WisDOT contract 20250909026 bid tabulation
Ino - Ashland; N Fish Creek Bridge B-04-0022 (USH 002, Bayfield County Ino - Ashland). Let by Wisconsin DOT on September 9, 2025, Bayfield. 4 bids received; low bid $1,692,940 by Sheet Piling Services LLC.
- Owner
- Wisconsin DOT
- Letting
- 09 SEP 2025
- Pay items
- 88
- Data through
- 10 NOV 2026
3 of the 4 bids matched their published totals to within a dollar and are shown; the others are left out.
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Sheet Piling Services LLC | $1,692,940 | Low |
| 2 | Lunda Construction Company | $1,749,700 | +3.0% |
| 3 | Northland Constructors of Duluth, Mathy | $1,847,000 | +9.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Sheet Piling Services LLC | 2. Lunda Construction Company | 3. Northland Constructors of Duluth, Mathy |
|---|---|---|---|---|---|---|
| 1 | Abatement of asbestos containing material (structure) 01. B-04-0022 (203.0211.S) | EACH | 1 | $11,000 | $15,000 | $8,200.00 |
| 2 | Removing concrete pavement (204.0100) | SY | 194 | $7.00 | $7.00 | $44.00 |
| 3 | Removing asphaltic surface butt joints (204.0115) | SY | 444 | $21.92 | $21.92 | $21.92 |
| 4 | Removing asphaltic surface milling (204.0120) | SY | 1,942 | $16.69 | $16.69 | $16.69 |
| 5 | Removing inlets (204.0220) | EACH | 1 | $500.00 | $500.00 | $337.33 |
| 6 | Excavation common (205.0100) | CY | 120 | $20.00 | $20.00 | $13.82 |
| 7 | Borrow (208.0100) | CY | 1,394 | $21.00 | $21.00 | $24.42 |
| 8 | Select borrow (208.1100) | CY | 18 | $30.00 | $30.00 | $31.55 |
| 9 | Backfill structure type A (210.1500) | TON | 45 | $45.00 | $70.00 | $34.36 |
| 10 | Finishing roadway (project) 01. 1180-00-79 (213.0100) | EACH | 1 | $1,500.00 | $500.00 | $400.00 |
| 11 | Base aggregate dense 3/4-inch (305.0110) | TON | 883 | $22.50 | $22.50 | $33.64 |
| 12 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 168 | $23.00 | $23.00 | $24.09 |
| 13 | Concrete pavement 12-inch (415.0120) | SY | 68 | $160.02 | $160.02 | $200.00 |
| 14 | Concrete pavement approach slab (415.0410) | SY | 80 | $303.64 | $303.64 | $425.00 |
| 15 | Tack coat (455.0605) | GAL | 1,005 | $4.24 | $4.24 | $4.24 |
| 16 | Incentive density HMA pavement (460.2000) | DOL | 890 | $1.00 | $1.00 | $1.00 |
| 17 | HMA pavement 4 MT 58-34 S (460.6244) | TON | 1,364 | $131.53 | $131.53 | $131.53 |
| 18 | Asphaltic surface (465.0105) | TON | 461 | $110.27 | $110.27 | $110.27 |
| 19 | Concrete masonry bridges (502.0100) | CY | 250 | $1,300.00 | $1,000.00 | $2,000.00 |
| 20 | Protective surface treatment (502.3200) | SY | 689 | $2.50 | $3.00 | $9.00 |
| 21 | Pigmented surface sealer (502.3210) | SY | 159 | $3.00 | $5.00 | $30.00 |
| 22 | Adhesive anchors no. 5 bar (502.4205) | EACH | 606 | $30.00 | $5.00 | $25.00 |
| 23 | Bar steel reinforcement HS coated structures (505.0600) | LB | 65,290 | $1.85 | $1.80 | $1.65 |
| 24 | Steel diaphragms (structure) 01. B- 04-0022 (506.4000) | EACH | 15 | $3,000.00 | $1,500.00 | $1,050.00 |
| 25 | Concrete surface repair (509.1500) | SF | 32 | $200.00 | $200.00 | $200.00 |
| 26 | Rubberized membrane waterproofing (516.0500) | SY | 28 | $18.00 | $20.00 | $45.00 |
| 27 | Culvert pipe reinforced concrete class III 12-inch (522.0112) | LF | 36 | $90.00 | $90.00 | $162.56 |
| 28 | Concrete barrier temporary precast delivered (603.8000) | LF | 588 | $18.00 | $20.00 | $18.00 |
| 29 | Concrete barrier temporary precast installed (603.8125) | LF | 1,176 | $11.00 | $10.00 | $11.00 |
| 30 | Riprap medium (606.0200) | CY | 9 | $100.00 | $100.00 | $121.14 |
| 31 | Riprap heavy (606.0300) | CY | 52 | $90.00 | $120.00 | $127.71 |
| 32 | Inlet covers type S (611.0651) | EACH | 1 | $800.00 | $800.00 | $1,619.00 |
| 33 | Inlets 2X2-FT (611.3220) | EACH | 2 | $2,750.00 | $2,750.00 | $4,768.00 |
| 34 | Barrier system grading shaping finishing (614.0010) | EACH | 2 | $4,500.00 | $4,750.00 | $250.00 |
| 35 | Anchor assemblies for steel plate beam guard (614.0150) | EACH | 4 | $250.00 | $200.00 | $450.00 |
| 36 | Crash cushions temporary (614.0905) | EACH | 2 | $4,500.00 | $4,750.00 | $4,500.00 |
| 37 | Salvaged rail (614.0920) | LF | 968 | $3.50 | $3.50 | $3.50 |
| 38 | MGS guardrail 3 (614.2300) | LF | 614 | $28.95 | $28.95 | $28.95 |
| 39 | MGS thrie beam transition (614.2500) | LF | 150 | $99.25 | $99.25 | $99.25 |
| 40 | MGS guardrail terminal eat (614.2610) | EACH | 4 | $3,585.00 | $3,585.00 | $3,585.00 |
| 41 | Maintenance and repair of haul roads (project) 01. 1180-00-79 (618.0100) | EACH | 1 | $1.00 | $1.00 | $1.00 |
| 42 | Mobilization (619.1000) | EACH | 1 | $136,728 | $445,723 | $132,103 |
| 43 | Water (624.0100) | MGAL | 10 | $50.00 | $50.00 | $31.11 |
| 44 | Salvaged topsoil (625.0500) | SY | 4,078 | $3.50 | $3.50 | $3.78 |
| 45 | Mulching (627.0200) | SY | 4,078 | $1.25 | $1.25 | $1.25 |
| 46 | Erosion bales (628.1104) | EACH | 20 | $18.00 | $18.00 | $18.00 |
| 47 | Silt fence (628.1504) | LF | 2,010 | $2.65 | $2.65 | $2.65 |
| 48 | Silt fence maintenance (628.1520) | LF | 2,010 | $0.03 | $0.03 | $0.03 |
| 49 | Mobilizations erosion control (628.1905) | EACH | 2 | $501.00 | $501.00 | $501.00 |
| 50 | Mobilizations emergency erosion control (628.1910) | EACH | 1 | $601.00 | $601.00 | $601.00 |
| 51 | Fertilizer type B (629.0210) | CWT | 27 | $30.00 | $30.00 | $30.00 |
| 52 | Seeding mixture no. 10 (630.0110) | LB | 113 | $11.65 | $11.65 | $11.65 |
| 53 | Seeding temporary (630.0200) | LB | 113 | $4.85 | $4.85 | $4.85 |
| 54 | Seed water (630.0500) | MGAL | 95 | $20.00 | $20.00 | $20.00 |
| 55 | Moving signs type II (638.2102) | EACH | 4 | $125.00 | $125.00 | $125.00 |
| 56 | Moving small sign supports (638.4000) | EACH | 2 | $125.00 | $125.00 | $125.00 |
| 57 | Field office type B (642.5001) | EACH | 1 | $4,000.00 | $4,500.00 | $14,500 |
| 58 | Traffic control drums (643.0300) | DAY | 4,420 | $0.25 | $0.50 | $0.25 |
| 59 | Traffic control barricades type III (643.0420) | DAY | 66 | $1.50 | $1.00 | $1.50 |
| 60 | Traffic control warning lights type C (643.0715) | DAY | 650 | $0.25 | $0.10 | $0.25 |
| 61 | Traffic control signs (643.0900) | DAY | 3,770 | $0.50 | $1.50 | $0.50 |
| 62 | Temporary marking line paint 6- inch (643.3165) | LF | 5,170 | $0.75 | $0.40 | $0.75 |
| 63 | Temporary marking stop line paint 18-inch (643.3805) | LF | 48 | $26.25 | $2.25 | $26.25 |
| 64 | Traffic control (643.5000) | EACH | 1 | $18,250 | $2,600.00 | $18,250 |
| 65 | Geotextile type DF schedule A (645.0111) | SY | 30 | $3.00 | $5.00 | $2.31 |
| 66 | Geotextile type HR (645.0120) | SY | 120 | $5.00 | $5.00 | $3.66 |
| 67 | Marking line grooved wet ref epoxy 6-inch (646.2040) | LF | 5,100 | $3.00 | $3.35 | $3.00 |
| 68 | Marking removal line 4-inch (646.9000) | LF | 160 | $0.95 | $1.50 | $0.95 |
| 69 | Marking removal line 6-inch (646.9002) | LF | 3,975 | $1.00 | $1.60 | $1.00 |
| 70 | Construction staking storm sewer (650.4000) | EACH | 1 | $2,000.00 | $2,000.00 | $2,000.00 |
| 71 | Construction staking subgrade (650.4500) | LF | 40 | $0.01 | $0.01 | $0.01 |
| 72 | Construction staking base (650.5000) | LF | 40 | $50.00 | $50.00 | $50.00 |
| 73 | Construction staking structure layout (structure) 01. B-04-0022 (650.6501) | EACH | 1 | $8,000.00 | $8,000.00 | $8,000.00 |
| 74 | Construction staking concrete pavement (650.7000) | LF | 30 | $50.00 | $50.00 | $50.00 |
| 75 | Construction staking resurfacing reference (650.8000) | LF | 1,224 | $2.55 | $2.55 | $2.55 |
| 76 | Construction staking supplemental control (project) 01. 1180-00-79 (650.9911) | EACH | 1 | $3,000.00 | $3,000.00 | $3,000.00 |
| 77 | Construction staking slope stakes (650.9920) | LF | 732 | $4.00 | $4.00 | $4.00 |
| 78 | Temporary traffic signals for bridges (structure) 01. B-04-0022 (661.0101) | EACH | 1 | $6,075.00 | $21,600 | $6,075.00 |
| 79 | Sawing asphalt (690.0150) | LF | 160 | $2.15 | $2.15 | $2.25 |
| 80 | Sawing concrete (690.0250) | LF | 40 | $3.20 | $3.20 | $3.25 |
| 81 | Incentive strength concrete structures (715.0502) | DOL | 1,500 | $1.00 | $1.00 | $1.00 |
| 82 | Incentive compressive strength concrete pavement (715.0720) | DOL | 500 | $1.00 | $1.00 | $1.00 |
| 83 | Installing and maintaining bird deterrent system (station) 01. 1409+02 (999.2000.S) | EACH | 1 | $1,900.00 | $1,900.00 | $8,000.00 |
| 84 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 300 | $5.00 | $5.00 | $5.00 |
| 85 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 300 | $5.00 | $5.00 | $5.00 |
| 86 | Special 01. removing structure over waterway minimal debris (B- 04-22, stage 1) (SPV.0060) | EACH | 1 | $185,000 | $200,000 | $195,000 |
| 87 | Special 02. removing structure over waterway minimal debris (B- 04-22, stage 2) (SPV.0060) | EACH | 1 | $185,000 | $20,000 | $180,000 |
| 88 | Special 01. fiber wrap reinforcing non-structural (SPV.0165) | SF | 485 | $115.00 | $115.00 | $45.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of September 9, 2025. Compiled by Mirage Metrics.