WisDOT contract 20251014008 bid tabulation

Appleton - De Pere; Buchanan St Overpass (IH 041, Outagamie County Appleton - De Pere). Let by Wisconsin DOT on October 14, 2025, Outagamie. 5 bids received; low bid $4,258,894 by Vinton Construction Company.

Owner
Wisconsin DOT
Letting
14 OCT 2025
Pay items
154
Data through
10 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Vinton Construction Company$4,258,894Low
2Lunda Construction Company$4,310,605+1.0%
3Sheet Piling Services LLC$4,489,254+5.0%
4Zignego Company, Inc.$4,757,754+12%
5Zenith Tech., Inc. - Waukesha$4,981,125+17%
WisDOT contract 20251014008: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Vinton Construction Company2. Lunda Construction Company3. Sheet Piling Services LLC4. Zignego Company, Inc.5. Zenith Tech., Inc. - Waukesha
1Clearing (201.0105)STA2$940.00$2,642.69$2,642.69$2,642.69$2,642.69
2Grubbing (201.0205)STA2$470.00$1,507.93$1,507.93$1,507.93$1,507.93
3Removing small pipe culverts (203.0100)EACH2$1,587.76$490.00$490.00$5,000.00$490.00
4Removing structure (structure) 01. B-44-338 (203.0220)EACH1$381,200$505,605$350,000$455,000$343,000
5Removing asphaltic surface (204.0110)SY105$17.43$20.00$20.00$20.00$60.00
6Removing asphaltic surface milling (204.0120)SY890$4.50$4.50$4.50$4.50$4.50
7Removing curb & gutter (204.0150)LF48$10.00$6.10$6.10$20.00$10.00
8Removing concrete barrier (204.0157)LF110$21.00$25.00$21.00$25.00$60.00
9Removing guardrail (204.0165)LF1,150$3.00$3.00$3.00$3.00$3.00
10Removing cable barrier (204.0167)LF695$4.00$4.00$4.00$4.00$4.00
11Removing delineators and markers (204.0180)EACH10$25.00$25.00$25.00$25.00$25.00
12Removing surface drains (204.0190)EACH4$225.00$103.00$103.00$500.00$200.00
13Excavation common (205.0100)CY2,098$9.71$5.00$5.00$25.17$10.00
14Excavation for structures bridges (structure) 01. B-44-332 (206.1001)EACH1$23,300$13,750$59,940$13,750$25,000
15Borrow (208.0100)CY10,246$0.01$0.01$0.01$0.01$0.01
16Backfill granular grade 1 (209.1500)TON200$40.00$20.50$20.50$50.00$20.50
17Backfill structure type A (210.1500)TON839$31.25$26.00$26.00$50.00$26.00
18Prepare foundation for asphaltic paving (project) 01. 1130-66-82 (211.0101)EACH1$2,700.00$2,700.00$2,700.00$2,700.00$2,700.00
19Prepare foundation for asphaltic shoulders (211.0400)STA22$165.00$165.00$165.00$165.00$165.00
20Finishing roadway (project) 01. 1130-66-82 (213.0100)EACH1$2,500.00$1,000.00$0.01$1,000.00$1,500.00
21Base aggregate dense 3/4-inch (305.0110)TON270$33.50$30.00$30.00$50.00$55.00
22Base aggregate dense 1 1/4-inch (305.0120)TON1,671$7.90$22.50$22.50$23.11$17.30
23Select crushed material (312.0110)TON2,785$14.98$19.50$19.50$22.00$12.40
24Concrete pavement 8-inch (415.0080)SY2,815$68.05$77.75$77.75$78.00$75.80
25Concrete pavement approach slab (415.0410)SY108$225.00$237.00$237.00$300.00$253.39
