WisDOT contract 20251014015 bid tabulation
1530-01-76. Let by Wisconsin DOT on October 14, 2025, Pierce. 5 bids received; low bid $2,145,292 by Lunda Construction Company.
- Owner
- Wisconsin DOT
- Letting
- 14 OCT 2025
- Pay items
- 97
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Lunda Construction Company | $2,145,292 | Low |
| 2 | A-1 Excavating LLC | $2,289,436 | +7.0% |
| 3 | Sheet Piling Services LLC | $2,393,506 | +12% |
| 4 | Pember Companies, Inc. | $2,427,670 | +13% |
| 5 | Janke General Contractors, Inc. | $2,905,455 | +35% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Lunda Construction Company | 2. A-1 Excavating LLC | 3. Sheet Piling Services LLC | 4. Pember Companies, Inc. | 5. Janke General Contractors, Inc. |
|---|---|---|---|---|---|---|---|---|
| 1 | Clearing (201.0105) | STA | 3 | $480.00 | $2,000.00 | $480.00 | $1,500.00 | $250.00 |
| 2 | Grubbing (201.0205) | STA | 3 | $360.00 | $1,200.00 | $360.00 | $750.00 | $1,250.00 |
| 3 | Removing structure (structure) 01. C-47-242 (203.0220) | EACH | 1 | $9,850.00 | $40,000 | $34,850 | $24,000 | $20,000 |
| 4 | Removing structure (structure) 02. C-47-236 (203.0220) | EACH | 1 | $2,465.00 | $38,000 | $27,465 | $7,500.00 | $6,500.00 |
| 5 | Removing structure (structure) 03. C-47-02 (203.0220) | EACH | 1 | $6,570.00 | $20,000 | $31,570 | $20,725 | $20,000 |
| 6 | Removing structure (structure) 04. C-47-05 (203.0220) | EACH | 1 | $6,570.00 | $25,000 | $31,570 | $18,900 | $20,000 |
| 7 | Removing guardrail (204.0165) | LF | 1,056 | $3.30 | $5.00 | $3.30 | $5.20 | $4.90 |
| 8 | Removing fence (204.0170) | LF | 113 | $3.20 | $3.30 | $3.20 | $3.30 | $3.10 |
| 9 | Excavation common (205.0100) | CY | 86 | $18.00 | $40.00 | $18.00 | $30.70 | $30.00 |
| 10 | Excavation for structures culverts (structure) 01. C-47-62 (206.2001) | EACH | 1 | $20,610 | $69,000 | $120,610 | $26,680 | $121,000 |
| 11 | Excavation for structures culverts (structure) 02. C-47-236 (206.2001) | EACH | 1 | $5,480.00 | $11,000 | $55,480 | $9,365.00 | $18,000 |
| 12 | Excavation for structures culverts (structure) 03. C-47-63 (206.2001) | EACH | 1 | $51,965 | $72,000 | $151,695 | $96,575 | $136,000 |
| 13 | Excavation for structures culverts (structure) 04. C-47-65 (206.2001) | EACH | 1 | $50,955 | $96,000 | $150,955 | $80,000 | $165,000 |
| 14 | Cofferdams (structure) 01. C-47-236 (206.5001) | EACH | 1 | $15,000 | $17,000 | $45,000 | $12,600 | $32,000 |
| 15 | Borrow (208.0100) | CY | 3,093 | $13.55 | $1.00 | $13.55 | $21.20 | $16.00 |
| 16 | Backfill structure type B (210.2500) | TON | 6,380 | $17.80 | $19.00 | $17.80 | $25.00 | $23.00 |
| 17 | Prepare foundation for asphaltic paving (project) 01. 1530-01-76 (211.0101) | EACH | 1 | $750.00 | $10,000 | $750.00 | $500.00 | $9,000.00 |
| 18 | Finishing roadway (project) 01. 1530-01-76 (213.0100) | EACH | 1 | $720.00 | $2,000.00 | $720.00 | $500.00 | $350.00 |
| 19 | Finishing roadway (project) 02. 1540-00-73 (213.0100) | EACH | 1 | $720.00 | $2,000.00 | $720.00 | $500.00 | $350.00 |
