WisDOT contract 20251014014 bid tabulation

C Wausau, West Wausau Avenue; Stevens Drive to North 10th Avenue (LOC STR, Marathon County C Wausau, West Wausau Avenue). Let by Wisconsin DOT on October 14, 2025, Marathon. 6 bids received; low bid $1,208,153 by James Peterson Sons, Inc..

Owner
Wisconsin DOT
Letting
14 OCT 2025
Pay items
128
Data through
10 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1James Peterson Sons, Inc.$1,208,153Low
2A-1 Excavating LLC$1,232,109+2.0%
3Haas Sons, Inc.$1,284,959+6.0%
4S & N Incorporated$1,358,574+12%
5Pember Companies, Inc.$1,407,299+16%
6Integrity Grading and Excavating, Inc.$1,559,419+29%
WisDOT contract 20251014014: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. James Peterson Sons, Inc.2. A-1 Excavating LLC3. Haas Sons, Inc.4. S & N Incorporated5. Pember Companies, Inc.6. Integrity Grading and Excavating, Inc.
1Clearing (201.0120)ID12$50.00$5.00$60.00$30.00$47.30$40.00
2Grubbing (201.0220)ID12$50.00$25.00$60.00$30.00$26.70$0.01
3Removing concrete pavement (204.0100)SY7,220$4.59$6.00$6.60$7.10$10.70$5.68
4Removing curb & gutter (204.0150)LF275$5.00$4.00$10.00$3.00$5.65$8.65
5Removing concrete sidewalk (204.0155)SY1,080$3.50$6.00$4.00$5.70$8.20$3.50
6Removing inlets (204.0220)EACH4$400.00$500.00$750.00$450.00$675.00$1,350.00
7Removing storm sewer (size) 01. 12-inch (204.0245)LF63$30.00$20.00$30.00$15.00$18.55$47.70
8Removing storm sewer (size) 02. 24-inch (204.0245)LF36$30.00$25.00$30.00$15.00$27.00$47.25
9Removing (item description) 01. hydrants (204.9060.S)EACH1$997.92$400.00$500.00$500.00$855.00$1,768.00
10Removing (item description) 02. sanitary manholes (204.9060.S)EACH7$500.00$600.00$650.00$500.00$960.00$1,350.00
11Removing (item description) 01. sanitary sewer 8-inch (204.9090.S)LF90$25.49$3.00$5.00$10.00$5.60$13.15
12Removing (item description) 02. sanitary sewer 10-inch (204.9090.S)LF30$25.49$3.00$5.00$10.00$8.40$18.15
13Removing (item description) 03. sanitary sewer 12-inch (204.9090.S)LF1,414$2.00$3.00$5.00$8.00$5.70$11.95
14Removing (item description) 04. water main 6-inch (204.9090.S)LF199$3.26$3.00$6.00$8.00$10.10$12.95
15Removing (item description) 05. water main 8-inch (204.9090.S)LF1,296$3.08$3.00$6.00$8.00$7.80$12.00
16Excavation common (205.0100)CY3,797$13.65$15.00$14.67$17.10$17.80$18.00
17Finishing roadway (project) 01. 6999-00-76 (213.0100)EACH1$2,000.00$500.00$1.00$1,200.00$500.00$500.00
18Base aggregate dense 1 1/4-inch (305.0120)TON5,000$19.73$19.00$16.81$18.15$24.10$18.00
19Tack coat (455.0605)GAL300$4.42$5.50$4.42$4.42$4.65$4.42
20Incentive density HMA pavement (460.2000)DOL850$1.00$1.00$1.00$1.00$1.00$1.00
21HMA pavement 3 LT 58-28 S (460.5223)TON745$93.28$94.00$99.99$93.28$97.95$93.28
22HMA pavement 4 LT 58-28 S (460.5224)TON580$104.18$105.00$104.18$104.18$109.40$104.18
23Asphaltic surface patching (465.0110)TON5$350.72$371.00$350.72$350.72$368.25$350.72
24Asphaltic surface driveways and field entrances (465.0120)TON45$252.18$263.00$252.18$252.18$264.80$252.18
25Concrete collars for pipe (520.8000)EACH1$800.00$1,000.00$1,500.00$950.00$1,440.00$760.00
26Concrete curb & gutter 30-inch type D (601.0411)LF2,680$21.68$22.20$17.00$19.35$17.00$21.68
