WisDOT contract 20251014017 bid tabulation
Abbotsford - Medford; Porky Creek B-10-0250 & B-10-0251 (STH 013, Clark County Abbotsford - Medford). Let by Wisconsin DOT on October 14, 2025, Clark. 4 bids received; low bid $1,555,281 by A-1 Excavating LLC.
- Owner
- Wisconsin DOT
- Letting
- 14 OCT 2025
- Pay items
- 76
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | A-1 Excavating LLC | $1,555,281 | Low |
| 2 | Earth, Inc. | $1,558,366 | 0.0% |
| 3 | Janke General Contractors, Inc. | $1,663,990 | +7.0% |
| 4 | Pember Companies, Inc. | $1,794,876 | +15% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. A-1 Excavating LLC | 2. Earth, Inc. | 3. Janke General Contractors, Inc. | 4. Pember Companies, Inc. |
|---|---|---|---|---|---|---|---|
| 1 | Removing small pipe culverts (203.0100) | EACH | 1 | $1,800.00 | $1,000.00 | $18,000 | $7,220.00 |
| 2 | Removing structure (structure) 01. B-10-240 (203.0220) | EACH | 1 | $15,000 | $25,000 | $18,000 | $15,400 |
| 3 | Removing structure (structure) 02. B-10-241 (203.0220) | EACH | 1 | $17,000 | $25,000 | $18,000 | $12,000 |
| 4 | Removing asphaltic surface (204.0110) | SY | 890 | $7.00 | $6.00 | $7.00 | $10.10 |
| 5 | Excavation for structures culverts (structure) 01. B-10-251 (206.2001) | EACH | 1 | $55,000 | $25,000 | $57,000 | $48,650 |
| 6 | Backfill structure type B (210.2500) | TON | 1,840 | $1.00 | $30.00 | $23.00 | $33.80 |
| 7 | Prepare foundation for asphaltic paving (project) 01. 1610-02-73 (211.0101) | EACH | 1 | $12,000 | $8,000.00 | $17,000 | $3,990.00 |
| 8 | Finishing roadway (project) 01. 1610-02-73 (213.0100) | EACH | 1 | $2,300.00 | $5,000.00 | $350.00 | $500.00 |
| 9 | Base aggregate dense 3/4-inch (305.0110) | TON | 78 | $49.00 | $35.00 | $47.00 | $55.50 |
| 10 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 742 | $31.00 | $30.00 | $28.00 | $26.90 |
| 11 | Shaping shoulders (305.0500) | STA | 14 | $260.00 | $150.00 | $300.00 | $465.00 |
| 12 | Base aggregate open-graded (310.0110) | TON | 130 | $32.00 | $60.00 | $35.00 | $76.10 |
| 13 | Select crushed material (312.0110) | TON | 390 | $32.00 | $40.00 | $30.00 | $63.65 |
| 14 | Subbase 10-inch (350.0135) | SY | 890 | $16.00 | $10.00 | $15.00 | $13.80 |
| 15 | Tack coat (455.0605) | GAL | 178 | $11.00 | $9.20 | $9.20 | $9.75 |
| 16 | Asphaltic surface (465.0105) | TON | 374 | $176.00 | $158.00 | $152.80 | $162.05 |
| 17 | Asphaltic surface temporary (465.0125) | TON | 118 | $156.00 | $148.00 | $135.40 | $183.35 |
| 18 | Concrete masonry culverts (504.0100) | CY | 293 | $1,400.00 | $1,100.00 | $1,100.00 | $1,353.00 |
| 19 | Concrete masonry endwalls (504.0900) | CY | 19 | $2,400.00 | $3,000.00 | $2,500.00 | $4,600.00 |
| 20 | Bar steel reinforcement HS structures (505.0400) | LB | 32,820 | $2.00 | $1.50 | $2.00 | $1.40 |
| 21 | Bar steel reinforcement HS coated structures (505.0600) | LB | 2,500 | $2.00 | $2.00 | $2.00 | $1.95 |