| 20 | Base aggregate dense 3/4-inch (305.0110) | TON | 135 | $44.05 | $36.00 | $44.05 | $55.05 | $60.00 |
| 21 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 1,231 | $27.10 | $24.00 | $27.10 | $29.80 | $35.00 |
| 22 | Breaker run (311.0115) | CY | 240 | $42.40 | $55.00 | $42.40 | $87.65 | $35.00 |
| 23 | Tack coat (455.0605) | GAL | 387 | $11.17 | $11.50 | $11.17 | $11.75 | $11.17 |
| 24 | Incentive density HMA pavement (460.2000) | DOL | 671 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 25 | HMA pavement 4 MT 58-34 S (460.6244) | TON | 671 | $196.74 | $207.00 | $196.74 | $206.60 | $196.74 |
| 26 | Asphaltic surface temporary (465.0125) | TON | 75 | $191.53 | $202.00 | $191.53 | $247.70 | $191.53 |
| 27 | Asphaltic rumble strips, shoulder (465.0520) | LF | 120 | $10.00 | $11.00 | $10.00 | $10.60 | $10.00 |
| 28 | Concrete masonry culverts (504.0100) | CY | 606 | $800.00 | $1,234.00 | $950.00 | $1,525.00 | $1,200.00 |
| 29 | Bar steel reinforcement HS structures (505.0400) | LB | 77,340 | $1.65 | $1.70 | $1.50 | $1.05 | $2.00 |
| 30 | Bar steel reinforcement HS coated structures (505.0600) | LB | 20,120 | $1.65 | $1.70 | $1.65 | $1.65 | $2.30 |
| 31 | Temporary shoring (structure) 01. C-47-62 (511.1200) | SF | 460 | $50.00 | $55.00 | $75.00 | $50.00 | $60.00 |
| 32 | Temporary shoring (structure) 02. C-47-236 (511.1200) | SF | 1,200 | $60.00 | $55.00 | $75.00 | $30.15 | $60.00 |
| 33 | Rubberized membrane waterproofing (516.0500) | SY | 117 | $25.00 | $30.00 | $18.00 | $147.00 | $45.00 |
| 34 | Concrete barrier temporary precast delivered (603.8000) | LF | 375 | $15.00 | $16.00 | $15.96 | $28.00 | $75.00 |
| 35 | Concrete barrier temporary precast installed (603.8125) | LF | 1,025 | $12.00 | $15.00 | $14.67 | $6.30 | $5.00 |
| 36 | Anchoring concrete barrier temporary precast (603.8500) | LF | 1,025 | $10.00 | $12.00 | $11.25 | $13.25 | $3.00 |
| 37 | Riprap heavy (606.0300) | CY | 276 | $98.30 | $81.00 | $98.30 | $93.60 | $87.00 |
| 38 | Steel plate beam guard over low- fill culverts class A (614.0340) | LF | 100 | $40.35 | $51.00 | $40.35 | $50.90 | $48.00 |
| 39 | Guardrail mow strip emulsified asphalt (614.0397) | SY | 98 | $18.00 | $40.00 | $18.00 | $47.25 | $22.00 |
| 40 | Crash cushions temporary (614.0905) | EACH | 2 | $3,440.54 | $5,000.00 | $4,750.00 | $3,650.00 | $4,000.00 |
| 41 | Replacing guardrail posts and blocks (614.0950) | EACH | 19 | $130.00 | $130.00 | $130.00 | $132.00 | $124.00 |
| 42 | MGS guardrail 3 K (614.2330) | LF | 112.50 | $42.35 | $43.00 | $42.35 | $43.50 | $41.00 |
| 43 | MGS guardrail terminal eat (614.2610) | EACH | 2 | $3,715.00 | $4,035.00 | $3,715.00 | $4,070.00 | $3,835.00 |
| 44 | Fence woven wire (height) 01. 4 FT (616.0100) | LF | 273 | $14.95 | $9.45 | $14.95 | $9.55 | $9.00 |
| 45 | Maintenance and repair of haul roads (project) 01. 1530-01-76 (618.0100) | EACH | 1 | $0.01 | $1,000.00 | $0.01 | $500.00 | $350.00 |
| 46 | Maintenance and repair of haul roads (project) 02. 1540-00-73 (618.0100) | EACH | 1 | $0.01 | $1,000.00 | $0.01 | $500.00 | $350.00 |
| 47 | Mobilization (619.1000) | EACH | 1 | $616,095 | $246,120 | $258,441 | $127,580 | $200,000 |
| 48 | Water (624.0100) | MGAL | 23 | $37.00 | $50.00 | $37.00 | $140.00 | $10.00 |
| 49 | Topsoil (625.0100) | SY | 2,625 | $1.50 | $6.00 | $1.50 | $10.00 | $6.00 |
| 50 | Silt fence (628.1504) | LF | 1,591 | $2.30 | $2.50 | $2.30 | $2.45 | $2.30 |
| 51 | Silt fence maintenance (628.1520) | LF | 1,591 | $0.01 | $0.08 | $0.01 | $0.08 | $0.08 |
| 52 | Mobilizations erosion control (628.1905) | EACH | 9 | $180.00 | $440.00 | $180.00 | $445.00 | $420.00 |
| 53 | Mobilizations emergency erosion control (628.1910) | EACH | 4 | $120.00 | $370.00 | $120.00 | $370.00 | $350.00 |
| 54 | Erosion mat class I type B (628.2004) | SY | 2,625 | $1.65 | $1.80 | $1.65 | $1.80 | $1.70 |
| 55 | Culvert pipe checks (628.7555) | EACH | 138 | $15.00 | $23.00 | $15.00 | $22.60 | $21.30 |
| 56 | Rock bags (628.7570) | EACH | 68 | $15.00 | $15.00 | $15.00 | $14.90 | $14.00 |
| 57 | Fertilizer type B (629.0210) | CWT | 1.70 | $150.00 | $115.00 | $150.00 | $116.65 | $110.00 |
| 58 | Seeding mixture no. 20 (630.0120) | LB | 117 | $9.95 | $9.50 | $9.95 | $9.30 | $8.75 |
| 59 | Seeding temporary (630.0200) | LB | 70 | $3.00 | $3.75 | $3.00 | $3.75 | $3.55 |
| 60 | Seed water (630.0500) | MGAL | 57 | $12.00 | $26.25 | $12.00 | $26.50 | $25.00 |
| 61 | Markers culvert end (633.5200) | EACH | 7 | $77.35 | $75.00 | $77.35 | $75.35 | $71.00 |
| 62 | Field office type B (642.5001) | EACH | 1 | $6,000.00 | $9,000.00 | $6,500.00 | $9,500.00 | $2,500.00 |
| 63 | Traffic control drums (643.0300) | DAY | 1,811 | $0.53 | $1.10 | $0.53 | $0.55 | $1.00 |
| 64 | Traffic control barricades type III (643.0420) | DAY | 275 | $1.46 | $1.10 | $1.46 | $1.55 | $1.00 |
| 65 | Traffic control warning lights type A (643.0705) | DAY | 550 | $0.86 | $0.15 | $0.86 | $0.90 | $0.10 |
| 66 | Traffic control warning lights type C (643.0715) | DAY | 1,275 | $0.38 | $0.15 | $0.38 | $0.40 | $0.10 |
| 67 | Traffic control signs (643.0900) | DAY | 12,100 | $0.38 | $1.10 | $0.38 | $0.40 | $1.00 |
| 68 | Traffic control covering signs type I (643.0910) | EACH | 2 | $154.72 | $630.00 | $154.72 | $165.00 | $600.00 |
| 69 | Traffic control covering signs type II (643.0920) | EACH | 9 | $51.65 | $22.00 | $51.65 | $55.00 | $20.00 |
| 70 | Traffic control signs PCMS (643.1050) | DAY | 28 | $69.88 | $80.00 | $69.88 | $74.10 | $75.00 |
| 71 | Temporary marking line removable tape 6-inch (643.3180) | LF | 2,478 | $2.53 | $2.00 | $2.53 | $2.70 | $1.69 |
| 72 | Temporary marking stop line removable tape 18-inch (643.3850) | LF | 72 | $6.51 | $6.00 | $6.51 | $6.90 | $5.07 |
| 73 | Traffic control (643.5000) | EACH | 1 | $9,949.14 | $9,191.00 | $9,949.14 | $22,600 | $9,191.00 |
| 74 | Geotextile type C (645.0105) | SY | 650 | $3.15 | $4.00 | $3.15 | $3.90 | $4.00 |
| 75 | Geotextile type HR (645.0120) | SY | 554 | $3.65 | $5.00 | $3.65 | $6.15 | $4.00 |