27Concrete sidewalk 6-inch (602.0415)SF12,100$6.79$7.30$7.90$8.85$7.90$6.79
28Curb ramp detectable warning field natural patina (602.0515)SF136$50.25$51.25$62.00$60.32$62.00$50.25
29Concrete driveway 6-inch (602.0810)SY90$61.91$67.00$74.60$80.51$74.60$61.91
30Concrete driveway hes 6-inch (602.0860)SY415$64.01$68.00$85.00$81.79$85.00$64.01
31Storm sewer pipe reinforced concrete class III 12-inch (608.0312)LF86$111.92$95.00$118.50$117.28$85.00$431.00
32Storm sewer pipe reinforced concrete class III 24-inch (608.0324)LF36$149.98$135.00$146.00$152.49$125.60$209.00
33Reconstructing manholes (611.0420)EACH3$660.79$1,300.00$3,000.00$1,800.00$1,300.00$1,518.00
34Manhole covers type J-special (611.0535)EACH5$1,333.98$950.00$1,125.00$1,136.00$1,470.00$725.00
35Inlet covers type H (611.0624)EACH6$1,644.78$1,200.00$1,725.00$1,343.00$985.00$970.00
36Inlets 4-FT diameter (611.3004)EACH1$3,612.08$4,100.00$3,500.00$2,798.00$4,105.00$5,368.00
37Inlets 2X3-FT (611.3230)EACH5$2,119.60$2,740.00$2,500.00$1,942.00$2,735.00$5,295.00
38Adjusting inlet covers (611.8115)EACH1$792.66$450.00$1,150.00$700.00$840.00$500.00
39Insulation board polystyrene (inch) 01. 2-inch (612.0902.S)SY28$27.00$28.00$27.00$30.00$51.40$13.98
40Mobilization (619.1000)EACH1$95,454$98,240$59,530$99,979$89,725$154,000
41Landmark reference monuments (621.0100)EACH4$100.00$150.00$100.00$100.00$105.00$100.00
42Water (624.0100)MGAL50$40.00$30.00$60.00$45.00$93.00$44.00
43Topsoil (625.0100)SY2,900$8.86$5.00$8.40$7.75$10.25$3.75
44Silt fence (628.1504)LF480$6.00$6.20$6.00$6.00$2.45$6.00
45Silt fence maintenance (628.1520)LF480$0.01$0.05$0.01$0.01$0.08$0.01
46Mobilizations erosion control (628.1905)EACH4$750.00$800.00$750.00$750.00$445.00$750.00
47Mobilizations emergency erosion control (628.1910)EACH4$1.00$51.00$1.00$1.00$370.00$1.00
48Erosion mat urban class I type A (628.2006)SY2,900$2.50$2.60$2.50$2.50$2.45$2.50
49Inlet protection type A (628.7005)EACH9$125.00$140.00$125.00$125.00$112.40$125.00
50Inlet protection type C (628.7015)EACH10$75.00$90.00$75.00$75.00$76.40$75.00
51Inlet protection type D (628.7020)EACH5$125.00$140.00$125.00$125.00$148.50$125.00
52Seeding mixture no. 40 (630.0140)LB55$12.00$14.00$12.00$12.00$14.65$12.00
53Seed water (630.0500)MGAL65$50.00$51.00$50.00$50.00$1.05$50.00
54Posts tubular steel 2X2-inch X 14- FT (634.0814)EACH13$300.00$310.00$300.00$300.00$260.00$300.00
55Posts tubular steel 2X2-inch X 16- FT (634.0816)EACH2$300.00$310.00$300.00$300.00$265.00$300.00
56Signs type II reflective H (637.2210)SF49.79$50.00$53.00$50.00$50.00$30.20$50.00
57Signs type II reflective SH (637.2220)SF13.25$50.00$53.00$50.00$50.00$29.70$50.00
58Signs type II reflective F (637.2230)SF2.75$50.00$53.00$50.00$50.00$29.70$50.00
59Moving signs type II (638.2102)EACH3$150.00$160.00$150.00$150.00$126.25$150.00
60Removing signs type II (638.2602)EACH17$50.00$60.00$50.00$50.00$43.50$50.00
61Removing small sign supports (638.3000)EACH14$50.00$60.00$50.00$50.00$36.40$50.00
62Field office type B (642.5001)EACH1$9,668.75$7,000.00$20,000$9,000.00$9,400.00$12,500
63Traffic control drums (643.0300)DAY600$0.50$0.60$0.50$0.50$0.55$0.50