| 22 | Temporary shoring (structure) 01. B-10-250 (511.1200) | SF | 1,330 | $30.00 | $52.00 | $60.00 | $32.00 |
| 23 | Temporary shoring (structure) 02. B-10-251 (511.1200) | SF | 1,935 | $30.00 | $52.00 | $44.00 | $27.50 |
| 24 | Rubberized membrane waterproofing (516.0500) | SY | 41 | $53.00 | $50.00 | $35.00 | $142.00 |
| 25 | Concrete barrier temporary precast delivered (603.8000) | LF | 550 | $14.00 | $14.00 | $20.00 | $32.00 |
| 26 | Concrete barrier temporary precast installed (603.8125) | LF | 1,650 | $11.00 | $10.00 | $8.00 | $5.80 |
| 27 | Anchoring concrete barrier temporary precast (603.8500) | LF | 1,200 | $13.00 | $12.00 | $2.00 | $12.00 |
| 28 | Riprap heavy (606.0300) | CY | 177 | $84.00 | $70.00 | $80.00 | $87.50 |
| 29 | Crash cushions temporary (614.0905) | EACH | 6 | $5,450.00 | $5,000.00 | $5,000.00 | $2,120.00 |
| 30 | Salvaged rail (614.0920) | LF | 1,295 | $3.00 | $2.50 | $5.00 | $2.85 |
| 31 | Salvaged guardrail end treatments (614.0925) | EACH | 8 | $280.00 | $300.00 | $400.00 | $254.50 |
| 32 | Maintenance and repair of haul roads (project) 01. 1610-02-73 (618.0100) | EACH | 1 | $500.00 | $500.00 | $350.00 | $500.00 |
| 33 | Mobilization (619.1000) | EACH | 1 | $120,000 | $90,000 | $89,408 | $80,545 |
| 34 | Water (624.0100) | MGAL | 20 | $47.00 | $50.00 | $10.00 | $100.00 |
| 35 | Salvaged topsoil (625.0500) | SY | 1,025 | $4.00 | $5.00 | $5.00 | $8.00 |
| 36 | Silt fence (628.1504) | LF | 400 | $3.00 | $5.00 | $3.00 | $2.70 |
| 37 | Silt fence maintenance (628.1520) | LF | 400 | $0.01 | $0.01 | $0.01 | $0.01 |
| 38 | Mobilizations erosion control (628.1905) | EACH | 6 | $500.00 | $360.00 | $1.00 | $425.00 |
| 39 | Mobilizations emergency erosion control (628.1910) | EACH | 3 | $220.00 | $200.00 | $1.00 | $210.00 |
| 40 | Erosion mat urban class I type B (628.2008) | SY | 1,025 | $3.00 | $3.00 | $2.00 | $2.60 |
| 41 | Fertilizer type B (629.0210) | CWT | 1 | $230.00 | $200.00 | $175.00 | $210.00 |
| 42 | Seeding mixture no. 20 (630.0120) | LB | 49 | $20.00 | $20.00 | $10.00 | $18.55 |
| 43 | Seeding temporary (630.0200) | LB | 30 | $9.00 | $9.00 | $5.00 | $9.00 |
| 44 | Seed water (630.0500) | MGAL | 25 | $0.50 | $20.00 | $15.00 | $0.55 |
| 45 | Sign flags permanent type II (637.0620) | EACH | 24 | $300.00 | $300.00 | $200.00 | $15.90 |
| 46 | Field office type B (642.5001) | EACH | 1 | $6,000.00 | $8,000.00 | $2,500.00 | $9,500.00 |
| 47 | Traffic control drums (643.0300) | DAY | 3,640 | $0.60 | $0.55 | $0.50 | $0.25 |
| 48 | Traffic control barricades type III (643.0420) | DAY | 4,720 | $0.50 | $0.50 | $0.45 | $0.50 |
| 49 | Traffic control warning lights type A (643.0705) | DAY | 720 | $0.10 | $0.20 | $0.10 | $0.20 |
| 50 | Traffic control warning lights type C (643.0715) | DAY | 1,920 | $0.10 | $0.15 | $0.10 | $0.10 |
| 51 | Traffic control signs (643.0900) | DAY | 4,840 | $0.60 | $0.55 | $0.50 | $0.40 |
| 52 | Traffic control signs fixed message (643.1000) | SF | 1,009 | $12.50 | $12.00 | $10.90 | $12.80 |
| 53 | Traffic control signs PCMS (643.1050) | DAY | 14 | $46.00 | $50.00 | $40.00 | $65.00 |
| 54 | Temporary marking line removable tape 6-inch (643.3180) | LF | 5,385 | $2.00 | $1.70 | $1.65 | $2.40 |
| 55 | Temporary marking stop line removable tape 18-inch (643.3850) | LF | 48 | $5.00 | $8.00 | $5.00 | $13.55 |
| 56 | Traffic control (643.5000) | EACH | 1 | $23,000 | $15,000 | $2,340.00 | $20,500 |
| 57 | Geotextile type HR (645.0120) | SY | 318 | $4.00 | $5.00 | $3.25 | $6.90 |
| 58 | Geogrid type SR (645.0220) | SY | 575 | $3.00 | $6.00 | $2.50 | $4.20 |
| 59 | Marking line epoxy 6-inch (646.2020) | LF | 1,800 | $2.00 | $3.00 | $2.50 | $2.65 |
| 60 | Marking line grooved wet ref epoxy 6-inch (646.2040) | LF | 1,800 | $5.00 | $4.25 | $4.00 | $4.25 |
| 61 | Marking removal line 4-inch (646.9000) | LF | 3,600 | $1.00 | $1.00 | $0.85 | $1.00 |
| 62 | Construction staking subgrade (650.4500) | LF | 200 | $0.01 | $0.50 | $0.01 | $0.01 |
| 63 | Construction staking base (650.5000) | LF | 200 | $0.01 | $1.00 | $0.01 | $0.01 |
| 64 | Construction staking structure layout (structure) 01. B-10-250 (650.6501) | EACH | 1 | $2,300.00 | $2,600.00 | $2,000.00 | $2,120.00 |
| 65 | Construction staking structure layout (structure) 02. B-10-251 (650.6501) | EACH | 1 | $2,300.00 | $2,900.00 | $2,000.00 | $2,120.00 |
| 66 | Construction staking supplemental control (project) 01. 1610-02-73 (650.9911) | EACH | 1 | $1,300.00 | $1,750.00 | $1,125.00 | $1,195.00 |
| 67 | Construction staking slope stakes (650.9920) | LF | 200 | $0.01 | $3.00 | $0.01 | $0.01 |
| 68 | Temporary traffic signals for bridges (structure) 01. B-10-250 (661.0101) | EACH | 1 | $6,400.00 | $12,000 | $5,600.00 | $16,600 |
| 69 | Temporary traffic signals for bridges (structure) 02. B-10-251 (661.0101) | EACH | 1 | $6,400.00 | $12,000 | $5,600.00 | $16,600 |
| 70 | Sawing asphalt (690.0150) | LF | 160 | $3.00 | $5.00 | $5.00 | $4.85 |
| 71 | Incentive strength concrete structures (715.0502) | DOL | 1,758 | $1.00 | $1.00 | $1.00 | $1.00 |
| 72 | Installing and maintaining bird deterrent system (station) 01. sta 89+45 (999.2000.S) | EACH | 1 | $3,500.00 | $2,000.00 | $1,227.07 | $2,100.00 |
| 73 | Installing and maintaining bird deterrent system (station) 02. sta 26+55 (999.2000.S) | EACH | 1 | $3,500.00 | $2,000.00 | $1,227.07 | $2,100.00 |
| 74 | Special 01. temporary stream diversion culvert B-10-250 (SPV.0060) | EACH | 1 | $11,000 | $35,000 | $50,000 | $81,000 |
| 75 | Special 02. temporary stream diversion culvert B-10-251 (SPV.0060) | EACH | 1 | $25,000 | $35,000 | $35,000 | $79,500 |
| 76 | Special 01.culvert pipe reinforced concrete horizontal elliptical class HE-IV 58X91-inch (SPV.0090) | LF | 307 | $940.00 | $920.00 | $1,325.00 | $1,215.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of October 14, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.