| 76 | Marking line epoxy 6-inch (646.2020) | LF | 1,792 | $5.01 | $3.20 | $3.00 | $5.30 | $5.01 |
| 77 | Marking line grooved wet ref epoxy 6-inch (646.2040) | LF | 832 | $7.50 | $6.00 | $5.50 | $7.95 | $7.50 |
| 78 | Marking removal line 6-inch (646.9002) | LF | 1,248 | $1.20 | $1.00 | $1.20 | $1.30 | $0.90 |
| 79 | Construction staking subgrade (650.4500) | LF | 360 | $0.01 | $0.01 | $0.01 | $0.01 | $0.01 |
| 80 | Construction staking base (650.5000) | LF | 360 | $0.85 | $0.01 | $0.01 | $0.01 | $0.01 |
| 81 | Construction staking structure layout (structure) 01. C-47-62 (650.6501) | EACH | 1 | $1,750.00 | $2,200.00 | $2,500.00 | $2,120.00 | $2,000.00 |
| 82 | Construction staking structure layout (structure) 02. C-47-236 (650.6501) | EACH | 1 | $1,750.00 | $1,500.00 | $900.80 | $1,430.00 | $1,350.00 |
| 83 | Construction staking structure layout (structure) 03. C-47-63 (650.6501) | EACH | 1 | $1,750.00 | $2,200.00 | $2,000.00 | $2,120.00 | $2,000.00 |
| 84 | Construction staking structure layout (structure) 04. C-47-65 (650.6501) | EACH | 1 | $1,750.00 | $2,200.00 | $2,229.00 | $2,120.00 | $2,000.00 |
| 85 | Construction staking supplemental control (project) 01. 1530-01-76 (650.9911) | EACH | 1 | $1,500.00 | $1,200.00 | $1,800.00 | $1,060.00 | $1,000.00 |
| 86 | Construction staking supplemental control (project) 02. 1540-00-73 (650.9911) | EACH | 1 | $1,500.00 | $1,200.00 | $1,800.00 | $1,060.00 | $1,000.00 |
| 87 | Construction staking slope stakes (650.9920) | LF | 463 | $1.00 | $0.01 | $1.00 | $0.01 | $0.01 |
| 88 | Temporary traffic signals for bridges (structure) 01. C-47-62 (661.0101) | EACH | 1 | $6,619.19 | $15,000 | $6,619.00 | $7,020.00 | $5,700.00 |
| 89 | Sawing asphalt (690.0150) | LF | 769 | $2.25 | $3.00 | $2.25 | $3.65 | $2.45 |
| 90 | Incentive strength concrete structures (715.0502) | DOL | 3,640 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 91 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 150 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 |
| 92 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 150 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 |
| 93 | Special 01. cleaning end treatment (SPV.0060) | EACH | 1 | $900.00 | $3,500.00 | $900.00 | $1,725.00 | $1,500.00 |
| 94 | Special 01. temporary box culvert water diversion structure C-47-62 (SPV.0060) | EACH | 1 | $20,000 | $40,000 | $25,000 | $56,500 | $164,000 |
| 95 | Special 02. temporary box culvert water diversion structure C-47-63 (SPV.0060) | EACH | 1 | $20,000 | $4,000.00 | $25,000 | $57,000 | $164,000 |
| 96 | Special 03. temporary box culvert water diversion structure C-47-65 (SPV.0060) | EACH | 1 | $20,000 | $4,000.00 | $25,000 | $58,125 | $164,000 |
| 97 | Special 01. salvage and reinstall guardrail (SPV.0090) | LF | 120 | $22.60 | $25.00 | $22.60 | $23.35 | $22.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of October 14, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.