26Concrete pavement joint filling (415.4100)SY3,040$2.50$2.60$2.60$2.00$3.89
27Tack coat (455.0605)GAL84$15.25$15.25$15.25$15.25$15.25
28Incentive density HMA pavement (460.2000)DOL150$1.00$1.00$1.00$1.00$1.00
29HMA pavement 3 LT 58-28 S (460.5223)TON40$204.10$204.10$204.10$204.10$204.10
30HMA pavement 4 LT 58-28 S (460.5224)TON190$219.50$219.50$219.50$219.50$219.50
31Asphaltic flumes (465.0315)SY60$67.50$67.50$67.50$67.50$67.50
32Asphaltic rumble strips, shoulder divided roadway (465.0510)LF2,110$2.10$2.10$2.10$2.10$2.10
33Ice hot weather concreting (501.1000.S)LB4,324$0.75$0.01$0.75$0.01$1.06
34Concrete masonry bridges (502.0100)CY197$830.00$550.00$850.00$550.00$1,000.00
35Protective surface treatment (502.3200)SY1,119$3.90$3.00$3.00$3.00$3.80
36Pigmented surface sealer (502.3210)SY561$7.90$2.00$4.00$2.00$10.00
37Prestressed girder type I 54W-inch (503.0155)LF1,024$250.00$345.00$250.00$345.00$250.00
38Bar steel reinforcement HS structures (505.0400)LB10,070$1.01$1.00$1.45$1.00$1.17
39Bar steel reinforcement HS coated structures (505.0600)LB122,300$1.11$1.11$1.55$1.11$1.34
40Bearing pads elastomeric non- laminated (506.2605)EACH20$100.00$125.00$125.00$125.00$130.00
41Steel diaphragms (structure) 01. B- 44-332 (506.4000)EACH16$1,500.00$1,500.00$1,250.00$1,500.00$1,500.00
42Temporary shoring (structure) 01. B-44-332 (511.1200)SF480$34.00$0.01$0.01$0.01$55.00
43Railing tubular screening (513.4091)LF947$267.25$211.50$225.00$211.50$250.00
44Rubberized membrane waterproofing (516.0500)SY38$60.00$25.00$18.00$25.00$50.00
45Concrete staining (structure) 01. B- 44-332 (517.1010.S)SF7,886$2.24$2.24$2.24$2.24$2.24
46Concrete staining (structure) 02. B- 44-330 (517.1010.S)SF7,349$2.24$2.24$2.24$2.24$2.24
47Concrete staining (structure) 03. B- 44-331 (517.1010.S)SF4,686$2.24$2.24$2.24$2.24$2.24
48Concrete staining (structure) 04. B- 44-179 (517.1010.S)SF9,615$2.24$2.24$2.24$2.24$2.24
49Concrete staining (structure) 05. B- 44-333 (517.1010.S)SF4,279$2.24$2.24$2.24$2.24$2.24
50Concrete staining (structure) 06. B- 44-338 (517.1010.S)SF5,113$2.24$2.24$2.24$2.24$2.24
51Concrete staining (structure) 07. R- 44-57 (517.1010.S)SF4,958$2.24$2.24$2.24$2.24$2.24
52Concrete staining (structure) 08. R- 44-50 (517.1010.S)SF1,372$2.24$2.24$2.24$2.24$2.24
53Concrete staining (structure) 09. R- 44-51 (517.1010.S)SF1,798$2.24$2.24$2.24$2.24$2.24
54Culvert pipe reinforced concrete class IV 18-inch (522.0418)LF401$148.19$101.00$101.00$190.00$101.00
55Apron endwalls for culvert pipe reinforced concrete 12-inch (522.1012)EACH4$1,320.75$1,260.00$1,260.00$1,500.00$1,260.00
56Apron endwalls for culvert pipe reinforced concrete 18-inch (522.1018)EACH4$1,760.33$1,420.00$1,420.00$1,850.00$1,420.00
57Pre-boring unconsolidated materials (550.0010)LF86$63.00$0.01$0.01$0.01$0.01
58Piling steel HP 12-inch X 53 LB (550.1120)LF2,705$14.00$42.00$57.00$42.00$70.00
59Concrete curb integral type D (601.0150)LF1,254$25.00$18.20$18.20$25.00$20.00
60Concrete sidewalk 4-inch (602.0405)SF9,250$6.65$6.35$6.35$7.86$6.50
61Concrete surface drains (602.3010)CY10$250.00$995.00$995.00$1,000.00$800.00
62Concrete barrier type S42 (603.1142)LF224$275.00$300.00$385.00$350.00$274.46
63Concrete barrier temporary precast delivered (603.8000)LF3,700$8.00$6.00$23.00$6.00$12.00
64Concrete barrier temporary precast installed (603.8125)LF4,300$5.00$2.50$4.25$2.50$6.00
65Anchoring concrete barrier temporary precast (603.8500)LF600$6.00$6.00$19.50$6.00$10.00
66Slope paving select crushed material (604.0600)SY458$50.00$50.00$50.00$50.00$50.00
67Riprap medium (606.0200)CY233$90.00$290.00$290.00$160.00$120.00
68Storm sewer pipe reinforced concrete class III 12-inch (608.0312)LF146$111.65$96.50$96.50$90.00$96.50
69Inlet covers type H (611.0624)EACH6$740.39$844.00$844.00$1,200.00$844.00
70Inlets 2X3-FT (611.3230)EACH6$3,414.72$1,970.00$1,970.00$3,000.00$1,970.00
71Pipe underdrain wrapped 6-inch (612.0406)LF727$6.50$4.90$4.90$15.00$4.90
72Anchorages for steel plate beam guard type 2 (614.0115)EACH2$1,200.00$1,200.00$1,200.00$1,200.00$1,200.00
73Steel plate beam guard class A (614.0305)LF178$30.00$30.00$30.00$30.00$30.00
74Adjusting steel plate beam guard (614.0400)LF530$9.75$9.75$9.75$9.75$9.75
75Crash cushions temporary (614.0905)EACH4$4,915.00$4,915.00$4,915.00$6,000.00$10,000
76MGS guardrail 3 (614.2300)LF777$29.00$29.00$29.00$29.00$29.00
77MGS guardrail terminal eat (614.2610)EACH2$4,100.00$4,100.00$4,100.00$4,100.00$4,100.00
78MGS guardrail terminal type 2 (614.2620)EACH2$2,800.00$2,800.00$2,800.00$2,800.00$2,800.00
79Fence chain link salvaged 5-FT (616.0405)LF325$50.25$48.00$5.00$48.00$48.00
80Fence safety (616.0700.S)LF325$4.50$4.50$4.50$4.50$4.50
81Maintenance and repair of haul roads (project) 01. 1130-66-82 (618.0100)EACH1$0.01$0.01$0.01$1.00$1,000.00
82Mobilization (619.1000)EACH1$615,000$425,326$385,833$581,000$687,000
83Water (624.0100)MGAL95$0.01$1.00$1.00$150.00$70.00
84Topsoil (625.0100)SY3,170$0.01$4.00$4.00$4.00$5.50
85Salvaged topsoil (625.0500)SY9,740$2.00$1.30$1.30$4.00$2.50
86Silt fence (628.1504)LF1,745$2.25$2.25$2.25$2.25$2.25
87Silt fence maintenance (628.1520)LF3,490$0.01$0.01$0.01$0.01$0.01
88Mobilizations erosion control (628.1905)EACH8$100.00$100.00$100.00$100.00$100.00
89Mobilizations emergency erosion control (628.1910)EACH5$100.00$100.00$100.00$100.00$100.00
90Erosion mat class I type A (628.2002)SY12,910$1.15$1.15$1.15$1.15$1.15
91Inlet protection type A (628.7005)EACH6$100.00$100.00$100.00$100.00$100.00
92Inlet protection type C (628.7015)EACH6$65.00$65.00$65.00$65.00$65.00
93Temporary ditch checks (628.7504)LF145$8.95$8.95$8.95$8.95$8.95
94Stone ditch checks (628.7515.S)CY25$100.00$30.00$30.00$1,000.00$100.00
95Culvert pipe checks (628.7555)EACH15$18.00$18.00$18.00$18.00$18.00
96Tracking pads (628.7560)EACH2$0.01$500.00$500.00$1,000.00$2,500.00
97Rock bags (628.7570)EACH140$18.00$18.00$18.00$18.00$18.00
98Fertilizer type B (629.0210)CWT8$85.00$85.00$85.00$85.00$85.00
99Seeding mixture no. 30 (630.0130)LB590$8.95$8.95$8.95$8.95$8.95
100Seeding borrow pit (630.0300)LB40$8.95$8.95$8.95$8.95$8.95
101Seed water (630.0500)MGAL290$10.00$10.00$10.00$10.00$10.00
102Markers culvert end (633.5200)EACH8$65.00$65.00$65.00$65.00$65.00
103Posts wood 4X6-inch X 16-FT (634.0616)EACH1$100.00$100.00$100.00$100.00$100.00
104Signs type II reflective F (637.2230)SF9$30.00$30.00$30.00$30.00$30.00
105Moving signs type II (638.2102)EACH2$150.00$150.00$150.00$150.00$150.00
106Removing signs type II (638.2602)EACH1$45.00$45.00$45.00$45.00$45.00
107Removing small sign supports (638.3000)EACH1$45.00$45.00$45.00$45.00$45.00
108Moving small sign supports (638.4000)EACH4$100.00$100.00$100.00$100.00$100.00
109Traffic control drums (643.0300)DAY15,700$0.32$0.32$0.32$0.35$0.32
110Traffic control barricades type III (643.0420)DAY2,564$0.70$0.70$0.70$0.65$0.70
111Traffic control warning lights type A (643.0705)DAY4,300$0.20$0.20$0.20$0.10$0.20
112Traffic control warning lights type C (643.0715)DAY3,241$0.30$0.30$0.30$0.10$0.30
113Traffic control arrow boards (643.0800)DAY404$4.25$4.25$4.25$15.00$4.25
114Connected arrow board (643.0810.S)DAY142$14.25$14.25$14.25$7.50$14.25
115Traffic control signs (643.0900)DAY4,958$0.45$0.45$0.45$0.50$0.45
116Traffic control covering signs type II (643.0920)EACH144$27.50$27.50$27.50$50.00$27.50
117Traffic control signs PCMS (643.1050)DAY279$28.00$28.00$28.00$25.00$28.00
118Connected work zone start and end location markers (643.1220.S)DAY252$5.55$5.55$5.55$7.75$5.55
119Traffic control (643.5000)EACH1$94,400$94,400$94,400$49,000$94,400
120Geotextile type DF schedule A (645.0111)SY104$4.00$2.40$2.40$10.00$5.00
121Geotextile type HR (645.0120)SY691$3.00$3.40$3.40$10.00$5.00
122Geotextile type R (645.0130)SY100$10.00$2.90$2.90$10.00$10.00
123Marking line epoxy 6-inch (646.2020)LF3,980$2.25$2.25$2.25$2.25$2.25
124Marking line same day epoxy 4- inch (646.4520)LF2,300$2.00$2.00$2.00$2.00$2.00
125Conduit rigid metallic 2-inch (652.0125)LF24$165.00$165.00$165.00$165.00$165.00
126Conduit rigid nonmetallic schedule 40 2-inch (652.0225)LF1,464$10.00$10.00$10.00$10.00$10.00
127Pull boxes non-conductive 24X42- inch (653.0164)EACH4$1,950.00$1,950.00$1,950.00$1,950.00$1,950.00
128Junction boxes 18X12X6-inch (653.0222)EACH1$1,950.00$1,950.00$1,950.00$1,950.00$1,950.00
129Concrete bases type 5 (654.0105)EACH5$1,750.00$1,750.00$1,750.00$1,750.00$1,750.00
130Sawing asphalt (690.0150)LF200$5.00$2.25$2.25$2.25$2.25
131Incentive strength concrete structures (715.0502)DOL4,650$1.00$1.00$1.00$1.00$1.00