64Traffic control barricades type III (643.0420)DAY1,500$0.50$0.60$0.50$0.50$0.55$0.50
65Traffic control warning lights type A (643.0705)DAY1,875$0.10$0.20$0.10$0.10$0.10$0.10
66Traffic control signs (643.0900)DAY2,040$0.50$0.60$0.50$0.50$0.55$0.50
67Temporary marking line removable tape 4-inch (643.3150)LF850$0.85$1.30$0.85$0.85$0.90$0.85
68Temporary marking line removable tape 6-inch (643.3180)LF230$1.65$3.00$1.65$1.65$1.75$1.65
69Traffic control (643.5000)EACH1$1,675.00$4,175.00$1,675.00$1,675.00$4,635.00$1,675.00
70Temporary pedestrian surface plate (644.1430)SF110$8.00$10.00$125.00$12.00$10.60$8.00
71Temporary pedestrian surface matting (644.1440)SF1,050$5.00$5.50$5.00$5.00$5.30$5.00
72Temporary pedestrian curb ramp (644.1601)DAY130$5.00$7.00$5.00$5.00$5.30$5.00
73Temporary pedestrian detectable warning field (644.1605)SF64$5.00$7.00$5.00$5.00$5.30$5.00
74Temporary pedestrian barricade (644.1810)LF880$4.50$5.00$4.50$4.50$4.80$4.50
75Marking line epoxy 4-inch (646.1020)LF3,770$1.05$1.10$1.05$1.28$1.10$1.05
76Marking line epoxy 8-inch (646.3020)LF110$1.28$1.80$1.28$2.10$1.35$1.28
77Marking arrow epoxy (646.5020)EACH1$310.00$335.00$310.00$265.00$330.00$310.00
78Marking word epoxy (646.5120)EACH1$325.00$350.00$325.00$270.00$345.00$325.00
79Marking stop line epoxy 18-inch (646.6120)LF85$16.15$18.00$16.15$21.00$17.15$16.15
80Marking diagonal epoxy 12-inch (646.7120)LF50$14.80$16.00$14.80$18.00$15.70$14.80
81Marking crosswalk epoxy transverse line 6-inch (646.7420)LF350$10.50$11.00$10.50$14.00$11.15$10.50
82Marking removal line 4-inch (646.9000)LF730$0.85$1.00$0.85$0.85$0.90$0.85
83Marking removal line 6-inch (646.9002)LF190$0.95$1.00$0.95$0.95$1.00$0.95
84Marking removal line 8-inch (646.9100)LF110$1.90$2.50$1.90$1.90$2.00$1.90
85Marking removal line wide (646.9200)LF95$2.50$3.00$2.50$2.50$2.65$2.50
86Marking removal special marking (646.9300)EACH2$60.00$85.00$60.00$60.00$65.00$60.00
87Construction staking storm sewer (650.4000)EACH6$120.00$145.00$120.00$120.00$125.00$120.00
88Construction staking subgrade (650.4500)LF1,474$0.01$0.01$1.00$0.50$0.10$0.01
89Construction staking base (650.5000)LF1,474$1.00$1.20$1.00$1.00$1.05$1.00
90Construction staking curb gutter and curb & gutter (650.5500)LF3,130$0.80$0.90$0.80$0.80$0.90$0.80
91Construction staking curb ramps (650.9000)EACH10$250.00$260.00$250.00$250.00$265.00$250.00
92Construction staking sidewalk (project) 01. 6999-00-76 (650.9500)EACH1$250.00$500.00$250.00$250.00$265.00$250.00
93Construction staking supplemental control (project) 01. 6999-00-76 (650.9911)EACH1$1,094.11$1,345.00$1,094.11$1,094.11$1,160.00$1,094.11
94Construction staking slope stakes (650.9920)LF1,474$1.25$1.50$1.25$1.25$1.35$1.25
95Sawing asphalt (690.0150)LF305$1.75$4.00$1.75$3.75$3.40$1.75
96Sawing concrete (690.0250)LF330$2.35$6.00$2.35$4.35$5.90$2.35
97On-the-job training apprentice at $5.00/HR (ASP.1T0A)HRS1,200$5.00$5.00$5.00$5.00$5.00$5.00
98On-the-job training graduate at $5.00/HR (ASP.1T0G)HRS600$5.00$5.00$5.00$5.00$5.00$5.00
99Special 01. fertilizer for lawn type turf (SPV.0030)CWT2$300.00$350.00$300.00$300.00$132.60$300.00
100Special 01. research and locate existing land parcel monuments (SPV.0060)EACH7$69.77$80.00$69.77$69.77$74.00$69.77
101Special 02. verify and replace existing land parcel monuments (SPV.0060)EACH7$95.00$105.00$95.00$95.00$101.00$95.00
102Special 03. reestablish section corner monuments (SPV.0060)EACH1$500.00$600.00$500.00$500.00$530.00$500.00
103Special 05. temporary water service (SPV.0060)EACH1$28,007$9,000.00$9,000.00$23,500$5,000.00$22,400
104Special 06. connecting water main (SPV.0060)EACH6$2,329.62$2,200.00$2,050.00$1,915.88$2,470.00$8,200.00
105Special 07. 8X8X6-inch tee (SPV.0060)EACH5$681.57$1,030.00$1,150.00$805.96$1,050.00$553.53
106Special 08. 8-inch 45 degree bend (SPV.0060)EACH4$460.23$750.00$950.00$578.33$810.00$373.75
107Special 09. 6-inch valve & valve box (SPV.0060)EACH5$2,499.56$2,430.00$2,900.00$2,453.92$2,765.00$2,030.09
108Special 10. 8-inch valve & valve box (SPV.0060)EACH3$3,469.41$3,270.00$3,700.00$3,299.80$3,650.00$2,817.77
109Special 11. standard hydrant (SPV.0060)EACH2$6,743.59$6,550.00$6,800.00$7,191.50$7,000.00$7,500.00
110Special 12. connecting sanitary sewer (SPV.0060)EACH4$2,121.15$1,800.00$1,000.00$1,719.78$1,650.00$5,375.00
111Special 13. sanitary manhole covers type J-special (SPV.0060)EACH5$1,221.54$1,275.00$1,525.00$1,398.54$1,050.00$725.00
112Special 14. manholes sanitary 4-FT diameter (SPV.0060)EACH5$5,120.95$5,850.00$4,800.00$5,723.40$5,580.00$6,880.00
113Special 15. sanitary sewer PVC wyes (SPV.0060)EACH8$495.20$700.00$1,075.00$721.88$805.00$358.67
114Special 16. 6-inch 45 degree bend (SPV.0060)EACH6$344.26$540.00$800.00$460.40$685.00$279.60
115Special 17. construction staking water main (6999-00-76) (SPV.0060)EACH1$1,100.00$1,600.00$1,100.00$1,100.00$1,165.00$1,100.00
116Special 18. construction staking sanitary sewer (6999-00-76) (SPV.0060)EACH1$1,100.00$1,600.00$1,100.00$1,100.00$1,165.00$1,100.00
117Special 01. concrete curb & gutter 24-inch type D (SPV.0090)LF60$79.32$83.00$44.75$71.30$44.75$79.32
118Special 02. concrete curb & gutter 12-inch sloped 24-inch type D (SPV.0090)LF30$79.35$83.02$59.00$71.30$59.00$79.35
119Special 03. concrete curb & gutter hes 30-inch type D (SPV.0090)LF360$51.47$54.00$41.00$31.29$41.00$51.47
120Special 04. 6-inch DI water main (SPV.0090)LF135$99.44$88.00$102.00$95.74$120.00$106.00
121Special 05. 8-inch DI water main (SPV.0090)LF1,406$75.51$78.00$85.00$97.49$100.00$103.25
122Special 06. water laterals (SPV.0090)LF234$73.31$81.00$102.00$73.28$82.50$102.00
123Special 07. sanitary sewer 8-inch (SPV.0090)LF30$81.57$90.00$92.00$112.46$177.00$550.50
124Special 08. sanitary sewer 10-inch (SPV.0090)LF30$87.18$97.00$96.00$117.97$134.00$555.75
125Special 09. sanitary sewer 12-inch (SPV.0090)LF1,413$63.60$66.00$89.00$102.91$96.50$115.00
126Special 10. sanitary sewer laterals (SPV.0090)LF287$54.12$57.00$77.00$51.82$66.85$119.00
127Special 11. polyethylene encasement (SPV.0090)LF1,541$0.47$3.00$2.50$1.44$1.15$0.38
128Special 01. preparing topsoil for lawn type turf (SPV.0180)SY2,900$1.00$1.20$1.00$1.00$2.10$1.00
WisDOT contract 20251014014: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.

Every contract let that day: WisDOT letting of October 14, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy