | EACH | 32 | $150.00 | $175.00 | $150.00 |
| 90 | Inlet protection type B (628.7010) | EACH | 2 | $75.00 | $60.00 | $75.00 |
| 91 | Inlet protection type C (628.7015) | EACH | 24 | $75.00 | $60.00 | $75.00 |
| 92 | Inlet protection type D (628.7020) | EACH | 8 | $250.00 | $150.00 | $250.00 |
| 93 | Temporary ditch checks (628.7504) | LF | 340 | $9.55 | $10.00 | $9.55 |
| 94 | Culvert pipe checks (628.7555) | EACH | 15 | $32.00 | $15.00 | $32.00 |
| 95 | Rock bags (628.7570) | EACH | 120 | $6.00 | $15.00 | $6.00 |
| 96 | Fertilizer type B (629.0210) | CWT | 36 | $105.00 | $155.00 | $105.00 |
| 97 | Seeding mixture no. 40 (630.0140) | LB | 2,290 | $8.55 | $9.00 | $8.55 |
| 98 | Seeding temporary (630.0200) | LB | 110 | $5.25 | $5.00 | $5.25 |
| 99 | Seed water (630.0500) | MGAL | 1,000 | $0.10 | $1.00 | $0.05 |
| 100 | Trees (species, root, size) 01. cole'S select serviceberry, B&B, 5' (632.0101) | EACH | 6 | $825.00 | $475.00 | $825.00 |
| 101 | Landscape planting surveillance and care cycles (632.9101) | EACH | 20 | $1,985.00 | $1,250.00 | $1,985.00 |
| 102 | Delineators temporary (633.1100) | EACH | 65 | $18.00 | $22.38 | $18.00 |
| 103 | Posts wood 4X6-inch X 12-FT (634.0612) | EACH | 2 | $90.00 | $135.00 | $90.00 |
| 104 | Posts wood 4X6-inch X 14-FT (634.0614) | EACH | 75 | $98.00 | $135.00 | $98.00 |
| 105 | Posts wood 4X6-inch X 16-FT (634.0616) | EACH | 13 | $101.00 | $150.00 | $101.00 |
| 106 | Posts wood 4X6-inch X 18-FT (634.0618) | EACH | 2 | $105.00 | $165.00 | $105.00 |
| 107 | Signs type II reflective H (637.2210) | SF | 811.23 | $22.75 | $24.00 | $22.75 |
| 108 | Signs type II reflective F (637.2230) | SF | 59.50 | $25.75 | $25.00 | $25.75 |
| 109 | Moving signs type II (638.2102) | EACH | 10 | $85.00 | $100.00 | $85.00 |
| 110 | Removing signs type II (638.2602) | EACH | 74 | $25.00 | $35.00 | $25.00 |
| 111 | Removing small sign supports (638.3000) | EACH | 61 | $25.00 | $35.00 | $25.00 |
| 112 | Moving small sign supports (638.4000) | EACH | 11 | $85.00 | $100.00 | $85.00 |
| 113 | Field office type B (642.5001) | EACH | 1 | $15,000 | $14,670 | $10,000 |
| 114 | Traffic control drums (643.0300) | DAY | 19,829 | $0.27 | $0.29 | $0.27 |
| 115 | Traffic control barricades type III (643.0420) | DAY | 7,548 | $0.45 | $0.50 | $0.45 |
| 116 | Traffic control warning lights type A (643.0705) | DAY | 10,210 | $0.05 | $0.21 | $0.05 |
| 117 | Traffic control warning lights type C (643.0715) | DAY | 4,466 | $0.05 | $0.46 | $0.05 |
| 118 | Traffic control signs (643.0900) | DAY | 48,258 | $0.29 | $0.28 | $0.29 |
| 119 | Traffic control covering signs type II (643.0920) | EACH | 10 | $25.00 | $118.93 | $25.00 |
| 120 | Traffic control signs PCMS (643.1050) | DAY | 28 | $40.00 | $65.00 | $40.00 |
| 121 | Temporary marking line paint 6- inch (643.3165) | LF | 8,800 | $0.40 | $0.45 | $0.40 |
| 122 | Temporary marking line removable tape 6-inch (643.3180) | LF | 2,140 | $1.69 | $2.79 | $1.69 |
| 123 | Temporary marking raised pavement marker type I (643.3760) | EACH | 21 | $4.75 | $22.84 | $4.75 |
| 124 | Temporary marking stop line removable tape 18-inch (643.3850) | LF | 106 | $5.25 | $12.48 | $5.25 |
| 125 | Traffic control (643.5000) | EACH | 1 | $2,850.00 | $21,643 | $2,850.00 |
| 126 | Geotextile type DF schedule A (645.0111) | SY | 640 | $5.36 | $5.36 | $3.00 |
| 127 | Geotextile type HR (645.0120) | SY | 1,015 | $7.27 | $7.27 | $4.78 |
| 128 | Marking line grooved wet ref epoxy 6-inch (646.2040) | LF | 57,700 | $1.50 | $1.50 | $1.50 |
| 129 | Marking line grooved wet ref epoxy 10-inch (646.4040) | LF | 1,750 | $2.35 | $2.35 | $2.35 |
| 130 | Marking line same day paint 4- inch (646.4505) | LF | 5,860 | $0.80 | $0.80 | $0.80 |
| 131 | Marking line same day paint 8- inch (646.4605) | LF | 520 | $1.45 | $1.45 | $1.45 |
| 132 | Marking arrow epoxy (646.5020) | EACH | 16 | $300.00 | $300.00 | $300.00 |
| 133 | Marking word epoxy (646.5120) | EACH | 8 | $315.00 | $315.00 | $315.00 |
| 134 | Marking stop line epoxy 12-inch (646.6020) | LF | 90 | $14.00 | $14.00 | $14.00 |
| 135 | Marking stop line epoxy 18-inch (646.6120) | LF | 92 | $19.00 | $19.00 | $19.00 |
| 136 | Marking dotted extension epoxy 18-inch (646.6320) | LF | 150 | $18.00 | $18.00 | $18.00 |
| 137 | Cold weather marking epoxy 6-inch (646.6466) | LF | 25,326 | $0.55 | $0.55 | $0.55 |
| 138 | Cold weather marking epoxy 10- inch (646.6470) | LF | 1,750 | $1.15 | $1.15 | $1.15 |
| 139 | Marking diagonal epoxy 12-inch (646.7120) | LF | 720 | $14.00 | $14.00 | $14.00 |
| 140 | Marking crosswalk epoxy transverse line 6-inch (646.7420) | LF | 890 | $7.00 | $7.00 | $7.00 |
| 141 | Marking curb epoxy (646.8120) | LF | 80 | $8.00 | $8.00 | $8.00 |
| 142 | Marking island nose epoxy (646.8220) | EACH | 8 | $340.00 | $340.00 | $340.00 |
| 143 | Marking removal line 6-inch (646.9002) | LF | 2,231 | $3.00 | $1.60 | $1.60 |
| 144 | Construction staking storm sewer (650.4000) | EACH | 37 | $135.14 | $135.14 | $135.00 |
| 145 | Construction staking subgrade (650.4500) | LF | 18,061 | $0.01 | $0.01 | $0.01 |
| 146 | Construction staking base (650.5000) | LF | 18,061 | $0.28 | $0.28 | $0.96 |
| 147 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 9,370 | $0.38 | $0.38 | $1.22 |
| 148 | Construction staking pipe culverts (650.6000) | EACH | 1 | $1,000.00 | $1,000.00 | $600.00 |
| 149 | Construction staking resurfacing reference (650.8000) | LF | 5,268 | $0.28 | $0.28 | $0.11 |
| 150 | Construction staking electrical installations (project) 01. 1590-12- 75 (650.8501) | EACH | 1 | $4,000.00 | $4,000.00 | $5,000.00 |
| 151 | Construction staking curb ramps (650.9000) | EACH | 32 | $207.81 | $207.81 | $135.00 |
| 152 | Construction staking sidewalk (project) 01. 1590-12-75 (650.9500) | EACH | 1 | $1,500.00 | $1,500.00 | $1,500.00 |
| 153 | Construction staking supplemental control (project) 01. 1590-12-75 (650.9911) | EACH | 1 | $3,000.00 | $3,000.00 | $3,000.00 |
| 154 | Construction staking slope stakes (650.9920) | LF | 18,061 | $0.53 | $0.53 | $0.92 |
| 155 | Conduit rigid nonmetallic schedule 40 2-inch (652.0225) | LF | 3,949 | $11.11 | $11.11 | $11.11 |
| 156 | Conduit rigid nonmetallic schedule 40 3-inch (652.0235) | LF | 300 | $13.70 | $13.70 | $13.70 |
| 157 | Conduit loop detector (652.0800) | LF | 90 | $11.80 | $11.80 | $11.80 |
| 158 | Pull boxes steel 12X30-inch (653.0110) | EACH | 2 | $1,285.00 | $1,285.00 | $1,285.00 |
| 159 | Pull boxes non-conductive 24X42- inch (653.0164) | EACH | 20 | $2,285.00 | $2,285.00 | $2,285.00 |
| 160 | Removing pull boxes (653.0905) | EACH | 41 | $468.00 | $468.00 | $468.00 |
| 161 | Concrete bases type 5 (654.0105) | EACH | 28 | $1,418.00 | $1,418.00 | $1,418.00 |
| 162 | Concrete control cabinet bases type L30 (654.0230) | EACH | 2 | $2,761.00 | $2,761.00 | $2,761.00 |
| 163 | Cable traffic signal 7-12 AWG (655.0235) | LF | 450 | $3.66 | $3.66 | $3.66 |
| 164 | Electrical wire lighting 12 AWG (655.0610) | LF | 4,200 | $1.10 | $1.10 | $1.10 |
| 165 | Electrical wire lighting 10 AWG (655.0615) | LF | 16,182 | $1.25 | $1.25 | $1.25 |
| 166 | Electrical wire lighting 8 AWG (655.0620) | LF | 1,965 | $1.65 | $1.65 | $1.65 |
| 167 | Loop detector lead in cable (655.0700) | LF | 1,035 | $2.48 | $2.48 | $2.48 |
| 168 | Loop detector wire (655.0800) | LF | 320 | $1.25 | $1.25 | $1.25 |
| 169 | Electrical service meter breaker pedestal (location) 01. LCC B (656.0201) | EACH | 1 | $2,845.00 | $2,845.00 | $2,845.00 |
| 170 | Electrical service meter breaker pedestal (location) 02. LCC B (656.0201) | EACH | 1 | $2,845.00 | $2,845.00 | $2,845.00 |
| 171 | Pedestal bases (657.0100) | EACH | 1 | $370.00 | $370.00 | $370.00 |
| 172 | Transformer bases breakaway 11 1/2-inch bolt circle (657.0255) | EACH | 28 | $750.00 | $750.00 | $750.00 |
| 173 | Poles type 5-aluminum (657.0322) | EACH | 28 | $2,755.00 | $2,755.00 | $2,755.00 |
| 174 | Traffic signal standards aluminum 15-FT (657.0425) | EACH | 1 | $886.00 | $886.00 | $886.00 |
| 175 | Trombone arms 25-FT (657.0595) | EACH | 1 | $2,390.00 | $2,390.00 | $2,390.00 |
| 176 | Luminaire arms single member 4 1/2-inch clamp 8-FT (657.0615) | EACH | 28 | $486.00 | $486.00 | $486.00 |
| 177 | Traffic signal face 5S 12-inch (658.0175) | EACH | 2 | $1,356.00 | $1,356.00 | $1,356.00 |
| 178 | Luminaires utility LED A (659.1115) | EACH | 28 | $295.00 | $295.00 | $295.00 |
| 179 | Lighting control cabinets 120/240 30-inch (659.2130) | EACH | 2 | $10,871 | $10,871 | $10,871 |
| 180 | Lamp, ballast, LED, switch disposal by contractor (659.5000.S) | EACH | 13 | $46.00 | $46.00 | $46.00 |
| 181 | Temporary traffic signals for bridges (structure) 01. station 37+50 (661.0101) | EACH | 1 | $16,800 | $13,592 | $10,000 |
| 182 | Temporary traffic signals for bridges (structure) 02. station 83+81 (661.0101) | EACH | 1 | $4,400.00 | $6,641.29 | $10,000 |
| 183 | Sawing asphalt (690.0150) | LF | 3,640 | $3.00 | $1.75 | $2.00 |
| 184 | Sawing concrete (690.0250) | LF | 300 | $5.00 | $2.95 | $2.50 |
| 185 | Incentive compressive strength concrete pavement (715.0720) | DOL | 500 | $1.00 | $1.00 | $1.00 |
| 186 | Incentive iri ride (740.0440) | DOL | 6,000 | $1.00 | $1.00 | $1.00 |
| 187 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 2,400 | $5.00 | $5.00 | $5.00 |
| 188 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 2,760 | $5.00 | $5.00 | $5.00 |
| 189 | Special 01. planting mixture (SPV.0035) | CY | 145 | $125.00 | $97.50 | $125.00 |
| 190 | Special 01. driveway assistance device system 1590-12-75 (SPV.0045) | DAY | 100 | $50.00 | $85.44 | $50.00 |
| 191 | Special 01. perennials autumn joy sedum, SP4, CG (SPV.0060) | EACH | 238 | $32.00 | $40.00 | $32.00 |
| 192 | Special 02. perennials blue oat grass, SP4, CG (SPV.0060) | EACH | 291 | $32.00 | $40.00 | $32.00 |
| 193 | Special 03. perennials catmint 'walkers low', SP4, CG (SPV.0060) | EACH | 225 | $32.00 | $32.00 | $32.00 |
| 194 | Special 04. perennials prarie dropseed, SP4, CG (SPV.0060) | EACH | 873 | $32.00 | $40.00 | $32.00 |
| 195 | Special 05. inlets 5-FT diameter (SPV.0060) | EACH | 2 | $7,237.64 | $7,237.64 | $7,148.00 |
| 196 | Special 06. salvage traffic signals ush 8 & STH 17 (SPV.0060) | EACH | 1 | $10,515 | $10,515 | $10,515 |
| 197 | Special 07. salvage traffic signals ush 8 & CTH G (SPV.0060) | EACH | 1 | $10,515 | $10,515 | $10,515 |
| 198 | Special 08. traffic signal modifications courtney ST & pelham ST (SPV.0060) | EACH | 1 | $7,671.00 | $7,671.00 | $7,671.00 |
| 199 | Special 01. concrete curb & gutter 4-inch sloped 36-inch type A full depth (SPV.0090) | LF | 611 | $42.86 | $42.86 | $42.86 |
| 200 | Special 02. installing and maintaining climbing turtle exclusion fence (SPV.0090) | LF | 2,160 | $1.00 | $12.00 | $1.00 |
| 201 | Special 01. stone mulch epoxied (SPV.0165) | SF | 4,016 | $12.65 | $9.50 | $12.65 |
| 202 | Special 02. weed barrier (SPV.0165) | SF | 11,825 | $0.75 | $0.65 | $0.75 |
| 203 | Special 01. protective thermoplastic coating at snowmobile crossing (SPV.0180) | SY | 384 | $100.00 | $100.00 | $100.00 |
| 204 | Special 02. removing distressed asphaltic surface milling (SPV.0180) | SY | 500 | $13.80 | $13.80 | $13.80 |
| 205 | Special 01. stone mulch (SPV.0195) | TON | 164 | $80.00 | $125.00 | $80.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of September 9, 2025. Compiled by Mirage Metrics.