132Incentive strength concrete barrier (715.0603)DOL112$1.00$1.00$1.00$1.00$1.00
133Incentive compressive strength concrete pavement (715.0720)DOL877$1.00$1.00$1.00$1.00$1.00
134On-the-job training apprentice at $5.00/HR (ASP.1T0A)HRS2,400$5.00$5.00$5.00$5.00$5.00
135On-the-job training graduate at $5.00/HR (ASP.1T0G)HRS2,100$5.00$5.00$5.00$5.00$5.00
136Special 01. HPC masonry structures (SPV.0035)CY576$900.00$550.00$850.00$550.00$1,000.00
137Special 01. existing footing opening (SPV.0060)EACH8$630.00$250.00$0.01$250.00$625.00
138Special 02. emergency response to traffic involving crash cushion temporary (SPV.0060)EACH5$0.01$360.00$360.00$425.00$360.00
139Special 03. emergency response to traffic involving concrete barrier temporary (SPV.0060)EACH5$0.01$360.01$360.00$0.01$2,800.00
140Special 04. construction staking survey project 1130-66-82 (SPV.0060)EACH1$14,900$14,900$14,900$14,900$14,900
141Special 05. decorative silhouette (SPV.0060)EACH10$5,080.00$3,750.00$5,000.00$3,750.00$1,600.00
142Special 06. concrete staining - excavation, grading, shaping, and finishing B-44-330 (SPV.0060)EACH1$12,200$13,000$10,000$25,000$20,000
143Special 07. concrete staining - excavation, grading, shaping, and finishing B-44-331 (SPV.0060)EACH1$12,200$13,000$10,000$25,000$20,000
144Special 08. concrete staining - excavation, grading, shaping, and finishing B-44-179 (SPV.0060)EACH1$12,200$13,000$10,000$25,000$25,000
145Special 09. concrete staining - excavation, grading, shaping, and finishing B-44-333 (SPV.0060)EACH1$12,200$13,000$10,000$25,000$20,000
146Special 10. concrete staining - excavation, grading, shaping, and finishing B-44-338 (SPV.0060)EACH1$12,200$13,000$10,000$25,000$20,000
147Special 11. concrete staining - excavation, grading, shaping, and finishing R-44-50 (SPV.0060)EACH1$12,400$13,000$10,000$25,000$16,000
148Special 12. concrete staining - excavation, grading, shaping, and finishing R-44-51 (SPV.0060)EACH1$12,400$13,000$10,000$25,000$16,000
149Special 01. street sweeping (SPV.0075)HRS30$0.01$200.00$500.00$300.00$180.00
150Special 01. removing existing bridge chain link fencing (SPV.0090)LF493$26.25$20.00$20.00$20.00$20.00
151Special 02. fence chain link polymer-coated 6-FT. B-44-179 special (SPV.0090)LF493$135.00$105.00$102.00$105.00$105.00
152Special 01. longitudinal grooving bridge deck (SPV.0165)SF7,434$1.33$1.06$1.33$1.33$1.06
153Special 02. wall concrete panel mechanically stabilized earth R-44- 57 (SPV.0165)SF4,483$60.99$120.00$120.00$134.00$130.00
154Special 03. tinted sealer reseal (SPV.0165)SF9,542$2.26$2.26$2.26$2.26$2.26
WisDOT contract 20251014008: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.

Every contract let that day: WisDOT letting of October 14, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy